SOR-79-82 Canada Oil and Gas Drilling Regulations

Current to 2019-06-21 · last amended 2009-12-31

Contents

Short Title

s. 1

[Repealed]

Interpretation

s. 2

[Repealed]

Application

s. 3

[Repealed]

Submission of Information

s. 4

[Repealed]

General

Application for Authorization

s. 5

[Repealed]

Conditions of Drilling Program Authorization

s. 6

[Repealed]

s. 7. to 12

[Repealed]

Defective or Experimental Equipment

s. 13

[Repealed]

s. 14

[Repealed]

s. 15

[Repealed]

Support Craft

s. 16

[Repealed]

s. 17

[Repealed]

Standby Craft

s. 18

[Repealed]

s. 19

[Repealed]

s. 20

[Repealed]

Hazards

s. 21

[Repealed]

Requirements for Drilling Units

s. 22

[Repealed]

s. 23. to 29

[Repealed]

Standards For Drilling Equipment

s. 30

[Repealed]

Meteorological Forecasts

s. 31

[Repealed]

s. 32. to 37

[Repealed]

Electrical Equipment

s. 38

[Repealed]

s. 39

[Repealed]

s. 40. to 56

[Repealed]

Small Drilling and Service Rigs

s. 57

[Repealed]

Diving Operations

s. 58

[Repealed]

s. 59

[Repealed]

Blowout Preventer Requirements

s. 60

[Repealed]

s. 61

[Repealed]

s. 62

[Repealed]

Casing

s. 63

[Repealed]

s. 64

[Repealed]

s. 65

[Repealed]

s. 66

[Repealed]

s. 67

[Repealed]

s. 68

[Repealed]

s. 69

[Repealed]

s. 70

[Repealed]

Cementation of Casing

s. 71

[Repealed]

s. 72

[Repealed]

s. 73

[Repealed]

Marine Riser

s. 74

[Repealed]

Drilling Fluid System

s. 75

[Repealed]

Air, Foam and Gas Drilling

s. 76

[Repealed]

Testing Equipment

s. 77

[Repealed]

Manuals

s. 78

[Repealed]

Contingency Plans

s. 79

[Repealed]

Approval to Drill, Approval to Re-enter or Approval to Drill a Test Hole

Prohibition

s. 80

[Repealed]

Notification

s. 81

[Repealed]

Granting, Suspension and Revocation of Approvals

s. 82

[Repealed]

s. 83

[Repealed]

s. 84

[Repealed]

Surface Improvements

s. 85

[Repealed]

Location of Well

s. 86

[Repealed]

s. 87

[Repealed]

s. 88

[Repealed]

Well Prognosis

s. 89

[Repealed]

Evidence of Financial Responsibility

s. 90

[Repealed]

s. 91

[Repealed]

Authorized Entry, Inspection and Investigations

Conservation Officers and Safety Officers

s. 92

[Repealed]

s. 93

[Repealed]

s. 94

[Repealed]

s. 95

[Repealed]

Investigation of Accidents

s. 96

[Repealed]

s. 97

[Repealed]

s. 98

[Repealed]

Drilling of a Well

s. 99

[Repealed]

s. 100

[Repealed]

Safety Zone

s. 101

[Repealed]

Availability of Regulations

s. 102

[Repealed]

Display of Authorizations, Approvals and Critical Procedures

s. 103

[Repealed]

Surveys

s. 104

[Repealed]

Well Control Equipment

s. 105

[Repealed]

s. 106

[Repealed]

s. 107

[Repealed]

s. 108

[Repealed]

Safety Valves

s. 109

[Repealed]

Choke Manifold

s. 110

[Repealed]

Flow Lines from Wells

s. 111

[Repealed]

s. 111.1

[Repealed]

s. 111.2

[Repealed]

Flare Line and Flare Pit

s. 112

[Repealed]

Protection of Permafrost

s. 113

[Repealed]

Pressure Tests of Casing and Preventers

s. 114

[Repealed]

s. 115

[Repealed]

s. 115.1

[Repealed]

s. 116

[Repealed]

Coal and Mineral Deposits

s. 117

[Repealed]

Cementation

s. 118

[Repealed]

s. 119

[Repealed]

Waiting on Cement Time

s. 120

[Repealed]

Maximum Pressure During Well Stimulation

s. 121

[Repealed]

Formation Leak-Off Test

s. 122

[Repealed]

Monitoring of Drilling

s. 123

[Repealed]

s. 124

[Repealed]

Volume of Drilling Fluid

s. 125

[Repealed]

s. 126

[Repealed]

Pressure Transition Zone

s. 127

[Repealed]

Directional and Deviation Surveys

s. 128

[Repealed]

