UKPGA-2004-5 Planning and Compulsory Purchase Act 2004 UK

Current to 2026-07-29

Contents
preamble

Be it enacted by the Queen’s most Excellent Majesty, by and with the advice and consent of the Lords Spiritual and Temporal, and Commons, in this present Parliament assembled, and by the authority of the same, as follows:—

Part 1

Regional functions

Spatial strategy

s. 1 — Regional Spatial Strategy

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Planning bodies

s. 2 — Regional planning bodies

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 3 — RPB: general functions

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 4 — Assistance from certain local authorities

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 4A — Delegation of RPB functions to regional development agencies

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

RSS revision

s. 5 — RSS: revision

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 6 — RSS: community involvement

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 7 — RSS: Secretary of State’s functions

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 8 — RSS: examination in public

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 9 — RSS: further procedure

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 10 — Secretary of State: additional powers

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Supplementary

s. 11 — Regulations

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 12 — Supplementary

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Part 1A

Strategic plan-making

Strategic planning authorities and strategic planning boards

s. 12A — Spatial development strategy to be produced by strategic planning authorities
s. 12A(1)

This Part requires strategic planning authorities to prepare a document, conforming to section 12D, known as a “spatial development strategy”.

s. 12A(2)

In this Part “strategic planning authority” means—

s. 12A(2)(a)

a strategic planning board (see section 12B);

s. 12A(2)(b)

a combined authority;

s. 12A(2)(c)

a combined county authority;

s. 12A(2)(d)

an upper-tier county council for an area no part of which forms part of the area of a combined authority or a combined county authority;

s. 12A(2)(e)

a unitary authority for an area—

s. 12A(2)(e)(i)

that is in England, and

s. 12A(2)(e)(ii)

no part of which forms part of the area of a combined authority or a combined county authority.

s. 12A(3)

But a principal authority that is a constituent authority of a strategic planning board is not a strategic planning authority for the purposes of this Part.

s. 12A(3A)

Where there is a mayor for the area of a combined authority or combined county authority, the functions of the authority under this Part as a strategic planning authority are functions of the authority exercisable only by the mayor on behalf of the authority.

s. 12A(4)

In this Part “strategy area”, in relation to a spatial development strategy, means—

s. 12A(4)(a)

in the case of a strategic planning board, the area consisting of the areas of the constituent authorities of the board;

s. 12A(4)(b)

in the case of a combined authority, the area of the combined authority;

s. 12A(4)(c)

in the case of a combined county authority, the area of the combined county authority;

s. 12A(4)(d)

in the case of an upper-tier county council, the area of the upper-tier county council;

s. 12A(4)(e)

in the case of a unitary authority, the area of the unitary authority.

s. 12A(5)

Any function of a strategic planning authority exercisable by or under this Part by a principal authority is not a function to which either of the following provisions of the Local Government Act 1972 applies—

s. 12A(5)(a)

section 101(1)(b);

s. 12A(5)(b)

section 101(5).

s. 12A(6)

For provision about the spatial development strategy for London, see (in particular) sections 334 to 343 of the Greater London Authority Act 1999.

s. 12A(7)

In this Part “principal authority” means a body specified in any of paragraphs (b) to (e) of subsection (2).

s. 12B — Strategic planning boards
s. 12B(1)

This section applies where the Secretary of State considers that it is desirable for a spatial development strategy to relate to an area consisting of the areas of two or more principal authorities.

s. 12B(2)

Subject to subsection (4), the Secretary of State may by regulations establish a joint committee of the authorities to exercise functions under this Part in relation to an area consisting of the areas of those authorities (the “constituent authorities”).

s. 12B(3)

Such a committee is to be known as a “strategic planning board”.

s. 12B(4)

The Secretary of State may make regulations under subsection (2) establishing a strategic planning board only after consulting the following on a draft of the proposed regulations—

s. 12B(4)(a)

the principal authorities that are to be the constituent authorities of the board,

s. 12B(4)(b)

any local planning authority for an area that is wholly or partly within, or adjoins, the area of any of those authorities, and

s. 12B(4)(c)

the person responsible for preparing a spatial development strategy for an area that adjoins the area of any of those authorities.

s. 12B(5)

Where the Secretary of State is considering whether to, or has decided to, establish a strategic planning board, the Secretary of State may direct the principal authorities that are to be the constituent authorities of the board not to take any step, or any further step, or not to take a step specified in the direction, in connection with the preparation of their own spatial development strategies.

s. 12C — Regulations about strategic planning boards
s. 12C(1)

Strategic planning board regulations that establish a strategic planning board must specify—

s. 12C(1)(a)

the constituent authorities of the board, and

s. 12C(1)(b)

the area in relation to which the board exercises functions under this Part.

s. 12C(2)

Strategic planning board regulations may make provision about—

s. 12C(2)(a)

the composition of a strategic planning board (including about the appointment of members to the board or any sub-committee of the board);

s. 12C(2)(b)

the proceedings of a strategic planning board and of any sub-committee of the board (including provision about voting rights);

s. 12C(2)(c)

such other matters as the Secretary of State considers are necessary or expedient to facilitate the exercise by a strategic planning board of its functions under this Part.

s. 12C(3)

Provision of the kind mentioned in subsection (2)(c) may include provision—

s. 12C(3)(a)

corresponding to provisions relating to joint committees in Part 6 of the Local Government Act 1972;

s. 12C(3)(b)

applying (with or without modifications) such enactments relating to local authorities as the Secretary of State considers appropriate;

s. 12C(3)(c)

requiring the making by a constituent authority of payments towards the costs of the strategic planning board;

s. 12C(3)(d)

modifying the application of this Part in relation to a strategic planning board.

s. 12C(4)

For the purposes of subsection (3)(b) a local authority is any of the following—

s. 12C(4)(a)

a county council;

s. 12C(4)(b)

a district council;

s. 12C(4)(c)

a London borough council.

s. 12C(5)

If strategic planning board regulations establishing a strategic planning board are annulled in pursuance of a resolution of either House of Parliament, the strategic planning board is dissolved with effect from the date of the resolution.

s. 12C(6)

The Secretary of State’s power to make strategic planning board regulations that amend or revoke other strategic planning board regulations—

s. 12C(6)(a)

is exercisable whether or not the constituent authorities of the strategic planning board in question request an amendment or revocation;

s. 12C(6)(b)

is exercisable only after the Secretary of State has consulted the following on a draft of the proposed regulations—

s. 12C(6)(b)(i)

the strategic planning board in question,

s. 12C(6)(b)(ii)

the constituent authorities of that board,

s. 12C(6)(b)(iii)

any local planning authority for an area that is wholly or partly within, or adjoins, the area of any of those authorities, and

s. 12C(6)(b)(iv)

the person responsible for preparing a spatial development strategy for an area that adjoins the area of any of those authorities.

s. 12C(7)

The condition in section 12B(1) does not apply in relation to strategic planning board regulations that amend or revoke other strategic planning board regulations.

s. 12C(8)

In this section “strategic planning board regulations” means regulations under section 12B(2).

Contents of spatial development strategy

s. 12D — Contents of spatial development strategy
s. 12D(1)

A spatial development strategy must include a statement of the strategic planning authority’s policies (however expressed), in relation to the development and use of land in the strategy area, which are of strategic importance to that area.

s. 12D(2)

A spatial development strategy must include a reasoned justification for the policies referred to in subsection (1).

s. 12D(3)

A spatial development strategy must specify the period for which it is to have effect.

s. 12D(4)

A spatial development strategy may specify or describe infrastructure the provision of which the strategic planning authority considers to be of strategic importance to the strategy area for the purposes of—

s. 12D(4)(a)

supporting or facilitating development in that area,

s. 12D(4)(b)

mitigating, or adapting to, climate change, or

s. 12D(4)(c)

promoting or improving the economic, social or environmental well-being of that area.

s. 12D(5)

A spatial development strategy may specify or describe—

s. 12D(5)(a)

an amount or distribution of housing (of any kind), the provision of which the strategic planning authority considers to be of strategic importance to the strategy area;

s. 12D(5)(b)

an amount or distribution of affordable housing or any other kind of housing, the provision of which the strategic planning authority considers to be of strategic importance to the strategy area.

s. 12D(6)

For the purposes of subsections (1), (4) and (5), a matter may be of strategic importance to a strategy area even if it affects only part of that area.

s. 12D(7)

The Secretary of State may prescribe further matters a spatial development strategy may, or must, deal with.

s. 12D(8)

A spatial development strategy must contain such diagrams, illustrations or other descriptive or explanatory matter relating to its contents as may be prescribed.

s. 12D(9)

A spatial development strategy may make different provision for different cases or for different parts of the strategy area.

s. 12D(10)

A spatial development strategy must be designed to secure that the use and development of land in the strategy area contribute to the mitigation of, and adaptation to, climate change.

s. 12D(11)

A spatial development strategy must take account of any local nature recovery strategy, under section 104 of the Environment Act 2021, that relates to any part of the strategy area, including in particular—

s. 12D(11)(a)

the areas identified in the strategy as areas which—

s. 12D(11)(a)(i)

are, or could become, of particular importance for biodiversity, or

s. 12D(11)(a)(ii)

are areas where the recovery or enhancement of biodiversity could make a particular contribution to other environmental benefits,

s. 12D(11)(b)

the priorities set out in the strategy for recovering or enhancing biodiversity, and

s. 12D(11)(c)

the proposals set out in the strategy as to potential measures relating to those priorities.

s. 12D(12)

A spatial development strategy must not—

s. 12D(12)(a)

include anything that is not permitted or required by or under the preceding provisions of this section,

s. 12D(12)(b)

specify particular sites where development should take place, or

s. 12D(12)(c)

be inconsistent with or (in substance) repeat any national development management policy.

s. 12D(13)

The Secretary of State may prescribe—

s. 12D(13)(a)

the form of a spatial development strategy;

s. 12D(13)(b)

documents that must accompany a spatial development strategy.

s. 12D(14)

In subsection (5) “affordable housing” means—

s. 12D(14)(a)

social housing within the meaning of Part 2 of the Housing and Regeneration Act 2008, and

s. 12D(14)(b)

any other description of housing that may be prescribed.

Spatial development strategy timetable

s. 12E — Timetable for preparing spatial development strategy
s. 12E(1)

A strategic planning authority must prepare and maintain a document relating to its spatial development strategy, known as a “spatial development strategy timetable”.

s. 12E(2)

A spatial development strategy timetable must specify—

s. 12E(2)(a)

the strategy area, and

s. 12E(2)(b)

a timetable for the preparation of the strategy that is consistent with this Part and any regulations made under it.

s. 12E(3)

The Secretary of State may prescribe—

s. 12E(3)(a)

the form and content of a spatial development strategy timetable;

s. 12E(3)(b)

further matters the timetable must deal with.

s. 12F — Spatial development strategy timetable: further provision
s. 12F(1)

A strategic planning authority must submit its draft spatial development strategy timetable to the Secretary of State within such period as may be prescribed.

s. 12F(2)

The Secretary of State may direct the strategic planning authority to make specified amendments to the draft timetable.

s. 12F(3)

If the Secretary of State has not given such a direction to the strategic planning authority within the period of four weeks beginning with the date when the timetable was sent to the Secretary of State, the strategic planning authority may bring the timetable into effect.

s. 12F(4)

A strategic planning authority to which a direction under subsection (2) is given—

s. 12F(4)(a)

must submit a revised draft spatial development strategy timetable to the Secretary of State within the period specified in the direction, and

s. 12F(4)(b)

may bring the timetable into effect only when the Secretary of State approves the timetable as revised in accordance with that direction or any further direction under subsection (2).

s. 12F(5)

If a strategic planning authority—the Secretary of State may prepare a spatial development strategy timetable and direct the strategic planning authority to bring it into effect.

s. 12F(5)(a)

does not comply with subsection (1), or

s. 12F(5)(b)

does not comply with subsection (4)(a),

s. 12F(6)

A direction under subsection (2) or (5) must contain the Secretary of State’s reasons for giving it.

s. 12F(7)

To bring a spatial development strategy timetable into effect, a strategic planning authority must publish it, together with a statement that the timetable has effect.

s. 12F(8)

A strategic planning authority must comply with a spatial development strategy timetable that has effect.

s. 12F(9)

The Secretary of State may by regulations make provision as to when, or the circumstances in which, a strategic planning authority must revise a spatial development strategy timetable that has effect.

s. 12F(10)

Regulations under subsection (9)—

s. 12F(10)(a)

may provide that revisions of a spatial development strategy timetable must be approved by the Secretary of State;

s. 12F(10)(b)

may confer a power to direct that a timetable is to be revised or that revisions require the approval of the Secretary of State.

Preparation and adoption of spatial development strategy

s. 12G — Preparation of draft spatial development strategy
s. 12G(1)

A strategic planning authority must prepare a draft of its spatial development strategy.

s. 12G(2)

In doing so, a strategic planning authority must have regard to—

s. 12G(2)(a)

any strategy, plan or policy published by the strategic planning authority that the strategic planning authority considers to be relevant,

s. 12G(2)(b)

the effect which the proposed spatial development strategy would have on each of the following—

s. 12G(2)(b)(i)

the health of persons in the strategy area;

s. 12G(2)(b)(ii)

health inequalities between persons living in the strategy area;

s. 12G(2)(b)(iii)

the achievement of sustainable development;

s. 12G(2)(c)

the need to ensure that the strategy is consistent with current national policies;

s. 12G(2)(d)

any other prescribed matters.

s. 12G(2A)

The Secretary of State must make regulations under subsection (2)(d) which prescribe the desirability of prioritising development on land that has been previously developed.

s. 12G(3)

In subsection (2)(a), the reference to any strategy, plan or policy published by a strategic planning authority includes a reference to any strategy, plan or policy published by a constituent authority of a strategic planning board.

s. 12H — Consultation and representations
s. 12H(1)

A strategic planning authority that has prepared a draft spatial development strategy must—

s. 12H(1)(a)

publish the draft strategy on the authority’s website,

s. 12H(1)(b)

notify the persons specified in subsection (2) that the draft strategy has been published on the authority’s website, and

s. 12H(1)(c)

make copies of the draft strategy available for inspection at the authority’s principal office and at any other place that the authority considers appropriate.

s. 12H(2)

The persons referred to in subsection (1)(b) are—

s. 12H(2)(a)

the Secretary of State,

s. 12H(2)(b)

any county council for an area that is within, or any part of which is within, the strategy area,

s. 12H(2)(c)

any district council for an area that is within the strategy area,

s. 12H(2)(d)

any county council or district council for an area that adjoins the strategy area and is affected by the strategy,

s. 12H(2)(e)

any local planning authority for an area that is wholly or partly within, or adjoins, the strategy area and is affected by the strategy,

s. 12H(2)(f)

the person responsible for preparing a spatial development strategy for an area that adjoins the strategy area and is affected by the strategy,

s. 12H(2)(g)

such other persons as may be prescribed, and

s. 12H(2)(h)

such other persons as the strategic planning authority considers appropriate.

s. 12H(3)

In exercising its discretion under subsection (2)(h) the strategic planning authority must consider notifying (at least) the following about the publication of the draft spatial development strategy—

s. 12H(3)(a)

voluntary bodies some or all of whose activities benefit the whole or part of the strategy area,

s. 12H(3)(b)

bodies which represent the interests of different racial, ethnic or national groups in the strategy area,

s. 12H(3)(c)

bodies which represent the interests of different religious groups in the strategy area, and

s. 12H(3)(d)

bodies which represent the interests of different persons carrying on business in the strategy area.

s. 12H(4)

Where a strategic planning authority—the authority must also publish or make available a statement inviting representations to be made to the authority about the strategy.

s. 12H(4)(a)

publishes a draft spatial development strategy as required by subsection (1)(a), or

s. 12H(4)(b)

makes such a strategy available for inspection as required by subsection (1)(c),

s. 12H(5)

A notification of a person under subsection (1)(b) about a draft spatial development strategy must include an invitation to the person to make representations to the strategic planning authority about the strategy.

s. 12H(6)

An invitation to a person under subsection (4) or (5) must explain the effect of regulations under subsection (7).

s. 12H(7)

Representations must be made—

s. 12H(7)(a)

in the prescribed form and manner;

s. 12H(7)(b)

within the prescribed period.

s. 12H(8)

In subsection (1)—

s. 12H(8)(a)

references to a strategic planning authority’s website include references to the website of a constituent authority of a strategic planning board;

s. 12H(8)(b)

the reference to a strategic planning authority’s principal office includes a reference to the principal office of a constituent authority of a strategic planning board.

