Majority
Plaintiff and appellant brought this action under section 725, subdivision (b), of the Streets and Highways Code, against defendants and respondents to restrain obstruction of a claimed natural water channel.
Defendants own three 40-acre sections of land near Mecca, on Highway 195, commonly known as Box Canyon Road, a secondary highway which crosses said property in an east-west direction. The slope of the land in this vicinity and the natural drainage is from the mountains to the north, in a general southerly direction toward the Saltón Sea. This was formerly a county road taken over by the state, and from
In 1946, the Flood Control Works of the Coachella Valley Canal were completed. This construction was in progress in 1945, and its purpose was to protect not only the main (All American) Canal to the Coachella Valley but also the lands, utilities, railroads, and highways, and other properties below the canal from overflow damage from storm waters or surface waters. This project lies approximately 1% miles north of Highway 195, from the point here involved and effectually disposes of both surface and flood waters from a range of rocky and barren mountains to the north. The only waters involved in this action are those originating south of the canal and north of and on Highway 195, and covering an area of approximately 325 acres. In July, 1953, defendants acquired their property. They were assessed $5.00 per acre per year for each acre available for irrigation purposes, whether the water was used or not. As soon as the water was made available defendants proceeded to level their land for agricultural purposes. There was no controversy until defendants, in preparing their land to the south for planting operations, and believing that all possible flow and drainage difficulties had been solved by the construction of the Flood Control Works, constructed a large bank of earth referred to as a dike, across the old channel or watercourse adjacent to the south side of the dip in the highway. It closed off the wash at that point. This resulted in a dip in the road with embankments on both sides of it of ap
There is a conflict of opinions as to whether surface waters which might accumulate in the area below the flood control canal will find their way through this particular course in the future. The bulk of the evidence is that there has not been sufficient rain in the area since 1945 to cause any runoff which would affect this old watercourse or drainage course to any extent. There is evidence that an irrigator leasing property to the north allowed irrigation water to escape and run into the dip one night; that 18 inches of water accumulated in the bottom of the dip; and that a traffic hazard resulted because there was no means for the water to escape on account of the construction of the embankment to the south on defendants’ property.
Since the case was tried in the lower court plaintiff’s counsel, on appeal, now contend they discovered that on February 3, 1955, a rainstorm occurred in that area and the road foreman observed water on the road in the bottom of the dip to a depth of about 6 inches in the center of the highway, and approximately 18 inches at the edge of the pavement. He offered a photograph so indicating. The request now is to produce this additional evidence in this court in determining the merits of this appeal. A motion for new trial was made March 11, 1955, and the only excuse for not offering this evidence at that time is that the foreman did not tell counsel of this fact until shortly before this appeal had been taken. The source of the water thus accumulated is not indicated, but from the photograph it might well appear that it was water that flowed upon and ran down the highway into the dip. This evidence, even if considered by this court, would not be conclusive of the question here presented. The application should therefore be denied.
The main argument presented by the pleadings and statements of counsel, as we see it, is who should bear the burden of paying the cost of filling the dip and bringing it to the grade level of the surrounding territory. Defendants in their answer allege that any apprehended injury or damage to the state highway would be removed by filling the dip to the grade of the adjacent level land; that defendant offered to cooperate with the state and pay an equitable cost of filling it, and again renewed that offer. In reply to the court’s inquiry as to this offer plaintiff’s counsel stated
The court specifically found, upon conflicting evidence it is true, that a watercourse or natural channel did not exist north of the highway, and found, at least by inference, that since the construction of the flood control project, no water followed the former watercourse or natural drainage channel theretofore existing, either above or below the highway. Under this finding, which has evidentiary support, one cannot be enjoined from obstructing something that does not presently exist.
Plaintiff concedes in its brief that its concern is with those “waters which, under conditions as they existed at the time of trial, would flow across its highway.”
Every landowner must bear the burden of receiving upon his land the surface water naturally falling upon land above it and naturally flowing to it therefrom, and he has the corresponding right to have the surface water naturally falling upon his land or naturally coming upon it, flow freely therefrom upon the lower land adjoining, as it would flow under natural conditions. (Heier v. Krull, 160 Cal. 441 [ 117 P. 530 ].)
No case or authority is cited which prevents a landowner from leveling his land in order that it may be devoted to agricultural projects so long as adequate provision is made for the natural flow of drainage water, if any. (Turner v. Hopper, 83 Cal.App.2d 215 [ 188 P.2d 257 ].)
It is true that water may flow into the dip from surface water falling on the highway leading into the dip and may cause some danger to the traveling public, but this portion of the highway could not be classified as a natural drainage or watercourse, particularly where the state created
Application to take additional evidence denied. Judgment affirmed.
Barnard, P. J., and Mussell, J., concurred.
A petition for a rehearing was denied March 27, 1956, and appellant’s petition for a hearing by the Supreme Court was denied May 2, 1956.
Cases cited
- Heier v. Krull 160 Cal. 441 p. 733
- Turner v. Hopper 83 Cal.App.2d 215 p. 733
- Robinson v. County of San Diego 115 Cal.App. 153 p. 734