Versions of s. 108(6)

N-7 — National Energy Board Act · 2 versions

Historical text comes from the Justice Laws point-in-time corpus and is unofficial — not the official version.

  1. 2013-07-03 to present available View Source
    The appropriate authority may grant leave underIn this sectionsection, afterutility constructionmeans a highway, an irrigation ditch, a publicly owned or operated drainage system, sewer or dike, an underground telegraph or telephone line or a line for the transmission of thehydrocarbons, proposedelectricity workor hasany commencedother if the appropriate authority is satisfied that the work was urgently required and, prior to the commencement of construction, the appropriate authority was notified of the company’s intention to proceed with the proposed work.substance.
    Full text

    In this section, utility means a highway, an irrigation ditch, a publicly owned or operated drainage system, sewer or dike, an underground telegraph or telephone line or a line for the transmission of hydrocarbons, electricity or any other substance.

  2. 2002-12-31 to present View Source

    The appropriate authority may grant leave under this section after construction of the proposed work has commenced if the appropriate authority is satisfied that the work was urgently required and, prior to the commencement of construction, the appropriate authority was notified of the company’s intention to proceed with the proposed work.