s. 12I — Public examination
s. 12I(1)

A strategic planning authority that has prepared a draft spatial development strategy must, unless the Secretary of State otherwise directs, make arrangements for an examination of the draft strategy to be held in public.

s. 12I(2)

Such an examination is to be conducted by a person appointed by the Secretary of State (the “examiner”).

s. 12I(3)

The matters examined at an examination are to be such matters affecting the consideration of the spatial development strategy as the examiner considers appropriate.

s. 12I(4)

The following may take part in an examination—

s. 12I(4)(a)

the strategic planning authority that prepared the strategy, and

s. 12I(4)(b)

any person invited to do so by the examiner.

s. 12I(5)

No person is to have a right to be heard at an examination.

s. 12I(6)

On conclusion of the examination, the examiner must make a report to the strategic planning authority that prepared the strategy.

s. 12I(7)

The report may recommend that specified modifications are made to the draft strategy before it is adopted.

s. 12I(8)

The report may recommend that the draft strategy is withdrawn.

s. 12I(9)

The strategic planning authority must publish the report.

s. 12J — Withdrawal before adoption
s. 12J(1)

A strategic planning authority may withdraw its draft spatial development strategy at any time before arrangements are made for its examination.

s. 12J(2)

Subsection (3) applies at any time after arrangements have been made for examination of a draft spatial development strategy (but before it is adopted).

s. 12J(3)

The strategic planning authority that prepared the draft strategy may withdraw it only if—

s. 12J(3)(a)

the Secretary of State so directs, or

s. 12J(3)(b)

the examiner recommends that it is withdrawn, and the Secretary of State has not directed that it is not to be withdrawn.

s. 12J(4)

The steps taken by a strategic planning authority to withdraw a draft strategy must include—

s. 12J(4)(a)

deleting the strategy from the website on which it was published;

s. 12J(4)(b)

removing copies of the strategy that were made available for inspection;

s. 12J(4)(c)

notifying the following that the strategy has been withdrawn—

s. 12J(4)(c)(i)

each person to whom a notification under section 12H(1)(b) was required to be given;

s. 12J(4)(c)(ii)

any person, not within sub-paragraph (i), who made representations in accordance with regulations under section 12H(7).

s. 12K — Submission to Secretary of State before adoption
s. 12K(1)

This section applies where—

s. 12K(1)(a)

a draft spatial development strategy has been published under section 12H,

s. 12K(1)(b)

the prescribed period for the making of representations (see section 12H(7)) has elapsed,

s. 12K(1)(c)

either—

s. 12K(1)(c)(i)

the strategic planning authority that prepared the draft strategy has published the examiner’s report on it (see section 12I(9)), or

s. 12K(1)(c)(ii)

no examination of the draft strategy is needed because of a direction under section 12I(1), and

s. 12K(1)(d)

the draft strategy has not been withdrawn (see section 12J).

s. 12K(2)

The strategic planning authority must—

s. 12K(2)(a)

consider any representations received in accordance with regulations under section 12H(7) and decide whether to make any modifications as a result,

s. 12K(2)(b)

if an examination was held, consider the examiner’s report and decide whether to make any modifications that the examiner recommends, and

s. 12K(2)(c)

consider whether to make any other modifications to take account of—

s. 12K(2)(c)(i)

any national development management policies so far as material, or

s. 12K(2)(c)(ii)

any other material considerations.

s. 12K(3)

After such consideration and (if considered appropriate) modification, the strategic planning authority must submit the draft spatial development strategy to the Secretary of State, stating that the authority intends to adopt it.

s. 12K(4)

The strategic planning authority must inform the Secretary of State of—

s. 12K(4)(a)

any modifications made to the published draft strategy, and the reasons for making them;

s. 12K(4)(b)

any modifications to the published draft strategy that the examiner recommended but which the authority has not made, and the reasons for not making them.

s. 12K(5)

If the Secretary of State considers that a submitted spatial development strategy is—the Secretary of State may, within the relevant period, direct the strategic planning authority to make specified modifications of the strategy in order to deal with the inconsistency or detriment.

s. 12K(5)(a)

inconsistent with current national policies, or

s. 12K(5)(b)

detrimental to the interests of an area outside the strategy area,

s. 12K(6)

In this section “the relevant period”, in relation to a spatial development strategy, means—

s. 12K(6)(a)

the period of six weeks beginning with the date when the strategy was submitted to the Secretary of State, or

s. 12K(6)(b)

such longer period as is specified by the Secretary of State in a direction given within the period specified in paragraph (a) to the authority that submitted the strategy.

s. 12L — Adoption of spatial development strategy
s. 12L(1)

A spatial development strategy must not be adopted by a strategic planning authority unless it is in the form submitted to the Secretary of State under section 12K, subject to any modifications directed to be made under subsection (5) of that section.

s. 12L(2)

A spatial development strategy must not be adopted by a strategic planning authority unless—

s. 12L(2)(a)

the relevant period (as defined in section 12K(6)) has elapsed,

s. 12L(2)(b)

the authority has complied with any requirement of regulations under this Part for steps to be taken, or a period to elapse, before a strategy may be adopted, and

s. 12L(2)(c)

if a direction was given to the authority under section 12K(5), the Secretary of State confirms that the Secretary of State is content with the modified strategy.

s. 12L(3)

A strategic planning authority must hold a vote on a resolution to adopt its spatial development strategy as soon as reasonably practicable after the conditions in subsection (2) are satisfied.

s. 12L(4)

Subsections (4A) to (5) apply in relation to the adoption of a spatial development strategy by—

s. 12L(4)(a)

a combined authority, or

s. 12L(4)(b)

a combined county authority.

s. 12L(4A)

In the case of a non-mayoral combined authority or non-mayoral combined county authority, a resolution to adopt the strategy is to be made by a simple majority of the constituent members present and voting on that resolution at a meeting of the authority.

s. 12L(4B)

In the case of a mayoral combined authority or mayoral combined county authority, a resolution to adopt the strategy is to be made by a simple majority of the relevant members present and voting on that resolution at a meeting of the authority; and such a majority must include the mayor, or the deputy mayor acting in place of the mayor.

s. 12L(4C)

But if—the decision is to be made by a simple majority of the other relevant members present and voting on that question at a meeting of the authority.

s. 12L(4C)(a)

the office of mayor is vacant, and

s. 12L(4C)(b)

there is no deputy mayor,

s. 12L(4D)

In the case of a resolution by a non-mayoral combined authority or non-mayoral combined county authority—

s. 12L(4D)(a)

each constituent member has one vote;

s. 12L(4D)(b)

in the case of a tied vote—

s. 12L(4D)(b)(i)

no person has a casting vote; and

s. 12L(4D)(b)(ii)

the authority must be regarded as having disagreed to the question that the decision should be made.

s. 12L(5)

In the case of a resolution of a mayoral combined authority or mayoral combined county authority—

s. 12L(5)(a)

each relevant member has one vote;

s. 12L(5)(b)

in the event of a tied vote then (unless it is a case where subsection (4C) applies), the mayor, or the deputy mayor acting in place of the mayor, has a casting vote (in addition to any other vote the mayor or deputy mayor may have).

s. 12L(5)

In the event of a tied vote on whether to pass a resolution to adopt the strategy, the mayor of the authority has a casting vote (in addition to any other vote the mayor may have).

s. 12L(6)

A strategic planning authority that has adopted a spatial development strategy must publish the strategy together with a statement that it has been adopted.

s. 12L(7)

A spatial development strategy becomes operative when it is published.

s. 12L(8)

In this section—“constituent member”, in relation to a combined authority or combined county authority—means a person appointed by a constituent council to be a member of the authority; and also includes a person acting as a member of the authority in the absence of such a member; and here “constituent council” has the meaning given in section 104(11) of the Local Democracy, Economic Development and Construction Act 2009 (in relation to a combined authority) or section 10(11) of the Levelling-up and Regeneration Act 2023 (in relation to a combined county authority);“relevant member”, in relation to mayoral combined authority or mayoral combined county authority means—a constituent member, or the mayor, and also includes the deputy mayor acting in place of the mayor.

Review, alteration and replacement of spatial development strategy

s. 12M — Review and monitoring
s. 12M(1)

This section applies in relation to an operative spatial development strategy.

s. 12M(2)

A strategic planning authority must keep under review the matters which may be expected to affect the development of the strategy area or the planning of its development or which are otherwise relevant to the content of the strategy.

s. 12M(3)

In exercising functions under subsection (2), a strategic planning authority must—

s. 12M(3)(a)

if the authority identifies matters to be kept under review that relate to the area of a local planning authority that is outside the strategy area, consult that local planning authority about those matters;

s. 12M(3)(b)

if the authority identifies matters to be kept under review that relate to the area of a person responsible for preparing a spatial development strategy that is outside the strategy area, consult that person about those matters.

s. 12M(4)

A strategic planning authority must carry out a review of its spatial development strategy from time to time.

s. 12M(5)

The Secretary of State may direct a strategic planning authority to review all or specified parts of its spatial development strategy.

s. 12M(6)

A strategic planning authority must—

s. 12M(6)(a)

monitor the implementation of its spatial development strategy, and

s. 12M(6)(b)

monitor, and collect information about, matters relevant to the preparation, review, alteration, replacement or implementation of the strategy.

s. 12M(7)

The Secretary of State may make regulations imposing either or both of the following duties on each strategic planning authority that has an operative spatial development strategy—

s. 12M(7)(a)

a duty to make prescribed information relating to the implementation of the authority’s strategy available to the public in such form and manner as may be prescribed;

s. 12M(7)(b)

a duty to provide prescribed information relating to the implementation of the authority’s strategy to the Secretary of State in such form and manner as may be prescribed.

s. 12N — Alterations
s. 12N(1)

This section applies in relation to an operative spatial development strategy.

s. 12N(2)

A strategic planning authority may at any time prepare alterations of its strategy.

s. 12N(3)

The Secretary of State may direct a strategic planning authority to alter its spatial development strategy as specified in the direction.

s. 12N(4)

The Secretary of State may by regulations make provision as to when, or the circumstances in which, a strategic planning authority must alter its spatial development strategy.

s. 12N(5)

A spatial development strategy as altered must still conform to section 12D.

s. 12N(6)

Sections 12G to 12L apply in relation to the preparation and adoption of an alteration of a spatial development strategy as they apply in relation to the preparation and adoption of a spatial development strategy.

s. 12O — Replacement
s. 12O(1)

This section applies in relation to an operative spatial development strategy.

s. 12O(2)

A strategic planning authority may at any time prepare a new spatial development strategy as a replacement.

s. 12O(3)

The Secretary of State may direct a strategic planning authority to replace its spatial development strategy.

s. 12O(4)

The Secretary of State may by regulations make provision as to when, or the circumstances in which, a strategic planning authority must replace its spatial development strategy.

s. 12O(5)

A strategic planning authority’s operative spatial development strategy is revoked upon a new spatial development strategy being adopted by the authority in accordance with this Part.

Secretary of State’s intervention powers in relation to spatial development strategy

s. 12P — Powers where strategic planning authority is failing etc
s. 12P(1)

This section applies if the Secretary of State considers that—

s. 12P(1)(a)

a strategic planning authority is failing to do anything it is necessary or expedient for it to do in connection with the preparation, adoption, alteration, replacement or review of a spatial development strategy,

s. 12P(1)(b)

a spatial development strategy is, is going to be or may be—

s. 12P(1)(b)(i)

inconsistent with current national policies, or

s. 12P(1)(b)(ii)

detrimental to the interests of an area outside the strategy area, or

s. 12P(1)(c)

a proposed alteration of a spatial development strategy will, or may, result in the strategy becoming—

s. 12P(1)(c)(i)

inconsistent with current national policies, or

s. 12P(1)(c)(ii)

detrimental to the interests of an area outside the strategy area.

s. 12P(2)

The Secretary of State may—

s. 12P(2)(a)

if the strategy is not operative, take over preparation of the strategy from the strategic planning authority;

s. 12P(2)(b)

if the strategy is operative, alter the strategy;

s. 12P(2)(c)

give a direction to the strategic planning authority in relation to the preparation, adoption, withdrawal, alteration, replacement, review or revocation of the strategy.

s. 12P(3)

The power of direction under subsection (2)(c) includes power to direct a strategic planning authority—

s. 12P(3)(a)

to modify or withdraw its draft spatial development strategy;

s. 12P(3)(b)

to alter or revoke its (operative) spatial development strategy.

s. 12P(4)

Subsections (5) to (12) apply if preparation of a spatial development strategy is taken over under subsection (2)(a).

s. 12P(5)

The Secretary of State must publish a document setting out—

s. 12P(5)(a)

the timetable for preparing the strategy, and

s. 12P(5)(b)

details of any departures from any existing spatial development strategy timetable.

s. 12P(6)

The Secretary of State must (or, if an examination of the draft strategy has already been held, may)—

s. 12P(6)(a)

make arrangements for an examination of the draft strategy to be held in public, or

s. 12P(6)(b)

direct the strategic planning authority to make arrangements for an examination of the draft strategy under section 12I.

s. 12P(7)

Subsections (2) to (8) of section 12I apply in relation to an examination held under subsection (6)(a), reading references to the strategic planning authority as references to the Secretary of State.

s. 12P(8)

The Secretary of State must either—

s. 12P(8)(a)

publish the examiner’s report, or

s. 12P(8)(b)

direct the strategic planning authority to publish it.

s. 12P(9)

The Secretary of State may then—

s. 12P(9)(a)

approve the strategy,

s. 12P(9)(b)

modify the strategy and approve it with the modifications,

s. 12P(9)(c)

direct the strategic planning authority to consider adopting—

s. 12P(9)(c)(i)

the strategy, or

s. 12P(9)(c)(ii)

the strategy as modified by the Secretary of State, or

s. 12P(9)(d)

reject the strategy.

s. 12P(10)

If the Secretary of State gives a direction under subsection (9)(c), section 12L applies with the omission of subsections (1) and (2) of that section (and as if the reference in subsection (3) of that section to the conditions in subsection (2) being satisfied were a reference to the direction being received).

s. 12P(11)

If the Secretary of State approves a spatial development strategy under subsection (9)(a) or (b), the Secretary of State must either—

s. 12P(11)(a)

publish the strategy, or

s. 12P(11)(b)

direct the strategic planning authority to publish it.

s. 12P(12)

The spatial development strategy becomes operative when it is published.

s. 12P(13)

Subsections (5) to (12) (and the provisions applied by them) apply in relation to an alteration of a strategy under subsection (2)(b) as they apply to a strategy prepared under subsection (2)(a).

s. 12P(14)

The Secretary of State must give reasons for—

s. 12P(14)(a)

whatever the Secretary of State does under subsection (2);

s. 12P(14)(b)

the decision made under subsection (9).

s. 12P(15)

In the exercise of any function under this section the Secretary of State—

s. 12P(15)(a)

may take account of any matter that the Secretary of State considers to be relevant (regardless of whether the matter was taken account of by the strategic planning authority), and

s. 12P(15)(b)

must have regard to—

s. 12P(15)(b)(i)

the spatial development strategy timetable, and

s. 12P(15)(b)(ii)

the local plan timetable prepared by a local planning authority for an area that is wholly or partly within the strategy area.

s. 12P(16)

In subsection (15)(b)(ii) “local plan timetable” is to be construed in accordance with section 15B.

s. 12Q — Power to approve strategy where adoption resolution not passed
s. 12Q(1)

This section applies in the event of a vote by a strategic planning authority against passing a resolution to adopt a spatial development strategy.

s. 12Q(2)

The Secretary of State may, if the Secretary of State considers it appropriate—

s. 12Q(2)(a)

approve the strategy, or

s. 12Q(2)(b)

modify the strategy and approve it with the modifications.

s. 12Q(3)

The powers in subsection (2) are exercisable—

s. 12Q(3)(a)

on the Secretary of State’s own initiative, or

s. 12Q(3)(b)

in the case of a strategy prepared by a mayoral combined authority or a mayoral combined county authority, if the mayor of the authority requests the Secretary of State to exercise those powers.

s. 12Q(4)

The function of making a request as mentioned in subsection (3)(b) is exercisable only by the mayor (and may not be the subject of arrangements under section 107D(3) of the Local Democracy, Economic Development and Construction Act 2009 or section 30(3) of the Levelling-up and Regeneration Act 2023).

s. 12Q(5)

The Secretary of State must give reasons to the strategic planning authority or (as the case may be) the mayor of the strategic planning authority—

s. 12Q(5)(a)

for anything the Secretary of State does under subsection (2), or

s. 12Q(5)(b)

if the Secretary of State declines to approve the strategy, for that decision.

s. 12Q(6)

If the Secretary of State approves a spatial development strategy under subsection (2) the Secretary of State must either—

s. 12Q(6)(a)

publish the strategy, or

s. 12Q(6)(b)

direct the strategic planning authority to publish it.

s. 12Q(7)

The spatial development strategy becomes operative when it is published.

s. 12Q(8)

In making a decision under this section the Secretary of State may take account of any matter that the Secretary of State considers to be relevant (regardless of whether the matter was taken account of by the strategic planning authority).

s. 12R — Liability for Secretary of State’s costs of intervention
s. 12R(1)

The Secretary of State may require a strategic planning authority to reimburse the Secretary of State for any expenditure incurred by the Secretary of State in, or in connection with, exercising a function under section 12P or 12Q in relation to the authority’s spatial development strategy.

s. 12R(2)

Where the strategic planning authority is a strategic planning board, subsection (1) is to be read as giving power for the Secretary of State to require reimbursement of such expenditure from the constituent authorities of the board in such proportions as the Secretary of State considers just and reasonable.

s. 12S — Temporary direction pending possible use of intervention powers
s. 12S(1)

If the Secretary of State is considering whether to take action under section 12P in relation to a spatial development strategy, the Secretary of State may direct the strategic planning authority responsible for the strategy not to take any step, or not to take a step specified in the direction, in connection with the strategy—

s. 12S(1)(a)

until a time or event (if any) specified in the direction, or

s. 12S(1)(b)

until the direction is revoked.

s. 12S(2)

A spatial development strategy to which such a direction relates is not operative while the direction is in force.

s. 12S(3)

A direction given under this section in relation to a strategy ceases to have effect if the Secretary of State—

s. 12S(3)(a)

gives a direction under section 12P(2)(c) or (9)(c) in relation to the strategy, or

s. 12S(3)(b)

approves the strategy under section 12P(9)(a) or (b).