Plugging Back of Wells

s. 129

[Repealed]

Drilling Unsafe to Continue

s. 130

[Repealed]

Inspections and Tests of Equipment

s. 131

[Repealed]

s. 132

[Repealed]

Inspection of Electrical Equipment

s. 133

[Repealed]

s. 134

[Repealed]

Quantities of Consumables

s. 135

[Repealed]

Bulk Handling of Fuel and Consumables

s. 136

[Repealed]

Waste Material

s. 137

[Repealed]

s. 138

[Repealed]

s. 139

[Repealed]

Radio and Support Craft Procedures

s. 140

[Repealed]

s. 141

[Repealed]

s. 142

[Repealed]

Moving Drilling Units

s. 143

[Repealed]

Anchors

s. 144

[Repealed]

Stability

s. 145

[Repealed]

s. 146

[Repealed]

Safety and Training of Personnel

General

s. 147

[Repealed]

General Safety

s. 148

[Repealed]

s. 149

[Repealed]

Training of Personnel

s. 150

[Repealed]

Safety Drills

s. 151

[Repealed]

s. 152. and 153

[Repealed]

Safety Instruction

s. 154

[Repealed]

Rest Period

s. 155

[Repealed]

s. 156. and 157

[Repealed]

Smoking

s. 158

[Repealed]

s. 159. to 163

[Repealed]

Radioactive Substances

s. 164

[Repealed]

s. 165

[Repealed]

s. 166. to 168

[Repealed]

Operational Records and Reports

General

Safety and Well Evaluation Information

s. 169

[Repealed]

Reference for Well Depths

s. 170

[Repealed]

Notification of Significant Event

s. 171

[Repealed]

Notifications to Conservation Engineer

s. 172

[Repealed]

Submission of Survey Plan

s. 173

[Repealed]

Tour Sheets and Barge Reports

s. 174

[Repealed]

s. 175

[Repealed]

s. 176

[Repealed]

s. 177

[Repealed]

Daily Records

s. 178

[Repealed]

Routine Reports

s. 179

[Repealed]

Downhole Survey Record

s. 180

[Repealed]

Penetration and Gas Content Records

s. 181

[Repealed]

Formation Flow Records

s. 182

[Repealed]

Report of Structural Faults

s. 183

[Repealed]

Well Termination Report

s. 184

[Repealed]

Press Releases

s. 185

[Repealed]

Well Evaluation

General

s. 186

[Repealed]

Drill Cuttings

s. 187

[Repealed]

Cores

s. 188

[Repealed]

s. 189

[Repealed]

Gas Content of Drilling Fluid

s. 190

[Repealed]

Wireline Logs

s. 191

[Repealed]

s. 192

[Repealed]

s. 193

[Repealed]

s. 194

[Repealed]

s. 195

[Repealed]

Testing and Sampling of Formations

s. 196

[Repealed]

Formation Flow Test

s. 197

[Repealed]

s. 198

[Repealed]

s. 199

[Repealed]

s. 200

[Repealed]

s. 201

[Repealed]

s. 202

[Repealed]

Well Termination

Application

s. 203

[Repealed]

Removal of Casing

s. 204

[Repealed]

Surface Marking and Restoration

s. 205

[Repealed]

s. 206

[Repealed]

Drilling Rig Removal Prohibited

s. 207

[Repealed]

Operator Responsible for Abandoned Wells

s. 208

[Repealed]

s. 209

[Repealed]

Location of Abandonment Plugs

s. 210

[Repealed]

s. 211

[Repealed]

Length and Quality of Cement Plugs

s. 212

[Repealed]

Feeling for Plugs

s. 213

[Repealed]

Termination of Test Holes

s. 214

[Repealed]

s. 215

[Repealed]

Marking of Well-heads

s. 216

[Repealed]

Fluid in Abandoned or Suspended Wells

s. 217

[Repealed]

Suspended Wells

s. 218

[Repealed]

s. 219

[Repealed]

Well Completion

s. 220

[Repealed]

Deposition of Samples from a Well

General

s. 221

[Repealed]

s. 222

[Repealed]

Drill Cuttings

s. 223

[Repealed]

Sidewall Cores

s. 224

[Repealed]

Conventional Cores

s. 225

[Repealed]

Analysis of Fluid Samples

s. 226

[Repealed]

Delivery of Samples and Other Materials to Chief

s. 227

[Repealed]

Final Well Reports

Exploratory and Development Wells

s. 228

[Repealed]

Test Holes

s. 229

[Repealed]

[Repealed, SOR/96-116, s. 41]

Offences

s. 234

[Repealed]

s. 235

[Repealed]