← Historical versions

Versions of s. 81(2)

N-7 — National Energy Board Act · 2 versions

Historical text comes from the Justice Laws point-in-time corpus and is unofficial — not the official version.

  1. 2005-04-20 to present available View Source
    Notwithstanding subsection (1), leave from the Board is not required in the case of a well taking oil or gas from lands lying under a pipeline or any of the works connected therewith if the well is not drilled within forty metres of the pipeline.
    Full text

    Notwithstanding subsection (1), leave from the Board is not required in the case of a well taking oil or gas from lands lying under a pipeline or any of the works connected therewith if the well is not drilled within forty metres of the pipeline.

  2. 2002-12-31 to present View Source

    Notwithstanding subsection (1), leave from the Board is not required in the case of a well taking oil or gas from lands lying under a pipeline or any of the works connected therewith if the well is not drilled within forty metres of the pipeline.