Supplementary

s. 12T — Supplementary etc provision in connection with regulations about strategic planning boards
s. 12T(1)

The Secretary of State may by regulations make supplementary, incidental, transitional, transitory or saving provision for the purposes of strategic planning board regulations.

s. 12T(2)

Where, immediately before strategic planning board regulations establishing a strategic planning board come into force, a spatial development strategy is operative in relation to the area of a principal authority that is to be a constituent authority of the board, regulations under subsection (1) may include provision for that strategy to be treated, for the purposes of this Part or another enactment, as the operative spatial development strategy of the strategic planning board.

s. 12T(3)

Where a strategic planning board has an operative spatial development strategy immediately before strategic planning board regulations that revoke the regulations that established that board come into force, regulations under subsection (1) may include provision for that strategy to be treated, for the purposes of this Part or another enactment, as the operative spatial development strategy of a prescribed principal authority or authorities.

s. 12T(4)

In this section “strategic planning board regulations” means regulations under section 12B(2).

s. 12U — Regulations
s. 12U(1)

The Secretary of State may by regulations make provision in connection with the exercise by any person of a function conferred by or under this Part.

s. 12U(2)

The regulations may (among other things) make provision as to—

s. 12U(2)(a)

the procedure to be followed in connection with the preparation, adoption, publication, review, withdrawal, alteration or replacement of a spatial development strategy or in connection with a review under section 12M(2);

s. 12U(2)(b)

the remuneration and allowances payable to a person appointed to conduct a public examination (under section 12I or as mentioned in section 12P(6)(a));

s. 12U(2)(c)

the supply of information or documents to the Secretary of State by a strategic planning authority for the purposes of any decision that the Secretary of State may make under this Part;

s. 12U(2)(d)

the determination of the time by or at which anything must be done for the purposes of this Part;

s. 12U(2)(e)

the manner of publication of any document required to be published under this Part;

s. 12U(2)(f)

the making of reasonable charges for the provision of copies of documents required by or under this Part.

s. 12U(3)

Regulations under this Part may make different provision for different areas.

s. 12V — Directions
s. 12V(1)

A direction given to a strategic planning authority under this Part may—

s. 12V(1)(a)

require the authority to do specified things by specified dates;

s. 12V(1)(b)

require the authority to keep the Secretary of State informed at specified intervals of the progress being made towards doing what the authority is directed to do.

s. 12V(2)

A direction under this Part must be given in writing.

s. 12V(3)

A direction under this Part may be varied or revoked by notice in writing to the strategic planning authority to which it was given.

s. 12V(4)

A direction under this Part must be published.

s. 12W — Meaning of “spatial development strategy” etc
s. 12W(1)

In this Part “spatial development strategy” means, as the context requires—

s. 12W(1)(a)

a strategy adopted by a strategic planning authority under section 12L,

s. 12W(1)(b)

a strategy approved by the Secretary of State under section 12P(9)(a) or (b) or 12Q(2)(a) or (b), or

s. 12W(1)(c)

a strategy in preparation by a strategic planning authority in accordance with this Part.

s. 12W(2)
s. 12W(2)(a)

“spatial development strategy” includes—

s. 12W(2)(a)(i)

the spatial development strategy for London,

s. 12W(2)(a)(ii)

a spatial development strategy adopted by a combined authority in accordance with regulations under section 105A of the Local Democracy, Economic Development and Construction Act 2009, and

s. 12W(2)(a)(iii)

a spatial development strategy adopted by a combined county authority in accordance with regulations under section 19 of the Levelling-up and Regeneration Act 2023; and

s. 12W(2)(b)

“person responsible for preparing a spatial development strategy” is to be read accordingly.

s. 12W(3)

For the purposes of sections 12M to 12O, a spatial development strategy approved by the Secretary of State under a power specified in subsection (1)(b) is to be regarded as the spatial development strategy of the strategic planning authority in relation to which the power is exercised.

s. 12X — Interpretation
s. 12X(1)

In this Part—“combined authority” means a combined authority established under section 103(1) of the Local Democracy, Economic Development and Construction Act 2009;“combined county authority” means a combined county authority established under section 9(1) of the Levelling-up and Regeneration Act 2023;“constituent authority”, in relation to a strategic planning board, is to be construed in accordance with section 12B;“examination” means an examination in public of a draft spatial development strategy as set out in section 12I, and “examiner” is to be construed accordingly;“mayoral combined authority” has the meaning given by section 107A(8) of the Local Democracy, Economic Development and Construction Act 2009;“mayoral combined county authority” has the meaning given by section 27(8) of the Levelling-up and Regeneration Act 2023;“national development management policy” must be construed in accordance with section 38ZA;“non-mayoral combined authority” means a combined authority that is not a mayoral combined authority;“non-mayoral combined county authority” means a combined county authority that is not a mayoral combined county authority;“principal authority” has the meaning given by section 12A(7);“spatial development strategy for London” means the strategy adopted by the Mayor of London under Part 8 of the Greater London Authority Act 1999;“spatial development strategy timetable” has the meaning given by section 12E;“strategic planning authority” has the meaning given by section 12A;“strategic planning board” has the meaning given by section 12B;“strategy area” has the meaning given by section 12A(4);“unitary authority” means—a county council for an area that does not include the areas of district councils, or a district council for an area that does not form part of the area of a county council;“upper-tier county council” means a county council for an area that includes the areas of district councils.

s. 12X(2)

In this Part—

s. 12X(2)(a)

“local planning authority” has the same meaning as in Part 2 (see section 15LF);

s. 12X(2)(b)

references to a local planning authority’s area are to the area for which they are the local planning authority in accordance with that Part.

Part 2

Local development

Survey

s. 13 — Survey of area
s. 13(1)

The local planning authority must keep under review the matters which may be expected to affect the development of their area or the planning of its development.

s. 13(2)

These matters include—

s. 13(2)(a)

the principal physical, economic, social and environmental characteristics of the area of the authority;

s. 13(2)(b)

the principal purposes for which land is used in the area;

s. 13(2)(c)

the size, composition and distribution of the population of the area;

s. 13(2)(d)

the communications, transport system and traffic of the area;

s. 13(2)(e)

any other considerations which may be expected to affect those matters;

s. 13(2)(f)

such other matters as may be prescribed or as the Secretary of State (in a particular case) may direct.

s. 13(3)

The matters also include—

s. 13(3)(a)

any changes which the authority think may occur in relation to any other matter;

s. 13(3)(b)

the effect such changes are likely to have on the development of the authority’s area or on the planning of such development.

s. 13(4)

The local planning authority may also keep under review and examine the matters mentioned in subsections (2) and (3) in relation to any neighbouring area to the extent that those matters may be expected to affect the area of the authority.

s. 13(5)

In exercising a function under subsection (4) a local planning authority must consult with the local planning authority for the neighbouring area in question.

s. 13(6)

If a neighbouring area is in Wales references to the local planning authority for that area must be construed in accordance with Part 6.

s. 14 — Survey of area: minerals and waste planning authorities and county councils
s. 14(1)

A minerals and waste planning authority must keep under review the matters which may be expected to affect minerals and waste development in the relevant area or the planning of such development.

s. 14(2)

Subsections (2) to (5) of section 13 apply for the purposes of subsection (1) as they apply for the purposes of that section and—

s. 14(2)(a)

references to the local planning authority must be construed as references to the minerals and waste planning authority,

s. 14(2)(b)

references to the area of the local planning authority must be construed as references to the relevant area, and

s. 14(2)(c)

references to the local planning authority for a neighbouring area must be construed as references to—

s. 14(2)(c)(i)

in the case of a neighbouring area in England, the minerals and waste planning authority for that area, or

s. 14(2)(c)(ii)

in the case of a neighbouring area in Wales, the local planning authority for that area for the purposes of Part 6.

s. 14(3)

The Secretary of State may by regulations require or (in a particular case) may direct a county council to keep under review in relation to their area such of the matters mentioned in section 13(1) to (4) as the Secretary of State prescribes or directs (as the case may be).

s. 14(4)

For the purposes of subsection (3)—

s. 14(4)(a)

it is immaterial whether the matter relates to minerals and waste development;

s. 14(4)(b)

if a matter which is prescribed or in respect of which the Secretary of State gives a direction falls within section 13(4) the county council must consult the local planning authority for the area in question.

s. 14(5)

The county council must make available the results of their review under subsection (3) to such persons as the Secretary of State prescribes or directs (as the case may be).

Register

s. 14A — Register of land
s. 14A(1)

The Secretary of State may make regulations requiring a local planning authority in England to prepare, maintain and publish a register of land within (or partly within) the authority's area which—

s. 14A(1)(a)

is of a prescribed description, or

s. 14A(1)(b)

satisfies prescribed criteria.

s. 14A(2)

The regulations may require the register to be kept in two or more parts. A reference to the register in the following subsections includes a reference to a prescribed part of the register.

s. 14A(3)

The regulations may make provision permitting the local planning authority to enter in the register land within (or partly within) the authority's area which—

s. 14A(3)(a)

is of a prescribed description or satisfies prescribed criteria, and

s. 14A(3)(b)

is not required by the regulations to be entered in the register.

s. 14A(4)

The regulations may—

s. 14A(4)(a)

require or authorise a local planning authority to carry out consultation and other procedures in relation to entries in the register;

s. 14A(4)(b)

specify descriptions of land that are not to be entered in the register;

s. 14A(4)(c)

confer a discretion on a local planning authority, in prescribed circumstances, not to enter in the register land of a prescribed description that the authority would otherwise be required to enter in it;

s. 14A(4)(d)

require a local planning authority exercising the discretion referred to in paragraph (c) to explain why they have done so;

s. 14A(4)(e)

specify information to be included in the register;

s. 14A(4)(f)

make provision about revising the register.

s. 14A(5)

The regulations may specify a description of land by reference to a description in national policies and advice.

s. 14A(6)

The regulations may confer power on the Secretary of State to require a local planning authority—In this subsection “specified” means specified by the Secretary of State.

s. 14A(6)(a)

to prepare or publish the register, or to bring the register up to date, by a specified date;

s. 14A(6)(b)

to provide the Secretary of State with specified information, in a specified form and by a specified date, in relation to the register.

s. 14A(7)

In exercising their functions under the regulations, a local planning authority must have regard to—

s. 14A(7)(a)

the development plan;

s. 14A(7)(b)

national policies and advice;

s. 14A(7)(c)

any guidance issued by the Secretary of State for the purposes of the regulations.

s. 14A(8)

In this section “national policies and advice” means national policies and advice contained in guidance issued by the Secretary of State (as it has effect from time to time).

Development schemes

s. 15 — Local development scheme

, or

s. 15(1)

The local planning authority must prepare and maintain a scheme to be known as their local development scheme.

s. 15(2)

The scheme must specify—

s. 15(2)(a)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 15(2)(aa)

the local development documents which are to be development plan documents;

s. 15(2)(b)

the subject matter and geographical area to which each development plan document is to relate;

s. 15(2)(c)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 15(2)(d)

which development plan documents(if any) are to be prepared jointly with one or more other local planning authorities;

s. 15(2)(e)

any matter or area in respect of which the authority have agreed (or propose to agree) to the constitution of a joint committee under section 29;

s. 15(2)(f)

the timetable for the preparation and revision of the development plan documents;

s. 15(2)(g)

such other matters as are prescribed.

s. 15(3)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 15(3A)

If a local planning authority have not prepared a local development scheme, the Secretary of State or the Mayor of London may—

s. 15(3A)(a)

prepare a local development scheme for the authority, and

s. 15(3A)(b)

direct the authority to bring that scheme into effect.

s. 15(4)

The Secretary of State or the Mayor of London may direct the local planning authority to make such amendments to the scheme as he thinks appropriate for the purpose of ensuring full and effective coverage (both geographically and with regard to subject matter) of the authority's area by the development plan documents (taken as a whole) for that area.

s. 15(4A)

The Mayor of London—

s. 15(4A)(a)

may give a direction under subsection(3A) or(4) only if the local planning authority are a London borough, and

s. 15(4A)(b)

in considering whether to give such a direction, and which amendments to include in the direction, must have regard to any guidance issued by the Secretary of State.

s. 15(5)

A direction under subsection(3A) or(4) must contain the Secretary of State’s, or (as the case may be) the Mayor of London's, reasons for giving it.

s. 15(6)

The local planning authority must comply with a direction given under subsection(3A) or(4). In the case of a direction given by the Mayor of London, this subsection is subject to subsections (6A) to (6E).

s. 15(6A)

If at any time the Mayor of London gives a direction under subsection(3A) or(4)—

s. 15(6A)(a)

he must at that time send a copy of the direction to the Secretary of State, and

s. 15(6A)(b)

effect is not to be given to the direction until such time as may be prescribed.

s. 15(6B)

The Secretary of State may, within such time as may be prescribed, direct the local planning authority—

s. 15(6B)(a)

to disregard a direction given under subsection(3A) or(4) by the Mayor of London, or

s. 15(6B)(b)

to give effect to the direction with such modifications as may be specified in the Secretary of State's direction.

s. 15(6C)

Such a direction must contain the Secretary of State's reasons for giving it.

s. 15(6D)

If at any time the Secretary of State gives a direction under subsection (6B), the Secretary of State must at that time send a copy of the direction to the Mayor of London.

s. 15(6E)

The local planning authority must comply with any direction given by the Secretary of State under subsection (6B).

s. 15(7)

To bring the scheme into effect, the local planning authority must resolve that the scheme is to have effect and in the resolution specify the date from which the scheme is to have effect.

s. 15(8)

The local planning authority must revise their local development scheme—

s. 15(8)(a)

at such time as they consider appropriate;

s. 15(8)(b)

when directed to do so by the Secretary of State or the Mayor of London. In the case of a direction given by the Mayor of London, paragraph (b) is subject to subsections (8B) to (8F).

s. 15(8A)

The Mayor of London—

s. 15(8A)(a)

may give a direction under subsection (8) only if the local planning authority are a London borough, and

s. 15(8A)(b)

in considering whether to give such a direction, must have regard to any guidance issued by the Secretary of State.

s. 15(8AA)

A direction may be given under subsection (8)(b) only if—

s. 15(a)

the person giving the direction thinks that revision of the scheme is necessary for the purpose of ensuring full and effective coverage (both geographically and with regard to subject matter) of the authority's area by the development plan documents (taken as a whole) for that area.

s. 15(b)

the Secretary of State has published data standards under section 36(3) which apply to the local development scheme and the person giving the direction thinks that the scheme should be revised so that it complies with the standards.

s. 15(8B)

If at any time the Mayor of London gives a direction under subsection (8)(b)—

s. 15(8B)(a)

he must at that time send a copy of the direction to the Secretary of State, and

s. 15(8B)(b)

the scheme is not to be revised until such time as may be prescribed.

s. 15(8C)

The Secretary of State may, within such time as may be prescribed, direct the local planning authority to disregard a direction given under subsection (8)(b) by the Mayor of London.

s. 15(8D)

Such a direction must contain the Secretary of State's reasons for giving it.

s. 15(8E)

If at any time the Secretary of State gives a direction under subsection (8C), the Secretary of State must at that time send a copy of the direction to the Mayor of London.

s. 15(8F)

The local planning authority must comply with any direction given by the Secretary of State under subsection (8C).

s. 15(9)

Subsections (2) to (7) apply to the revision of a scheme as they apply to the preparation of the scheme.

s. 15(9A)

The local planning authority must make the following available to the public—

s. 15(9A)(a)

the up-to-date text of the scheme,

s. 15(9A)(b)

a copy of any amendments made to the scheme, and

s. 15(9A)(c)

up-to-date information showing the state of the authority's compliance (or non-compliance) with the timetable mentioned in subsection (2)(f).

s. 15(10)

Section 38(1) of the Greater London Authority Act 1999 (delegation of functions by the Mayor) does not apply to the Mayor of London's functions under this section of giving a direction.

s. 16 — Minerals and waste development scheme
s. 16(1)

A county council in respect of any part of their area for which there is a district council must prepare and maintain a scheme to be known as their minerals and waste development scheme.

s. 16(2)

Section 15 (ignoring subsections (1) and (2)(e)) applies in relation to a minerals and waste development scheme as it applies in relation to a local development scheme.

s. 16(3)

This Part applies to a minerals and waste development scheme as it applies to a local development scheme and for that purpose—

s. 16(3)(a)

references to a local development scheme include references to a minerals and waste development scheme;

s. 16(3)(b)

references to a local planning authority include references to a county council.

s. 16(4)

But subsection (3) does not apply to—

s. 16(4)(a)

section 17(3);

s. 16(4)(b)

section 24(1)(b), (4) and (7);

s. 16(4)(c)

the references in section 24(5) to subsection (4) and the Mayor;

s. 16(4)(d)

sections 29 to 31.

s. 16(5)

Also, subsection (3)(b) does not apply to section 33A(1)(a) and (b).

Plan timetables

s. 15B — Local plan timetable
s. 15B(1)

Each local planning authority must prepare and maintain a document to be known as their “local plan timetable”.

s. 15B(2)

The local plan timetable must specify—

s. 15B(2)(a)

the matters which the authority’s local plan for their area is to deal with,

s. 15B(2)(b)

the geographical area to which the authority’s local plan is to relate,

s. 15B(2)(c)

any supplementary plans which the authority are to prepare,

s. 15B(2)(d)

the subject matter and geographical area, site or sites to which each of those supplementary plans is to relate,

s. 15B(2)(e)

how the authority propose to comply with the requirement in section 15F(1) (requirement in relation to design code),

s. 15B(2)(f)

whether the authority’s local plan for their area is to be a joint local plan and, if so, each other local planning authority for whose area the joint local plan is to be their local plan,

s. 15B(2)(g)

whether the authority are to prepare a joint supplementary plan and, if so, each other local planning authority who are to prepare that joint supplementary plan with them,

s. 15B(2)(h)

any matter or area in respect of which the authority have agreed (or propose to agree) to the constitution of a joint committee under section 15J, and

s. 15B(2)(i)

a timetable for the preparation of the authority’s local plan for their area, and any supplementary plans the authority are to make, which is consistent with this Part and any regulations made under it.

s. 15B(3)

If the local planning authority’s local plan for their area is to be a joint local plan, or the authority is to prepare one or more joint supplementary plans, the timetable for each joint plan, specified in the local plan timetable in accordance with subsection (2)(i), must be consistent with the timetable for that plan in the local plan timetable prepared by each other local planning authority who are to prepare that plan.

s. 15B(4)

If the local planning authority are a minerals and waste planning authority, the local plan timetable may incorporate the authority’s minerals and waste plan timetable.

s. 15B(5)

The Secretary of State may prescribe—

s. 15B(5)(a)

the form and content of the local plan timetable;

s. 15B(5)(b)

further matters which the local plan timetable must deal with.

s. 15B(6)

If a local planning authority have not prepared a local plan timetable, the Secretary of State or the Mayor of London may—

s. 15B(6)(a)

prepare a local plan timetable for the authority, and

s. 15B(6)(b)

direct the authority to bring that timetable into effect.

s. 15B(7)

The Secretary of State or the Mayor of London may direct the local planning authority to make such amendments to the local plan timetable as the Secretary of State or (as the case may be) Mayor thinks appropriate for the purpose of ensuring full and effective coverage (both geographically and with regard to subject matter) of the authority’s area by the development plan for that area.

s. 15B(8)

To bring the local plan timetable into effect, the local planning authority must publish it, together with a statement that the timetable is to have effect.

s. 15B(9)

Once the local plan timetable has effect, the local planning authority must comply with it.

s. 15B(10)

The Secretary of State may by regulations make provision as to when, or the circumstances in which, a local planning authority must revise their local plan timetable (and that provision may confer a power to direct that a local plan timetable is to be revised).

s. 15B(11)

Subsections (1) to (9) and section 15BA apply to the revision of a local plan timetable as they apply to the preparation of a local plan timetable.

s. 15B(12)

For further provision about directions under subsection (6) or (7), see section 15BA.

s. 15BA — Local plan timetable: further provision about directions under section 15B
s. 15BA(1)

The Mayor of London—

s. 15BA(1)(a)

may give a direction under section 15B(6) or (7) only if the local planning authority are a London borough council, and

s. 15BA(1)(b)

in considering whether to give such a direction, and which amendments to include in the direction, must have regard to any guidance issued by the Secretary of State.

s. 15BA(2)

A direction under section 15B(6) or (7) must contain the Secretary of State’s, or (as the case may be) the Mayor of London’s, reasons for giving it.

s. 15BA(3)

If at any time the Mayor of London gives a direction under section 15B(6) or (7)—

s. 15BA(3)(a)

the Mayor must at that time send a copy of the direction to the Secretary of State, and

s. 15BA(3)(b)

the direction is not to be given effect until such time as may be prescribed.

s. 15BA(4)

The Secretary of State may, within such time as may be prescribed, direct the local planning authority—

s. 15BA(4)(a)

to disregard a direction given under section 15B(6) or (7) by the Mayor of London, or

s. 15BA(4)(b)

to give effect to the direction with such modifications as may be specified in the Secretary of State’s direction.

s. 15BA(5)

Such a direction must contain the Secretary of State’s reasons for giving it.

s. 15BA(6)

If at any time the Secretary of State gives a direction under subsection (4), the Secretary of State must at that time send a copy of the direction to the Mayor of London.

s. 15BA(7)

Section 38(1) of the Greater London Authority Act 1999 (delegation of functions by the Mayor) does not apply to the Mayor of London’s functions under section 15B(6) or (7) of giving a direction.

s. 15BB — Minerals and waste plan timetable
s. 15BB(1)

Each minerals and waste planning authority must prepare and maintain a document to be known as their “minerals and waste plan timetable”.

s. 15BB(2)

The minerals and waste plan timetable must specify—

s. 15BB(2)(a)

the matters which will be dealt with by the minerals and waste plan for the relevant area,

s. 15BB(2)(b)

the geographical area to which the authority’s minerals and waste plan is to relate,

s. 15BB(2)(c)

any supplementary plans which the minerals and waste planning authority are to make,

s. 15BB(2)(d)

the subject matter and geographical area, site or sites to which each supplementary plan is to relate,

s. 15BB(2)(e)

whether the minerals and waste plan for the authority’s area is to be a joint minerals and waste plan and, if so, each other minerals and waste planning authority for whose relevant area the joint minerals and waste plan is to be the minerals and waste plan,

s. 15BB(2)(f)

whether the authority are to prepare a joint supplementary plan and, if so, each other minerals and waste planning authority who are to prepare that joint supplementary plan with them, and

s. 15BB(2)(g)

a timetable for the preparation of the minerals and waste plan for the relevant area, and any supplementary plans the authority are to make, which is consistent with this Part and any regulations made under it.

s. 15BB(3)

If the minerals and waste plan for the relevant area is to be a joint minerals and waste plan, or the authority is to prepare one or more joint supplementary plans, the timetable for each joint plan, specified in the minerals and waste plan timetable in accordance with subsection (2)(g), must be consistent with the timetable for that plan in the minerals and waste plan timetable prepared by each other minerals and waste planning authority who are to prepare that plan.

s. 15BB(4)

Sections 15B(5) to (12), 15BA and 15LE apply in relation to a minerals and waste plan timetable as they apply in relation to a local plan timetable and for that purpose—

s. 15BB(4)(a)

references to a local plan timetable are to be read as references to a minerals and waste plan timetable,

s. 15BB(4)(b)

references to a local plan are to be read as references to a minerals and waste plan,

s. 15BB(4)(c)

references to a local planning authority are to be read as references to a minerals and waste planning authority, and

s. 15BB(4)(d)

references to a local planning authority’s area are to be read as references to a minerals and waste planning authority’s relevant area.

s. 15BB(5)

In this section “joint minerals and waste plan” means a minerals and waste plan prepared jointly by two or more minerals and waste planning authorities for their combined relevant areas under sections 15I and 15IA (as applied by section 15CB(8)).

Local, minerals and waste and supplementary plans

s. 15C — Local plans
s. 15C(1)

Each local planning authority must prepare a document to be known as their “local plan”.

s. 15C(2)

Only one local plan may have effect in relation to a local planning authority’s area at any one time.

s. 15C(3)

The local plan must set out policies of the local planning authority (however expressed) in relation to the amount, type and location of, and timetable for, development in the local planning authority’s area.

s. 15C(4)

The local plan may include—

s. 15C(4)(a)

other policies (however expressed) in relation to the use or development of land in the local planning authority’s area which are designed to achieve objectives that relate to the particular characteristics or circumstances of their area, any part of their area or one or more specific sites in their area;

s. 15C(4)(b)

details of any infrastructure requirements, or requirements for affordable housing, to which development in accordance with the policies, included in the plan under subsection (3) or paragraph (a) of this subsection, would give rise;

s. 15C(4)(c)

requirements with respect to design that relate to development, or development of a particular description, throughout the local planning authority’s area, in any part of their area or at one or more specific sites in their area, which the local planning authority consider should be met for planning permission for the development to be granted.

s. 15C(5)

The Secretary of State may prescribe further matters which the local plan may, or must, deal with.

s. 15C(6)

The local plan must be designed to secure that the use and development of land in the local planning authority’s area contribute to the mitigation of, and adaptation to, climate change.

s. 15C(7)

The local plan must take account of any local nature recovery strategy that relates to all or part of the local planning authority’s area, including in particular—

s. 15C(7)(a)

the areas identified in the strategy as areas which—

s. 15C(7)(a)(i)

are, or could become, of particular importance for biodiversity, or

s. 15C(7)(a)(ii)

are areas where the recovery or enhancement of biodiversity could make a particular contribution to other environmental benefits,

s. 15C(7)(b)

the priorities set out in the strategy for recovering or enhancing biodiversity, and

s. 15C(7)(c)

the proposals set out in the strategy as to potential measures relating to those priorities.

s. 15C(8)

The local plan must take account of an assessment of the amount, and type, of housing that is needed in the local planning authority’s area, including the amount of affordable housing that is needed.

s. 15C(9)

The local plan must not—

s. 15C(9)(a)

include anything that is not permitted or required by or under subsections (3) to (5) or (10) or regulations under section 15CA(8)(a), or

s. 15C(9)(b)

be inconsistent with or (in substance) repeat any national development management policy.

s. 15C(10)

References in this section to development do not include minerals and waste development, but where the local planning authority is the minerals and waste planning authority for any part of their area, their local plan may incorporate all or part of their minerals and waste plan.

s. 15CA — Local plans: preparation and further provision
s. 15CA(1)

A local plan must be prepared in accordance with the local planning authority’s local plan timetable.

s. 15CA(2)

A local plan must be in general conformity with the spatial development strategy, if one is operative in relation to the area of the local planning authority.

s. 15CA(3)

The local planning authority must, at such times as may be prescribed, seek observations or advice in relation to a proposed local plan, from a person appointed by the Secretary of State.

s. 15CA(4)

The Secretary of State may require the local planning authority to—

s. 15CA(4)(a)

reimburse the Secretary of State for any expenditure incurred by the Secretary of State in, or in connection with, appointing a person under subsection (3), or

s. 15CA(4)(b)

pay any fees and expenses of a person appointed by the Secretary of State under subsection (3).

s. 15CA(5)

The local planning authority must, as soon as is reasonably practicable, publish any observations or advice they receive from a person appointed by the Secretary of State under subsection (3).

s. 15CA(6)

In preparing their local plan, a local planning authority must have regard to—

s. 15CA(6)(a)

any observations or advice received from a person appointed by the Secretary of State under subsection (3),

s. 15CA(6)(b)

any responses to a consultation, provided for in regulations under section 15LE, in connection with the preparation of the local plan,

s. 15CA(6)(c)

national development management policies,

s. 15CA(6)(d)

other national policies and advice contained in guidance issued by the Secretary of State,

s. 15CA(6)(e)

the National Planning Framework for Scotland, if any part of the authority’s area adjoins Scotland,

s. 15CA(6)(f)

the National Development Framework for Wales, if any part of the authority’s area adjoins Wales,

s. 15CA(6)(g)

any other part of the development plan for the authority’s area which has effect,

s. 15CA(6)(h)

any neighbourhood priorities statement—

s. 15CA(6)(h)(i)

which has effect for part of the authority’s area, and

s. 15CA(6)(h)(ii)

to which the authority has not already had regard in preparing another local plan previously adopted or approved under this Part, and

s. 15CA(6)(i)

such other matters as the Secretary of State prescribes.

s. 15CA(7)

A local plan has effect only in so far as it or any part of it is adopted or approved under this Part.

s. 15CA(8)

Regulations made by the Secretary of State may—

s. 15CA(8)(a)

prescribe the form and content of a local plan;

s. 15CA(8)(b)

make provision as to any further documents which must be prepared by the authority in connection with the preparation of a local plan (including the form and content of such documents);

s. 15CA(8)(c)

prescribe the nature of the observations or advice which must be sought under subsection (3);

s. 15CA(8)(d)

prescribe documents or information which must be provided by the local planning authority to a person appointed by the Secretary of State under subsection (3) (including the form and content of such documents);

s. 15CA(8)(e)

prescribe the form and content of observations or advice provided under subsection (3);

s. 15CA(8)(f)

prescribe when the local planning authority is to have regard to something mentioned in subsection (6);

s. 15CA(8)(g)

prescribe when any step in, or in connection with, the preparation of the local plan must be taken;

s. 15CA(8)(h)

make provision as to when, or in what circumstances, a new local plan is to be prepared to replace the existing one.

s. 15CB — Minerals and waste plan
s. 15CB(1)

Each minerals and waste planning authority must, in respect of their relevant area, prepare one or more documents which are to be known collectively as their “minerals and waste plan”.

s. 15CB(2)

The minerals and waste plan must set out policies of the minerals and waste planning authority (however expressed) in relation to the amount, type and location of, and timetable for, minerals and waste development, in the relevant area.

s. 15CB(3)

The minerals and waste plan may include—

s. 15CB(3)(a)

other policies (however expressed) in relation to—

s. 15CB(3)(a)(i)

minerals and waste development in the relevant area, which are designed to achieve objectives that relate to the particular characteristics or circumstances of that area, any part of that area or one or more specific sites in that area;

s. 15CB(3)(a)(ii)

development other than minerals and waste development, which are designed to secure that minerals and waste development in the relevant area can take place;

s. 15CB(3)(b)

details of any infrastructure requirements to which minerals and waste development in accordance with the policies, included in the plan under subsection (2) or paragraph (a) of this subsection, would give rise.

s. 15CB(4)

The Secretary of State may prescribe further matters relating to minerals and waste development which the minerals and waste plan may, or must, deal with.

s. 15CB(5)

The minerals and waste plan must be designed to secure that minerals and waste development in the relevant area contributes to the mitigation of, and adaptation to, climate change.

s. 15CB(6)

The minerals and waste plan must take account of any local nature recovery strategy that relates to all or part of the relevant area, including in particular—

s. 15CB(6)(a)

the areas identified in the strategy as areas which—

s. 15CB(6)(a)(i)

are, or could become, of particular importance for biodiversity, or

s. 15CB(6)(a)(ii)

are areas where the recovery or enhancement of biodiversity could make a particular contribution to other environmental benefits,

s. 15CB(6)(b)

the priorities set out in the strategy for recovering or enhancing biodiversity, and

s. 15CB(6)(c)

the proposals set out in the strategy as to potential measures relating to those priorities.

s. 15CB(7)

The minerals and waste plan must not—

s. 15CB(7)(a)

include anything that is not permitted or required by or under subsections (2) to (4) or regulations under section 15CA(8)(a) (as applied by subsection (8)), or

s. 15CB(7)(b)

be inconsistent with or (in substance) repeat any national development management policy.

s. 15CB(8)

This Part applies in relation to a minerals and waste plan as it applies in relation to a local plan and for that purpose—

s. 15CB(8)(a)

references to a local plan timetable are to be read as references to a minerals and waste plan timetable,

s. 15CB(8)(b)

references to a local plan are to be read as references to a minerals and waste plan,

s. 15CB(8)(c)

references to a local planning authority are to be read as references to a minerals and waste planning authority, and

s. 15CB(8)(d)

references to a local planning authority’s area are to be read as references to a minerals and waste planning authority’s relevant area.

s. 15CB(9)

Subsection (8) is subject to such modifications of this Part, as it applies in relation to a minerals and waste plan, as may be prescribed.

s. 15CB(10)

Subsection (8) does not apply to—

s. 15CB(10)(a)

sections 15B and 15BA;

s. 15CB(10)(b)

section 15C;

s. 15CB(10)(c)

section 15CC;

s. 15CB(10)(d)

sections 15J to 15JB;

s. 15CB(10)(e)

section 15LB(2);

s. 15CB(10)(f)

sections 15LC(3)(c) and 15LD.

s. 15CC — Supplementary plans
s. 15CC(1)

Each relevant plan-making authority may prepare one or more documents, each of which is to be known as a “supplementary plan”.

s. 15CC(2)

A supplementary plan prepared by the Mayor of London may include requirements with respect to design that relate to development, or development of a particular description, throughout Greater London, which the Mayor considers should be met for planning permission for the development to be granted.

s. 15CC(3)

A supplementary plan prepared by a local planning authority may include—

s. 15CC(3)(a)

policies (however expressed) in relation to the amount, type and location of, or timetable for, development at a specific site in their area or at two or more specific sites in their area which the authority consider to be nearby to each other;

s. 15CC(3)(b)

other policies (however expressed) in relation to the use or development of land in the local planning authority’s area which are designed to achieve objectives that relate to the particular characteristics or circumstances of a specific site in their area or two or more specific sites in their area which the authority consider to be nearby to each other;

s. 15CC(3)(c)

details of any infrastructure requirements, or requirements for affordable housing, to which development in accordance with any policies, included in the plan under paragraph (a) or (b), would give rise;

s. 15CC(3)(d)

requirements with respect to design that relate to development, or development of a particular description, throughout the local planning authority’s area, in any part of their area or at one or more specific sites in their area, which the local planning authority consider should be met for planning permission for the development to be granted.

s. 15CC(4)

References in subsection (3) to development do not include minerals and waste development.

s. 15CC(5)

A supplementary plan prepared by a minerals and waste planning authority may include—

s. 15CC(5)(a)

policies (however expressed) in relation to the amount, type and location of, or timetable for, minerals and waste development at one or more specific sites in the relevant area or at two or more specific sites in that area which the authority consider to be nearby to each other;

s. 15CC(5)(b)

other policies (however expressed) in relation to—

s. 15CC(5)(b)(i)

minerals and waste development in the relevant area which are designed to achieve objectives that relate to the particular characteristics or circumstances of a specific site in that area or two or more specific sites in that area which the authority consider to be nearby to each other;

s. 15CC(5)(b)(ii)

development other than minerals and waste development, which are designed to secure that minerals and waste development can take place at a specific site in the relevant area or two or more specific sites in that area which the authority consider to be nearby to each other;

s. 15CC(5)(c)

details of any infrastructure requirements to which minerals and waste development in accordance with any policies, included in the plan under paragraph (a) or (b), would give rise.

s. 15CC(6)

The Secretary of State may prescribe further matters which a supplementary plan may include.

s. 15CC(7)

A supplementary plan must be in general conformity with the spatial development strategy, if one is operative in relation to the area or a site to which the plan relates.

s. 15CC(8)

In preparing a supplementary plan, the relevant plan-making authority must have regard to any other part of the development plan which has effect for the area or a site to which the plan relates.

s. 15CC(9)

So far as the relevant plan-making authority consider appropriate, having regard to the subject matter of the supplementary plan, the plan must—

s. 15CC(9)(a)

be designed to secure that the development and use of land in the authority’s area contribute to the mitigation of, and adaptation to, climate change, and

s. 15CC(9)(b)

take account of any local nature recovery strategy which relates to all or part of the area to which the plan relates or to an area in which a site to which the plan relates is located, including in particular—

s. 15CC(9)(b)(i)

the areas identified in the strategy as areas which—

s. 15CC(9)(b)(i)(A)

are, or could become, of particular importance for biodiversity, or

s. 15CC(9)(b)(i)(B)

are areas where the recovery or enhancement of biodiversity could make a particular contribution to other environmental benefits,

s. 15CC(9)(b)(ii)

the priorities set out in the strategy for recovering or enhancing biodiversity, and

s. 15CC(9)(b)(iii)

the proposals set out in the strategy as to potential measures relating to those priorities.

s. 15CC(10)

A supplementary plan must not—

s. 15CC(10)(a)

include anything which is not permitted or required by or under subsections (2) to (6), or

s. 15CC(10)(b)

be inconsistent with or (in substance) repeat any national development management policy.

s. 15CC(11)

The Secretary of State may by regulations make provision about the preparation, withdrawal or revision of supplementary plans.

s. 15CC(12)

Regulations under subsection (11)—

s. 15CC(12)(a)

may apply, or make provision corresponding to, any provision made by or under this Part in relation to the preparation, withdrawal or revision of a local plan, with or without modifications;

s. 15CC(12)(b)

must require a proposed supplementary plan to be the subject of consultation with the public.

s. 15CC(13)

A supplementary plan has effect only in so far as it or any part of it is adopted or approved under this Part.

Examination of plans

s. 15D — Independent examination: local plans
s. 15D(1)

A local planning authority must submit their proposed local plan to the Secretary of State for independent examination if a person appointed by the Secretary of State under section 15CA(3) advises that the prescribed requirements are met in relation to the plan.

s. 15D(2)

The authority must also send or make available to the Secretary of State (in addition to the local plan) such other documents (or copies of documents) and such information as is prescribed.

s. 15D(3)

The Secretary of State may prescribe the manner in which the local plan, or any document or information to be sent under subsection (2), is to be sent.

s. 15D(4)

The examination must be carried out by a person appointed by the Secretary of State (“the examiner”).

s. 15D(5)

The purpose of the independent examination is to determine whether it is reasonable to conclude that the local plan is sound.

s. 15D(6)

Any person who makes representations in relation to the local plan must (if that person so requests) be given the opportunity to appear before and be heard by the examiner.

s. 15D(7)

At any time before the examiner makes a recommendation under any of the following subsections, if the examiner considers that—the examiner may decide that the examination is to be so paused.

s. 15D(7)(a)

certain matters need to be dealt with in order for it to become reasonable to conclude that the local plan is sound, and

s. 15D(7)(b)

those matters could be dealt with by pausing the examination under section 15DA for further work to be carried out,

s. 15D(8)

The Secretary of State may by notice to the examiner—In this subsection “specified” means specified in the notice.

s. 15D(8)(a)

direct the examiner not to take any step, or any further step, in connection with the examination of the local plan, or of a specified part of it, until a specified time or until the direction is withdrawn;

s. 15D(8)(b)

require the examiner—

s. 15D(8)(b)(i)

to consider any specified matters;

s. 15D(8)(b)(ii)

to give an opportunity, or further opportunity, to specified persons to appear before and be heard by the examiner;

s. 15D(8)(b)(iii)

to take any specified procedural step in connection with the examination.

s. 15D(9)

Where the examiner—the examiner must recommend that the local plan is adopted and give reasons for the recommendation.

s. 15D(9)(a)

has carried out the examination, and

s. 15D(9)(b)

considers that, in all the circumstances, it would be reasonable to conclude that the local plan is sound,

s. 15D(10)

Subsections (11) and (12) apply where the examiner—

s. 15D(10)(a)

has carried out the examination, and

s. 15D(10)(b)

is not required by subsection (9) to recommend that the local plan is adopted.

s. 15D(11)

If the examiner considers that, if certain modifications were made to the local plan, it would become reasonable to conclude that the plan is sound, the examiner must—

s. 15D(11)(a)

recommend that those modifications are made and that the plan is then adopted, and

s. 15D(11)(b)

give reasons for the recommendation.

s. 15D(12)

If the examiner is not required by subsection (11) to recommend that the local plan is adopted with modifications and the examination is not paused or to be paused under section 15DA, the examiner must—

s. 15D(12)(a)

recommend that the local plan is withdrawn, and

s. 15D(12)(b)

give reasons for the recommendation.

s. 15D(13)

The local planning authority must publish the recommendations and reasons they receive under this section.

s. 15DA — Pause of independent examination for further work
s. 15DA(1)

This section applies if the examiner decides under section 15D(7) that the examination under that section is to be paused under this section for further work to be carried out.

s. 15DA(2)

The examiner must notify the local planning authority and the Secretary of State—

s. 15DA(2)(a)

that the examiner has taken that decision,

s. 15DA(2)(b)

of the matters which the examiner considers need to be dealt with in order for it to become reasonable to conclude that the local plan is sound, and

s. 15DA(2)(c)

of the period for which the examination under section 15D is to be paused under this section (“the pause period”).

s. 15DA(3)

The pause period may not—

s. 15DA(3)(a)

begin earlier than the day on which notice is given to the local planning authority under subsection (2), nor

s. 15DA(3)(b)

be longer than such period as may be prescribed

s. 15DA(4)

The examination under section 15D is suspended at the beginning of the pause period.

s. 15DA(5)

During the pause period, the local planning authority must take steps to deal with the matters notified to them under subsection (2)(b).

s. 15DA(6)

Before the end of the pause period, the local planning authority must send to the examiner—

s. 15DA(6)(a)

a document—

s. 15DA(6)(a)(i)

setting out what the authority have done during the pause period to deal with the matters notified to them under subsection (2)(b), and

s. 15DA(6)(a)(ii)

setting out any modifications to the local plan that the authority propose to make in order to make it sound or stating that the authority do not propose to make any such modifications, and

s. 15DA(6)(b)

any further evidence as to the soundness of the plan which the local planning authority may have.

s. 15DA(7)

The local planning authority must publish the document and any evidence sent under subsection (6).

s. 15DA(8)

If the examiner considers, at the end of the pause period, that the matters notified to the local planning authority under subsection (2)(b) have not been dealt with, with the result that there is no prospect of it becoming reasonable to conclude that the local plan is sound, the examiner must—

s. 15DA(8)(a)

recommend that the local plan is withdrawn, and

s. 15DA(8)(b)

give reasons for the recommendation.

s. 15DA(9)

If the examiner does not make a recommendation under subsection (8), the examination under section 15D is resumed.

s. 15DA(10)

The local planning authority must publish any recommendation and reasons they receive under this section.

s. 15DB — Independent examination: supplementary plans
s. 15DB(1)

A relevant plan-making authority must submit each supplementary plan that they propose to adopt for independent examination.

s. 15DB(2)

The supplementary plan must be submitted to—

s. 15DB(2)(a)

the Secretary of State, in order for the examination to be carried out by a person appointed by the Secretary of State, or

s. 15DB(2)(b)

a person who, in the opinion of the relevant plan-making authority—

s. 15DB(2)(b)(i)

is independent of the authority,

s. 15DB(2)(b)(ii)

does not have an interest in any land that may be affected by the supplementary plan, and

s. 15DB(2)(b)(iii)

has appropriate qualifications and experience.

s. 15DB(3)

In the following provisions of this section, the person appointed by the Secretary of State under paragraph (a) of subsection (2), or (as the case may be) the person to whom the supplementary plan is submitted under paragraph (b) of that subsection, is “the examiner”.

s. 15DB(4)

The authority must also send or make available to the examiner (in addition to the supplementary plan) such other documents (or copies of documents) and such information as is prescribed.

s. 15DB(5)

The purpose of the independent examination is to determine in respect of the supplementary plan—

s. 15DB(5)(a)

whether the requirements of section 15CC, and regulations under subsection (11) of that section relating to the preparation of the plan, have been met, and

s. 15DB(5)(b)

whether the relevant plan-making authority have had regard to any guidance issued by the Secretary of State which may be relevant.

s. 15DB(6)

The general rule is that the independent examination is to take the form of written representations.

s. 15DB(7)

But the examiner must cause a hearing to be held for the purposes of receiving oral representations in any case where the examiner considers that the consideration of oral representations is necessary to ensure adequate examination of an issue or that a person has a fair chance to put a case.

s. 15DB(8)

If a hearing is held under subsection (7), any person who makes representations about the matters mentioned in subsection (5) must (if that person so requests) be given the opportunity to appear before and be heard by the examiner

s. 15DB(9)

Where the examiner considers that, in all the circumstances, it would be reasonable to conclude—the examiner must recommend that the supplementary plan is adopted and give reasons for the recommendation.

s. 15DB(9)(a)

that the requirements mentioned in subsection (5)(a) have been met, and

s. 15DB(9)(b)

the relevant plan-making authority have had regard to any guidance issued by the Secretary of State which may be relevant,

s. 15DB(10)

Subsections (11) and (12) apply where the examiner—

s. 15DB(10)(a)

has carried out the examination, and

s. 15DB(10)(b)

is not required by subsection (9) to recommend that the supplementary plan is adopted.

s. 15DB(11)

If the examiner considers that—the examiner must recommend that those modifications are made and that the plan is then adopted and give reasons for the recommendation.

s. 15DB(11)(a)

certain modifications of the supplementary plan would result in it being reasonable to conclude, in all the circumstances, that the requirements mentioned in subsection (5)(a) are met, and

s. 15DB(11)(b)

it is, in all the circumstances, reasonable to conclude that the relevant plan-making authority have had regard to any guidance issued by the Secretary of State which may be relevant,

s. 15DB(12)

Where the examiner has carried out the examination and is not required by subsection (11) to recommend that the supplementary plan is adopted with modifications, the examiner must—

s. 15DB(12)(a)

recommend that the supplementary plan is withdrawn, and

s. 15DB(12)(b)

give reasons for the recommendation.

s. 15DB(13)

The relevant plan-making authority must publish the recommendations and reasons they receive under this section.

Withdrawal and adoption of plans

s. 15E — Withdrawal of a local plan
s. 15E(1)

A local planning authority may, at any time before they are required to submit a local plan for independent examination under section 15D, withdraw the plan.

s. 15E(2)

After a local plan has been submitted for independent examination, the local planning authority may only withdraw the plan—

s. 15E(2)(a)

if the person appointed to carry out the examination recommends that they do so and the Secretary of State has not directed that it is not to be withdrawn, or

s. 15E(2)(b)

the Secretary of State directs that the plan is to be withdrawn.

s. 15E(3)

The Secretary of State may at any time—direct the local planning authority to withdraw the plan.

s. 15E(3)(a)

after a local plan has been submitted for independent examination under section 15D, but

s. 15E(3)(b)

before it is adopted under section 15EA,

s. 15EA — Adoption of local plan or supplementary plan
s. 15EA(1)

Where the person appointed to carry out the independent examination of a local plan recommends that the plan as originally prepared is adopted, the local planning authority may adopt it—

s. 15EA(1)(a)

as originally prepared, or

s. 15EA(1)(b)

with modifications that (taken together) do not materially affect its contents.

s. 15EA(2)

Where the person appointed to carry out the independent examination of a local plan recommends that the plan is adopted with modifications, the local planning authority may adopt it—

s. 15EA(2)(a)

with those modifications, or

s. 15EA(2)(b)

with those modifications, along with further modifications if the further modifications (taken together) do not materially affect its contents.

s. 15EA(3)

Where the person appointed to carry out the independent examination of a supplementary plan recommends that the plan as originally prepared is adopted, the relevant plan-making authority may adopt it—

s. 15EA(3)(a)

as originally prepared, or

s. 15EA(3)(b)

with modifications that (taken together) do not materially affect its contents.

s. 15EA(4)

Where the person appointed to carry out the independent examination of a supplementary plan recommends that the plan is adopted with modifications, the relevant plan-making authority may adopt it—

s. 15EA(4)(a)

with those modifications, or

s. 15EA(4)(b)

with those modifications, along with further modifications if the further modifications (taken together) do not materially affect its contents.

s. 15EA(5)

An authority must not adopt a local plan or supplementary plan unless they do so in accordance with subsection (1), (2), (3) or (4).

s. 15EA(6)

A plan is adopted by a local planning authority, or a minerals and waste planning authority, if it is adopted by a resolution of the authority.

s. 15EA(7)

The Mayor of London adopts a supplementary plan by publishing it, together with a statement that the plan is to have effect.

Requirement in relation to design code

s. 15F — Design code for whole area
s. 15F(1)

A local planning authority must ensure that, for every part of their area, the development plan includes requirements with respect to design that relate to development, or development of a particular description, which the authority consider should be met for planning permission for the development to be granted.

s. 15F(2)

Subsection (1) does not require the local planning authority to ensure—

s. 15F(2)(a)

that there are requirements for every description of development for every part of their area, or

s. 15F(2)(b)

that there are requirements in relation to every aspect of design.

Revocation and revision of plans

s. 15G — Revocation of local plans and supplementary plans
s. 15G(1)

A local plan is revoked upon a new local plan for the local planning authority’s area being adopted or approved under this Part.

s. 15G(2)

The Secretary of State—

s. 15G(2)(a)

may revoke a local plan at the request of the local planning authority;

s. 15G(2)(b)

may revoke a supplementary plan at the request of the relevant plan-making authority;

s. 15G(2)(c)

may prescribe descriptions of supplementary plan which may be revoked by the relevant plan-making authority themselves.

s. 15GA — Revision of local plan
s. 15GA(1)

A local planning authority may, at any time after their local plan has come into effect, prepare a revision of it.

s. 15GA(2)

If the Secretary of State directs them to do so after the local plan comes into effect, a local planning authority must prepare a revision of the local plan, in accordance with such timetable as the Secretary of State directs.

s. 15GA(3)

Subsection (4) applies if any part of the area of the local planning authority is an area to which an enterprise zone scheme relates.

s. 15GA(4)

As soon as practicable after the occurrence of a relevant event—

s. 15GA(4)(a)

the authority must consider whether their local plan should be changed in the light of the enterprise zone scheme;

s. 15GA(4)(b)

if they think that any changes to their local plan are required in consequence of the scheme they must prepare a revision to their local plan to give effect to the changes.

s. 15GA(5)

The following are relevant events—

s. 15GA(5)(a)

the making of an order under paragraph 5 of Schedule 32 to the Local Government, Planning and Land Act 1980 (designation of enterprise zone);

s. 15GA(5)(b)

the giving of notification under paragraph 11(1) of that Schedule (approval of modification of enterprise zone scheme).

s. 15GA(6)

References to an enterprise zone and an enterprise zone scheme must be construed in accordance with that Act.

s. 15GA(7)

This Part applies in relation to a revision under this section as it applies in relation to a local plan, subject to such modifications as may be prescribed.

Intervention powers in relation to plans

s. 15H — Power to require Secretary of State approval
s. 15H(1)

At any time before a proposed local plan is adopted by a local planning authority, the Secretary of State may direct the local planning authority to submit the plan (or any part of it) to the Secretary of State for approval.

s. 15H(2)

At any time before a proposed supplementary plan is adopted by a relevant plan-making authority, the Secretary of State may direct the relevant plan-making authority to submit the plan (or any part of it) to the Secretary of State for approval.

s. 15H(3)

Where the Secretary of State gives a direction under subsection (1) or (2)—

s. 15H(3)(a)

the authority must not take any step in connection with the adoption of the plan until the Secretary of State gives the Secretary of State’s decision or withdraws the direction;

s. 15H(3)(b)

if the direction is given, and not withdrawn, before the authority have submitted the plan for independent examination, the Secretary of State must hold an independent examination;

s. 15H(3)(c)

if the direction is given after the authority have submitted the plan for independent examination but before the person appointed to carry out the examination has made recommendations, and is not withdrawn before those recommendations are made, the person must make the recommendations to the Secretary of State.

s. 15H(4)

Subsections (4) to (12) of section 15D, and section 15DA, apply to an examination of a local plan held under subsection (3)(b).

s. 15H(5)

In the case of an examination of a supplementary plan held under subsection (3)(b)—

s. 15H(5)(a)

subsections (5) to (12) of section 15DB apply, and

s. 15H(5)(b)

the examiner is to be a person appointed by the Secretary of State.

s. 15H(6)

The Secretary of State must publish the recommendations made to the Secretary of State by virtue of subsection (3)(c) and the reasons of the person making the recommendations.

s. 15H(7)

In relation to a plan or part of a plan submitted under subsection (1) or (2), the Secretary of State—

s. 15H(7)(a)

may approve, approve subject to modifications or reject the plan or part, and

s. 15H(7)(b)

must give reasons for the decision under paragraph (a).

s. 15H(8)

In the exercise of any function under this section the Secretary of State—

s. 15H(8)(a)

may take account of any matter which the Secretary of State thinks is relevant (regardless of whether the matter was taken account of by the authority), and

s. 15H(8)(b)

must have regard to the local plan timetable and minerals and waste plan timetable, so far as relevant.

s. 15HA — Secretary of State powers where local planning authority are failing etc
s. 15HA(1)

This section applies if the Secretary of State thinks that—

s. 15HA(1)(a)

a local planning authority are failing to do anything it is necessary or expedient for them to do in connection with the preparation, adoption or revision of a local plan,

s. 15HA(1)(b)

a local plan or supplementary plan is, is going to be or may be unsatisfactory, or

s. 15HA(1)(c)

a proposed revision of a local plan or supplementary plan will, or may, result in the plan becoming unsatisfactory.

s. 15HA(2)

The Secretary of State may—

s. 15HA(2)(a)

if the plan has not come into effect, take over preparation of the plan from the relevant authority;

s. 15HA(2)(b)

if the plan has come into effect, revise the plan;

s. 15HA(2)(c)

give directions to the relevant authority in relation to—

s. 15HA(2)(c)(i)

the preparation or adoption of the plan (including a direction requiring the plan to be modified in accordance with the direction);

s. 15HA(2)(c)(ii)

the revocation or revision of the plan (including a direction requiring the plan to be revised in accordance with the direction or a direction revoking the plan).

s. 15HA(3)

The Secretary of State may appoint a person (a “local plan commissioner”) to—

s. 15HA(3)(a)

investigate and report to the Secretary of State, or

s. 15HA(3)(b)

do any of the things that may be done under subsection (2), on the Secretary of State’s behalf.

s. 15HA(4)

Subsections (5) to (10) apply if preparation of the plan is taken over under subsection (2)(a) or (3)(b).

s. 15HA(5)

The Secretary of State or (as the case may be) the local plan commissioner must publish a document setting out—

s. 15HA(5)(a)

their timetable for preparing the plan, and

s. 15HA(5)(b)

if they intend to depart from anything specified in a local plan timetable in relation to the plan, details of how they intend to depart from it.

s. 15HA(6)

The Secretary of State must—

s. 15HA(6)(a)

hold an independent examination of the plan or (as the case may be) direct the local plan commissioner to submit the plan for independent examination, or

s. 15HA(6)(b)

direct the relevant authority to submit the plan for independent examination under section 15D or (as the case may be) 15DB.

s. 15HA(7)

Subsections (4) to (12) of section 15D, and section 15DA, apply to an examination of a local plan held under subsection (6)(a), reading references to the local planning authority as references to the Secretary of State or (as the case may be) the local plan commissioner.

s. 15HA(8)

In the case of an examination of a supplementary plan held under subsection (6)(a)—

s. 15HA(8)(a)

subsections (5) to (12) of section 15DB apply, reading references to the relevant plan-making authority as references to the Secretary of State or (as the case may be) the local plan commissioner, and

s. 15HA(8)(b)

the examiner is to be a person appointed by the Secretary of State or the local plan commissioner.

s. 15HA(9)

The Secretary of State must either—

s. 15HA(9)(a)

publish the recommendations and reasons of the person appointed to hold the examination, or

s. 15HA(9)(b)

give directions to the relevant authority or local plan commissioner in relation to publication of those recommendations and reasons.

s. 15HA(10)

The Secretary of State or local plan commissioner may then—

s. 15HA(10)(a)

approve the plan or approve it subject to modifications,

s. 15HA(10)(b)

direct the relevant authority to consider adopting the plan, or

s. 15HA(10)(c)

reject the plan.

s. 15HA(11)

Subsections (5) to (10) (and the provisions applied by them) apply in relation to a revision to a plan under subsection (2)(b) or (3)(b) as they apply to a plan prepared under subsection (2)(a) or (3)(b).

s. 15HA(12)

In the exercise of any function under this section, the Secretary of State or local plan commissioner may take account of any matter which the Secretary of State or local plan commissioner thinks is relevant (regardless of whether the matter was taken account of by the relevant authority).

s. 15HA(13)

The Secretary of State must give reasons for anything the Secretary of State does in pursuance of subsection (2) or (10).

s. 15HA(14)

A local plan commissioner must give reasons for anything the commissioner does in pursuance of subsection (3)(b) or (10).

s. 15HA(15)

In this section “relevant authority”—

s. 15HA(15)(a)

in relation to a local plan, means the local planning authority, or

s. 15HA(15)(b)

in relation to a supplementary plan, means the relevant plan-making authority.

s. 15HB — Secretary of State powers where local planning authority fails to ensure design code
s. 15HB(1)

This section applies where the Secretary of State considers that a local planning authority are unlikely to comply, or have not complied, with the requirement in section 15F(1).

s. 15HB(2)

The Secretary of State may give directions to the local planning authority as to the steps they must take to comply with that requirement, including directions as to the preparation, adoption or revision of their local plan or one or more supplementary plans.

s. 15HB(3)

The Secretary of State must give reasons for any directions given under this section.

s. 15HC — Liability for Secretary of State’s costs of intervention
s. 15HC(1)

The Secretary of State may require the relevant authority to—

s. 15HC(1)(a)

reimburse the Secretary of State for any expenditure incurred by the Secretary of State in, or in connection with, exercising a function under any of sections 15H to 15HB, or

s. 15HC(1)(b)

pay any fees and expenses of a local plan commissioner appointed under section 15HA(3).

s. 15HC(2)

Where a function under any of those sections is exercised in relation to a joint local plan or joint supplementary plan, the Secretary of State may apportion liability for such expenditure on such basis as the Secretary of State thinks just and reasonable between the authorities who are jointly preparing, or have jointly prepared, the plan.

s. 15HC(3)

In subsection (1) “relevant authority” means—

s. 15HC(3)(a)

where the function is exercised, or the local plan commissioner is appointed, in relation a local plan, the local planning authority;

s. 15HC(3)(b)

where the function is exercised, or the local plan commissioner is appointed, in relation to a supplementary plan, the relevant plan-making authority.

s. 15HD — Default powers exercisable by Mayor of London, combined authority, combined county authority or county council

Schedule A1 (default powers exercisable by Mayor of London, combined authority, combined county authority or county council) has effect.

s. 15HE — Temporary direction pending possible use of intervention or default powers
s. 15HE(1)

If the Secretary of State is considering whether to take action under section 15H, 15HA or 15HB or Schedule A1 in relation to a local plan or a supplementary plan, the Secretary of State may direct the local planning authority or (as the case may be) the relevant plan-making authority not to take any step, or not to take a step specified in the direction, in connection with the plan—

s. 15HE(1)(a)

until a time or event (if any) specified in the direction, or

s. 15HE(1)(b)

until the direction is withdrawn.

s. 15HE(2)

A plan to which a direction under this section relates has no effect while the direction is in force.

s. 15HE(3)

A direction given under this section in relation to a plan ceases to have effect if—

s. 15HE(3)(a)

the Secretary of State—

s. 15HE(3)(a)(i)

gives a direction under section 15H, 15HA(2)(c) or (10)(b) or 15HB(2) or paragraph 8(5) of Schedule A1 in relation to the plan, or

s. 15HE(3)(a)(ii)

approves the plan under section 15HA(10)(a),

s. 15HE(3)(b)

a local plan commissioner—

s. 15HE(3)(b)(i)

gives a direction under section 15HA(3)(b), or

s. 15HE(3)(b)(ii)

approves the plan under section 15HA(10)(a),

s. 15HE(3)(c)

the Mayor of London does anything under paragraph 2(4) of Schedule A1,

s. 15HE(3)(d)

a combined authority does anything under paragraph 6(4) of that Schedule, or

s. 15HE(3)(e)

a county council does anything under paragraph 7C(4) of that Schedule.

Joint plans

s. 15I — Joint local plans by agreement or direction
s. 15I(1)

A joint local plan is a local plan prepared jointly by two or more local planning authorities for their combined areas.

s. 15I(2)

Two or more local planning authorities may agree to prepare a joint local plan (a “joint local plan agreement”).

s. 15I(3)

The Secretary of State may direct two or more local planning authorities to prepare a joint local plan (a “joint local plan direction”).

s. 15I(4)

The Secretary of State may give a joint local plan direction to a local planning authority whether or not the authority’s local plan timetable specifies that their local plan for their area is to be a joint local plan.

s. 15I(5)

The Secretary of State may give a joint local plan direction only if the Secretary of State considers that to do so will facilitate the more effective planning of the development and use of land in the area of one or more of the local planning authorities in question.

s. 15I(6)

A joint local plan direction may specify the timetable for preparation of the joint local plan.

s. 15I(7)

The Secretary of State must, when giving a joint local plan direction, notify the local planning authorities to which it applies of the reasons for giving it.

s. 15I(8)

If the Secretary of State gives a joint local plan direction, the Secretary of State may direct the local planning authorities to which it is given to amend their local plan timetables to take account of the direction.

s. 15I(9)

The Secretary of State may modify or withdraw a joint local plan direction by notice in writing to the authorities to which it was given.

s. 15I(10)

The Secretary of State must, when modifying or withdrawing a joint local plan direction, notify the local planning authorities to which it was given of the reasons for the modification or withdrawal.

s. 15IA — Joint local plans: application of Part
s. 15IA(1)

This section applies in a case where—

s. 15IA(1)(a)

a joint local plan agreement is made, or

s. 15IA(1)(b)

a joint local plan direction is given.

s. 15IA(2)

This Part applies for the purposes of any step which may be, or is required to be, taken in relation to the joint local plan as it applies for the purposes of any step which may be, or is required to be, taken in relation to a local plan.

s. 15IA(3)

For the purposes of subsection (2) anything which must be done by or in relation to a local planning authority in connection with a local plan must be done by or in relation to each of the relevant authorities in connection with the joint local plan.

s. 15IA(4)

Subsections (2) and (3) are subject to such modifications of this Part, as it applies to joint local plans, as may be prescribed.

s. 15IA(5)

If the relevant authorities include one or more authorities in relation to whose area a spatial development strategy is operative, the requirements of this Part in relation to the spatial development strategy, which apply to or in respect of local plans, apply—

s. 15IA(5)(a)

to or in respect of the joint local plan, and

s. 15IA(5)(b)

in relation to such of the area to which the joint local plan relates as the spatial development strategy is operative in relation to.

s. 15IA(6)

In this section “the relevant authorities” are the local planning authorities who are to prepare a joint local plan in accordance with the joint local plan agreement or joint local plan direction.

s. 15IB — Joint local plan agreement or direction: withdrawal or modification
s. 15IB(1)

This section applies if—

s. 15IB(1)(a)

a relevant authority withdraw from a joint local plan agreement,

s. 15IB(1)(b)

the Secretary of State withdraws a joint local plan direction, or

s. 15IB(1)(c)

the Secretary of State modifies a joint local plan direction so that it ceases to apply to one or more of the relevant authorities to which it was given.

s. 15IB(2)

Any step taken in relation to the joint local plan must be treated as a step taken by—

s. 15IB(2)(a)

a relevant authority for the purposes of any corresponding local plan prepared by them;

s. 15IB(2)(b)

two or more other relevant authorities for the purposes of any corresponding joint local plan.

s. 15IB(3)

Any independent examination of the joint local plan must be suspended.

s. 15IB(4)

If, before the end of the period prescribed for the purposes of this subsection, a relevant authority request the Secretary of State to do so, the Secretary of State may direct that—

s. 15IB(4)(a)

the examination is resumed in relation to—

s. 15IB(4)(a)(i)

any corresponding local plan prepared by a relevant authority, or

s. 15IB(4)(a)(ii)

any corresponding joint local plan prepared by two or more of the relevant authorities;

s. 15IB(4)(b)

any step taken for the purposes of the suspended examination has effect for the purposes of the resumed examination.

s. 15IB(5)

The Secretary of State may by regulations make provision as to what is a corresponding local plan or a corresponding joint local plan for the purposes of this section.

s. 15IB(6)

For the purposes of this section references to the joint local plan are to the joint local plan to which the joint local plan agreement or (as the case may be) joint local plan direction related.

s. 15IB(7)

In this section “the relevant authorities” are the local planning authorities—

s. 15IB(7)(a)

who were party to the joint local plan agreement immediately before the authority mentioned in subsection (1)(a) withdrew from it, or

s. 15IB(7)(b)

to whom the joint local plan direction applied immediately before it was withdrawn or modified by the Secretary of State.

s. 15IC — Joint supplementary plans by agreement
s. 15IC(1)

Two or more local planning authorities may agree to prepare a joint supplementary plan under section 15CC, in which case in relation to that plan references in subsection (3) of that section to the area of the local planning authority are to be read as references to the combined areas of the relevant authorities.

s. 15IC(2)

Two or more minerals and waste planning authorities may agree to prepare a joint supplementary plan under section 15CC, in which case in relation to that plan references in subsection (5) of that section to the relevant area are to be read as references to the combined relevant areas of the relevant authorities.

s. 15IC(3)

This Part applies for the purposes of any step which may be, or is required to be, taken in relation to the joint supplementary plan as it applies for the purposes of any step which may be, or is required to be, taken in relation to a supplementary plan.

s. 15IC(4)

For the purposes of subsection (3) anything which must be done by or in relation to a local planning authority or (as the case may be) a minerals and waste planning authority in connection with a supplementary plan must be done by or in relation to each of the relevant authorities in connection with the joint supplementary plan.

s. 15IC(5)

Subsections (3) and (4) are subject to such modifications of this Part, as it applies to joint supplementary plans, as may be prescribed.

s. 15IC(6)

If the relevant authorities include one or more authorities in relation to whose area a spatial development strategy is operative, the requirements of this Part in relation to the spatial development strategy, which apply to or in respect of supplementary plans, apply—

s. 15IC(6)(a)

to or in respect of the joint supplementary plan, and

s. 15IC(6)(b)

in relation to such of the area to which the joint supplementary plan relates as the spatial development strategy is operative in relation to.

s. 15IC(7)

Subsections (8) to (10) apply if a relevant authority withdraws from an agreement mentioned in subsection (1) or (2).

s. 15IC(8)

Any step taken in relation to the joint supplementary plan must be treated as a step taken by—

s. 15IC(8)(a)

a relevant authority for the purposes of any corresponding supplementary plan prepared by them;

s. 15IC(8)(b)

two or more other relevant authorities for the purposes of any corresponding joint supplementary plan.

s. 15IC(9)

Any independent examination of the joint supplementary plan must be suspended.

s. 15IC(10)

If, before the end of the period prescribed for the purposes of this subsection, any of the relevant authorities request the Secretary of State to do so, the Secretary of State may direct that—

s. 15IC(10)(a)

the examination is resumed in relation to—

s. 15IC(10)(a)(i)

any corresponding supplementary plan prepared by any of the relevant authorities, or

s. 15IC(10)(a)(ii)

any corresponding joint supplementary plan prepared by two or more of the relevant authorities;

s. 15IC(10)(b)

any step taken for the purposes of the suspended examination has effect for the purposes of the resumed examination.

s. 15IC(11)

The Secretary of State may by regulations make provision as to what is a corresponding supplementary plan or a corresponding joint supplementary plan for the purposes of this section.

s. 15IC(12)

A joint supplementary plan is a supplementary plan prepared jointly by two or more relevant authorities in accordance with this section.

s. 15IC(13)

In this section “the relevant authorities” means the authorities who enter into the agreement mentioned in subsection (1) or (as the case may be) (2).

Joint committees

s. 15J — Joint committees
s. 15J(1)

This section applies if one or more local planning authorities agree with one or more county councils in relation to any area of such a council for which there is also a district council to establish a joint committee to be, for the purposes of this Part, the local planning authority—

s. 15J(1)(a)

for the area specified in the agreement;

s. 15J(1)(b)

in respect of such purposes as are so specified.

s. 15J(2)

The Secretary of State may by regulations constitute a joint committee to be the local planning authority—

s. 15J(2)(a)

for the area;

s. 15J(2)(b)

in respect of those purposes.

s. 15J(3)

Such regulations—

s. 15J(3)(a)

must specify the authority or authorities and county council or councils (the “constituent authorities”) which are to constitute the joint committee;

s. 15J(3)(b)

may make provision as to such other matters as the Secretary of State thinks are necessary or expedient to facilitate the exercise by the joint committee of its functions.

s. 15J(4)

Regulations under subsection (3)(b) may include provision—

s. 15J(4)(a)

corresponding to provisions relating to joint committees in Part 6 of the Local Government Act 1972;

s. 15J(4)(b)

applying (with or without modifications) such enactments relating to local authorities as the Secretary of State thinks appropriate;

s. 15J(4)(c)

modifying the application of this Part in relation to the joint committee.

s. 15J(5)

For the purposes of subsection (4) a local authority is any of the following—

s. 15J(5)(a)

a county council;

s. 15J(5)(b)

a district council;

s. 15J(5)(c)

a London borough council.

s. 15J(6)

If regulations under this section are annulled in pursuance of a resolution of either House of Parliament—

s. 15J(6)(a)

with effect from the date of the resolution the joint committee ceases to be the local planning authority as mentioned in subsection (2);

s. 15J(6)(b)

anything which the joint committee (as the local planning authority) was required to do for the purposes of this Part must be done for their area by each local planning authority which were a constituent authority of the joint committee;

s. 15J(6)(c)

each of those local planning authorities must revise their local plan timetable accordingly.

s. 15J(7)

Nothing in this section or section 15JA confers on a local planning authority constituted by virtue of regulations under this section any function in relation to section 13 or 14 (survey of area).

s. 15J(8)

This section and section 15JA are subject to the requirement in section 15C(2) that only one local plan may have effect in relation to the area of a local planning authority (including one constituted by virtue of regulations under this section) at any one time.

s. 15J(9)

The policies contained in any local plan or supplementary plan adopted by the joint committee in the exercise of its functions under this Part must be taken for the purposes of the planning Acts to be the policies of each of the constituent authorities which are a local planning authority.

s. 15J(10)

Subsection (11) applies to any function—

s. 15J(10)(a)

which is conferred on a local planning authority (within the meaning of the principal Act) under or by virtue of the planning Acts, and

s. 15J(10)(b)

which relates to the authority’s local plan timetable, local plan or supplementary plan.

s. 15J(11)

If the authority is a constituent authority of a joint committee references to the authority’s local plan timetable, local plan or supplementary plan must be construed, in relation to that function, as including references to the timetable or plan of the joint committee.

s. 15JA — Joint committees: additional functions
s. 15JA(1)

This section applies if the constituent authorities of a joint committee agree that the joint committee is to be, for the purposes of this Part, the local planning authority for any area or purpose which is not the subject of—

s. 15JA(1)(a)

regulations under section 15J, or

s. 15JA(1)(b)

an earlier agreement under this section.

s. 15JA(2)

Each of the constituent authorities and the joint committee must revise their local plan timetable in accordance with the agreement.

s. 15JA(3)

With effect from the date when the last such revision takes effect the joint committee is, for the purposes of this Part, the local planning authority for the area or purpose mentioned in subsection (1).

s. 15JB — Dissolution of joint committee
s. 15JB(1)

This section applies if a constituent authority requests the Secretary of State to revoke regulations constituting a joint committee as the local planning authority for any area or in respect of any purpose.

s. 15JB(2)

The Secretary of State may revoke the regulations.

s. 15JB(3)

If the Secretary of State does so, any step taken by the joint committee in relation to a local plan timetable, local plan or supplementary plan must be treated for the purposes of any corresponding timetable or plan as a step taken by a successor authority.

s. 15JB(4)

A successor authority is—

s. 15JB(4)(a)

a local planning authority which were a constituent authority of the joint committee;

s. 15JB(4)(b)

a joint committee constituted by regulations under section 15J for an area which does not include an area which was not part of the area of the joint committee mentioned in subsection (1).

s. 15JB(5)

If the revocation takes effect at a time when an independent examination is being carried out in relation to a local plan or supplementary plan in relation to which the joint committee is the local planning authority the examination must be suspended.

s. 15JB(6)

But if, before the end of the period prescribed for the purposes of this subsection, a successor authority falling within subsection (4)(a) requests the Secretary of State to do so, the Secretary of State may direct that—

s. 15JB(6)(a)

the examination is resumed in relation to the corresponding plan;

s. 15JB(6)(b)

any step taken for the purposes of the suspended examination has effect for the purposes of the resumed examination.

s. 15JB(7)

The Secretary of State may by regulations make provision as to what is a corresponding timetable or plan.

General

s. 15L — Exclusion of certain representations
s. 15L(1)

This section applies to any representation or objection in respect of anything which is done or is proposed to be done in pursuance of—

s. 15L(1)(a)

an order or scheme under section 10, 14, 16, 18, 106(1) or (3) or 108(1) of the Highways Act 1980;

s. 15L(1)(b)

an order under section 1 of the New Towns Act 1981.

s. 15L(2)

If the Secretary of State or a local planning authority thinks that a representation made in relation to a local plan or supplementary plan is in substance a representation or objection to which this section applies the Secretary of State or (as the case may be) the authority may disregard it.

s. 15LA — Development corporations: power to disapply provisions

The Secretary of State may direct that the provisions of—do not apply to the area of an urban development corporation or a development corporation established under the New Towns Act 1981.

s. 15LA(a)

this Part, or

s. 15LA(b)

any particular regulations made under section 14A,

s. 15LB — Guidance
s. 15LB(1)

In the exercise of any function conferred by or under this Part a relevant plan-making authority must have regard to any guidance issued by the Secretary of State.

s. 15LB(2)

The Secretary of State must issue guidance for local planning authorities on how their local plan and any supplementary plans (taken as a whole) should address housing needs that result from old age or disability.

s. 15LC — Monitoring information
s. 15LC(1)

The Secretary of State may prescribe information within subsection (3) which each local planning authority must make available to the public.

s. 15LC(2)

The Secretary of State may prescribe information within subsection (3) which each local planning authority must provide to the Secretary of State.

s. 15LC(3)

Information is within this subsection if it relates to—

s. 15LC(3)(a)

the implementation of the local planning authority’s local plan timetable;

s. 15LC(3)(b)

the implementation of policies in their local plan and any supplementary plans they have prepared;

s. 15LC(3)(c)

the implementation of any policies which relate to the authority’s area, in any spatial development strategy that is operative in relation to their area;

s. 15LC(3)(d)

the extent to which specified environmental outcomes (within the meaning of Part 6 of the Levelling-up and Regeneration Act 2023) are being delivered in relation to the authority’s area.

s. 15LC(4)

The information must be in such form, and made available or provided in such manner, as may be prescribed.

s. 15LD — Policies map
s. 15LD(1)

Each local planning authority must ensure that a map, to be known as a “policies map”, is prepared, and kept up to date, which illustrates the geographical application of the development plan for the authority’s area.

s. 15LD(2)

The map prepared and kept up to date under subsection (1)—

s. 15LD(2)(a)

must be in such form, and have such content, as may be prescribed,

s. 15LD(2)(b)

must be revised at such times, or in such circumstances, as may be prescribed, and

s. 15LD(2)(c)

must be made available to the public.

s. 15LE — Regulations
s. 15LE(1)

The Secretary of State may by regulations make provision in connection with the exercise by any person of a function conferred by or under this Part.

s. 15LE(2)

The regulations may, in particular, include provision as to—

s. 15LE(2)(a)

the form and content of a joint spatial development strategy;

s. 15LE(2)(b)

the documents (if any) which must accompany a joint spatial development strategy;

s. 15LE(2)(c)

the procedure to be followed in connection with the preparation, adoption, publication, review, alteration or withdrawal of a joint spatial development strategy or in connection with any review under section 15AE(2);

s. 15LE(2)(d)

the procedure to be followed in the preparation, adoption, review, revision or withdrawal of local plans or supplementary plans;

s. 15LE(2)(e)

requirements about the giving of notice and publicity;

s. 15LE(2)(f)

requirements about inspection by the public of a local plan, supplementary plan or any other document;

s. 15LE(2)(g)

consultation with, or participation by, the public or any prescribed body or other person in connection with anything done under this Part, including provision imposing requirements for consultation or participation or as to the nature and extent of the consultation or participation that may or must take place;

s. 15LE(2)(h)

the making of representations about any matter to be included in a local plan or supplementary plan;

s. 15LE(2)(i)

consideration of any such representations;

s. 15LE(2)(j)

the remuneration and allowances payable to a person appointed to provide observations or advice under section 15CA(3), carry out a public or independent examination under this Part or act as a local plan commissioner under section 15HA(3);

s. 15LE(2)(k)

the procedure to be followed in the preparation, making, modification, revocation, replacement or publication of a neighbourhood priorities statement;

s. 15LE(2)(l)

the form, and content, of a neighbourhood priorities statement;

s. 15LE(2)(m)

the determination of the time by or at which anything must be done for the purposes of this Part;

s. 15LE(2)(n)

the manner of publication of any draft, report or other document published under this Part;

s. 15LE(2)(o)

monitoring the exercise by local planning authorities of their functions under this Part;

s. 15LE(2)(p)

the making of reasonable charges for the provision of copies of documents required by or under this Part.

s. 15LE(3)

Regulations under subsection (2)(l) may provide for the form or content of a neighbourhood priorities statement to be determined by the Secretary of State.

s. 15LE(4)

Regulations under this Part may make different provision for different areas.

s. 15LF — Meaning of “local planning authority” etc
s. 15LF(1)

This section applies for the purposes of this Part.

s. 15LF(2)

Each of the following is a local planning authority for their area—

s. 15LF(2)(a)

a district council;

s. 15LF(2)(b)

a London borough council;

s. 15LF(2)(c)

a metropolitan district council;

s. 15LF(2)(d)

a county council in relation to any area in England for which there is no district council.

s. 15LF(3)

A National Park authority is the local planning authority for the whole of its area, in place of any authority who would otherwise be a local planning authority for any part of that area under subsection (2).

s. 15LF(4)

The Broads Authority is the local planning authority for the Broads, in place of any authority who would otherwise be a local planning authority for any part of the Broads under subsection (2).

s. 15LF(5)

Where a relevant order provides that a development corporation is to be the local planning authority for an area for some or all purposes of this Part, the development corporation is the local planning authority for that area and those purposes in place of any authority who would otherwise be the local planning authority for that area and those purposes.

s. 15LF(6)

In subsection (5)—“development corporation” means an urban development corporation, a development corporation established under the New Towns Act 1981 or a Mayoral development corporation;“relevant order”—in relation to an urban development corporation, means an order under section 149(1A) of the Local Government, Planning and Land Act 1980; in relation to a development corporation established under the New Towns Act 1981, means an order under section 7A(2)(b) of that Act; in relation to a Mayoral development corporation, means an order under section 198(2) of the Localism Act 2011.

s. 15LF(7)

Subsection (5) is subject to subsections (8) and (9).

s. 15LF(8)

Subsection (9) applies where a designation order under section 13 of the Housing and Regeneration Act 2008 (power to make designation orders) provides that the Homes and Communities Agency is to be the local planning authority—

s. 15LF(8)(a)

for an area specified in the order, and

s. 15LF(8)(b)

for all purposes of this Part or any such purposes so specified.

s. 15LF(9)

The Homes and Communities Agency is the local planning authority for the area and the purposes concerned in place of any authority who would otherwise be the local planning authority for that area and those purposes.

s. 15LF(10)

See also section 15J under which joint committees can be constituted to be local planning authorities for the purposes of this Part.

s. 15LF(11)

References (other than in this section) to a local planning authority’s area are to the area for which they are the local planning authority in accordance with this Part.

s. 15LG — Meaning of “minerals and waste planning authority” etc
s. 15LG(1)

This section has effect for the purposes of this Part.

s. 15LG(2)

Subject to subsection (3)—

s. 15LG(2)(a)

a county council in England is the minerals and waste planning authority for their area,

s. 15LG(2)(b)

a London borough council is the minerals and waste planning authority for their area,

s. 15LG(2)(c)

a metropolitan district council is the minerals and waste planning authority for their area, and

s. 15LG(2)(d)

a district council is the minerals and waste planning authority for any part of their area for which there is no county council.

s. 15LG(3)

A National Park authority is the minerals and waste planning authority for the whole of its area, in place of any authority who would otherwise be a minerals and waste planning authority for any part of that area under subsection (2).

s. 15LG(4)

Where a relevant order provides that a development corporation is to be the minerals and waste planning authority for an area for some or all purposes of this Part, the development corporation is the minerals and waste planning authority for that area and those purposes in place of any authority who would otherwise be the minerals and waste planning authority for that area and those purposes.

s. 15LG(5)

In subsection (4)—“development corporation” means an urban development corporation, a development corporation established under the New Towns Act 1981 or a Mayoral development corporation;“relevant order”—in relation to an urban development corporation, means an order under section 149(2A) of the Local Government, Planning and Land Act 1980; in relation to a development corporation established under the New Towns Act 1981, means an order under section 7A(6) of that Act; in relation to a Mayoral development corporation, means an order under section 198(2) of the Localism Act 2011.

s. 15LG(6)

“Relevant area”, in relation to a minerals and waste planning authority, means the area for which the authority are the minerals and waste planning authority in accordance with this section.

s. 15LH — Interpretation
s. 15LH(1)

This section has effect for the purposes of this Part.

s. 15LH(2)

Each of the following is a relevant plan-making authority—

s. 15LH(2)(a)

the Mayor of London;

s. 15LH(2)(b)

a local planning authority;

s. 15LH(2)(c)

a minerals and waste planning authority.

s. 15LH(3)

In this Part (unless a contrary intention appears)—“affordable housing” means—social housing within the meaning of Part 2 of the Housing and Regeneration Act 2008, and any other description of housing that may be prescribed;“constituent authority”, in relation to a joint committee, must be construed in accordance with section 15J(3);“joint local plan” must be construed in accordance with section 15I(1);“joint local plan agreement” must be construed in accordance with section 15I(2);“joint local plan direction” must be construed in accordance with section 15I(3);“joint spatial development strategy” means a strategy adopted by local planning authorities under section 15AD or, as the context requires, a strategy in preparation further to an agreement under section 15A(1);“joint supplementary plan” must be construed in accordance with section 15IC;“local nature recovery strategy” means a local nature recovery strategy under section 104 of the Environment Act 2021;“local plan” must be construed in accordance with section 15C;“local plan timetable” must be construed in accordance with section 15B;“local planning authority” must be construed in accordance with section 15LF;“minerals and waste development” means development which is a county matter within the meaning of paragraph 1 of Schedule 1 to the principal Act (ignoring sub-paragraph (1)(i) of that paragraph);“minerals and waste plan” must be construed in accordance with section 15CB;“minerals and waste plan timetable” must be construed in accordance with section 15BB;“minerals and waste planning authority” must be construed in accordance with section 15LG;“neighbourhood priorities statement” must be construed in accordance with section 15K;“relevant area” must be construed in accordance with section 15LG;“relevant plan-making authority” must be construed in accordance with subsection (2);“spatial development strategy” means (except in the context of more specific expressions)—the spatial development strategy for London, a spatial development strategy adopted by a combined authority established under section 103 of the Local Democracy, Economic Development and Construction Act 2009, or a joint spatial development strategy;“spatial development strategy for London” means the strategy adopted by the Mayor of London under Part 8 of the Greater London Authority Act 1999;“supplementary plan” must be construed in accordance with section 15CC.

Documents

s. 17 — Local development documents
s. 17(1)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 17(2)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 17(3)

The local planning authority's local development documents must (taken as a whole) set out the authority’s policies (however expressed) relating to the development and use of land in their area.

s. 17(4)

In the case of the documents which are included in a minerals and waste development scheme they must also (taken as a whole) set out the authority’s policies (however expressed) Where a county council is required to prepare a minerals and waste development scheme in respect of an area, the council's local development documents must (taken as a whole) set out the council's policies (however expressed) for that area within the meaning of paragraph 1 of Schedule 1 to the principal Act (ignoring sub-paragraph (1)(i)).

s. 17(5)

If to any extent a policy set out in a local development document conflicts with any other statement or information in the document the conflict must be resolved in favour of the policy.

s. 17(6)

The authority must keep under review their local development documents having regard to the results of any review carried out under section 13 or 14.

s. 17(6A)

The Secretary of State may by regulations make provision requiring a local planning authority to review a local development document at such times as may be prescribed.

s. 17(6B)

If regulations under subsection (6A) require a local planning authority to review a local development document—

s. 17(6B)(a)

they must consider whether to revise the document following each review, and

s. 17(6B)(b)

if they decide not to do so, they must publish their reasons for considering that no revisions are necessary.

s. 17(6C)

Any duty imposed by virtue of subsection (6A) applies in addition to the duty in subsection (6).

s. 17(7)

Regulations under this section may prescribe—

s. 17(7)(za)

which descriptions of documents are, or if prepared are, to be prepared as local development documents;

s. 17(7)(a)

which descriptions of local development documents are development plan documents;

s. 17(7)(b)

the form and content of the local development documents;

s. 17(7)(c)

the time at which any step in the preparation of any such document must be taken.

s. 17(8)

A document is a local development document only in so far as it or any part of it—

s. 17(8)(a)

is adopted by resolution of the local planning authority as a local development document;

s. 17(8)(b)

is approved by the Secretary of State under section 21 or 27.

s. 17(8)(c)

is approved by the Mayor of London under paragraph 2 of Schedule A1;

s. 17(8)(d)

is approved by a combined authority under paragraph 6 of that Schedule.

s. 17(8)(e)

is approved by an upper-tier county council (as defined in that Schedule) under paragraph 7C of that Schedule.

s. 18 — Statement of community involvement
s. 18(1)

The local planning authority must prepare a statement of community involvement.

s. 18(2)

The statement of community involvement is a statement of the authority’s policy as to the involvement in the exercise of the authority’s functions under sections 13, 15, 19, 26 and 28 of this Act and Part 3 of the principal Act of persons who appear to the authority to have an interest in matters relating to development in their area.

s. 18(2A)

Subject to subsection (2B), the reference in subsection (2) to functions under Part 3 of the principal Act does not include functions under any provision of that Act relating to neighbourhood development orders (including any function under any of sections 61F to 61H of that Act).

s. 18(2B)

A statement of community involvement must set out the local planning authority's policies for giving advice or assistance under—

s. 18(2B)(a)

paragraph 3 of Schedule 4B to the principal Act (advice or assistance on proposals for making of neighbourhood development orders), and

s. 18(2B)(b)

paragraph 3 of Schedule A2 to this Act (advice or assistance on proposals for modification of neighbourhood development plans).

s. 18(2C)

The reference in subsection (2B)(a) to Schedule 4B to the principal Act includes that Schedule as applied by section 38A(3) of this Act (process for making neighbourhood development plans).

s. 18(2D)

Subsection (2B) applies regardless of whether, at any given time—

s. 18(2D)(a)

an area within the area of the authority has been designated as a neighbourhood area, or

s. 18(2D)(b)

there is a qualifying body which is entitled to submit proposals to the authority for the making by the authority of a neighbourhood development order or a neighbourhood development plan.

s. 18(3)

For the purposes of this Part (except sections 19(2) and 24) the statement of community involvement is a local development document. This is subject to section 17(8).

s. 18(3A)

The statement of community involvement must not be specified as a development plan document in the local development scheme.

s. 18(3B)

The Secretary of State may by regulations prescribe matters to be addressed by a statement of community involvement in addition to the matters mentioned in subsection (2).

s. 18(4)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 18(5)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 18(6)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 19 — Preparation of local development documents
s. 19(1)

Development plan documents must be prepared in accordance with the local development scheme.

s. 19(1A)

Development plan documents must (taken as a whole) include policies designed to secure that the development and use of land in the local planning authority's area contribute to the mitigation of, and adaptation to, climate change.

s. 19(1B)

Each local planning authority must identify the strategic priorities for the development and use of land in the authority’s area.

s. 19(1C)

Policies to address those priorities must be set out in the local planning authority’s development plan documents (taken as a whole).

s. 19(1D)

Subsection (1C) does not apply in the case of a London borough council or a Mayoral development corporation if and to the extent that the council or corporation are satisfied that policies to address those priorities are set out in the spatial development strategy.

s. 19(1E)

If a combined authority established under section 103 of the Local Democracy, Economic Development and Construction Act 2009 has the function of preparing the spatial development strategy for the authority’s area, subsection (1D) also applies in relation to—

s. 19(a)

a local planning authority whose area is within, or the same as, the area of the combined authority, and

s. 19(b)

the spatial development strategy published by the combined authority.

s. 19(2)

In preparing a local development document the local planning authority must have regard to—

s. 19(2)(a)

national policies and advice contained in guidance issued by the Secretary of State;

s. 19(2)(aa)

the local development documents which are to be development plan documents;

s. 19(2)(b)

the regional strategy for the region in which the area of the authority is situated, if the area is outside Greater London;

s. 19(2)(c)

the spatial development strategy if the authority are a London borough or if any part of the authority’s area adjoins Greater London;

s. 19(2)(d)

the regional strategy for any region which adjoins the area of the authority;

s. 19(2)(e)

the National Development Framework for Wales, if any part of the authority’s area adjoins Wales;

s. 19(2)(f)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 19(2)(g)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 19(2)(h)

any other local development document which has been adopted by the authority;

s. 19(2)(i)

the resources likely to be available for implementing the proposals in the document;

s. 19(2)(j)

such other matters as the Secretary of State prescribes.

s. 19(3)

In preparing the local development documents (other than their statement of community involvement) the authority must also comply with their statement of community involvement.

s. 19(4)

But subsection (3) does not apply at any time before the authority have adopted their statement of community involvement.

s. 19(5)

The local planning authority must also—

s. 19(5)(a)

carry out an appraisal of the sustainability of the proposals in each development plan document;

s. 19(5)(b)

prepare a report of the findings of the appraisal.

s. 19(6)

The Secretary of State may by regulations make provision—

s. 19(6)(a)

as to any further documents which must be prepared by the authority in connection with the preparation of a local development document;

s. 19(6)(b)

as to the form and content of such documents.

s. 19(7)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 20 — Independent examination
s. 20(1)

The local planning authority must submit every development plan document to the Secretary of State for independent examination.

s. 20(2)

But the authority must not submit such a document unless—

s. 20(2)(a)

they have complied with any relevant requirements contained in regulations under this Part, and

s. 20(2)(b)

they think the document is ready for independent examination.

s. 20(3)

The authority must also send to the Secretary of State (in addition to the development plan document) such other documents (or copies of documents) and such information as is prescribed.

s. 20(4)

The examination must be carried out by a person appointed by the Secretary of State.

s. 20(5)

The purpose of an independent examination is to determine in respect of the development plan document—

s. 20(5)(a)

whether it satisfies the requirements of sections 19 and 24(1), regulations under section 17(7) and any regulations under section 36 relating to the preparation of development plan documents;

s. 20(5)(b)

whether it is sound.; and

s. 20(5)(c)

whether the local planning authority complied with any duty imposed on the authority by section 33A in relation to its preparation.

s. 20(6)

Any person who makes representations seeking to change a development plan document must (if he so requests) be given the opportunity to appear before and be heard by the person carrying out the examination.

s. 20(6A)

The Secretary of State may by notice to the person appointed to carry out the examination—In this subsection “specified” means specified in the notice.

s. 20(6A)(a)

direct the person not to take any step, or any further step, in connection with the examination of the development plan document, or of a specified part of it, until a specified time or until the direction is withdrawn;

s. 20(6A)(b)

require the person—

s. 20(6A)(b)(i)

to consider any specified matters;

s. 20(6A)(b)(ii)

to give an opportunity, or further opportunity, to specified persons to appear before and be heard by the person;

s. 20(6A)(b)(iii)

to take any specified procedural step in connection with the examination.

s. 20(7)

Where the person appointed to carry out the examination—the person must recommend that the document is adopted and give reasons for the recommendation.

s. 20(7)(a)

has carried it out, and

s. 20(7)(b)

considers that, in all the circumstances, it would be reasonable to conclude—

s. 20(7)(b)(i)

that the document satisfies the requirements mentioned in subsection (5)(a) and is sound, and

s. 20(7)(b)(ii)

that the local planning authority complied with any duty imposed on the authority by section 33A in relation to the document's preparation,

s. 20(7A)

Where the person appointed to carry out the examination—the person must recommend non-adoption of the document and give reasons for the recommendation.

s. 20(7A)(a)

has carried it out, and

s. 20(7A)(b)

is not required by subsection (7) to recommend that the document is adopted,

s. 20(7B)

Subsection (7C) applies where the person appointed to carry out the examination—

s. 20(7B)(a)

does not consider that, in all the circumstances, it would be reasonable to conclude that the document satisfies the requirements mentioned in subsection (5)(a) and is sound, but

s. 20(7B)(b)

does consider that, in all the circumstances, it would be reasonable to conclude that the local planning authority complied with any duty imposed on the authority by section 33A in relation to the document's preparation.

s. 20(7C)

If asked to do so by the local planning authority, the person appointed to carry out the examination must recommend modifications of the document that would make it one that—

s. 20(7C)(a)

satisfies the requirements mentioned in subsection (5)(a), and

s. 20(7C)(b)

is sound.

s. 20(8)

The local planning authority must publish the recommendations and the reasons.

s. 21 — Intervention by Secretary of State
s. 21(1)

If the Secretary of State thinks that a local development document is unsatisfactory—

s. 21(1)(a)

he may at any time before the document is adopted under section 23 direct the local planning authority to modify the document in accordance with the direction;

s. 21(1)(b)

if he gives such a direction he must state his reasons for doing so.

s. 21(2)

The authority—

s. 21(2)(a)

must comply with the direction;

s. 21(2)(b)

must not adopt the document unless the Secretary of State gives notice that he is satisfied that they have complied with the direction.

s. 21(3)

But subsection (2) does not apply if or to the extent that the Secretary of State withdraws the direction.

s. 21(4)

At any time before a development plan document is adopted by a local planning authority the Secretary of State may direct that the document (or any part of it) is submitted to him for his approval.

s. 21(5)

The following paragraphs apply if the Secretary of State gives a direction under subsection (4)—

s. 21(5)(a)

the authority must not take any step in connection with the adoption of the document until the Secretary of State gives his decision, or withdraws the direction;

s. 21(5)(b)

if the direction is given, and not withdrawn, before the authority have submitted the document under section 20(1), the Secretary of State must hold an independent examination;

s. 21(5)(c)

if the direction is given after the authority have submitted the document but before the person appointed to carry out the examination has made his recommendations, and is not withdrawn before those recommendations are made, the person must make his recommendations to the Secretary of State;

s. 21(5)(d)

the document has no effect unless the document or (as the case may be) the relevant part of it has been approved by the Secretary of State, or the direction is withdrawn.

s. 21(5A)

Subsections (4) to (7C) of section 20 apply to an examination held under subsection (5)(b), the reference to the local planning authority in subsection (7C) of that section being read as a reference to the Secretary of State.

s. 21(5B)

For the purposes of subsection (5)(d) the “relevant part” of a development plan document is the part that—

s. 21(5B)(a)

is covered by a direction under subsection (4) which refers to only part of the document, or

s. 21(5B)(b)

continues to be covered by a direction under subsection (4) following the partial withdrawal of the direction.

s. 21(6)

The Secretary of State must publish the recommendations made to him by virtue of subsection (5)(b) or (c) and the reasons of the person making the recommendations.

s. 21(7)

In considering a document or part of a document submitted under subsection (4) the Secretary of State may take account of any matter which he thinks is relevant.

s. 21(8)

It is immaterial whether any such matter was taken account of by the authority.

s. 21(9)

In relation to a document or part of a document submitted to him under subsection (4) the Secretary of State—

s. 21(9)(a)

may approve, approve subject to specified modifications or reject the document or part;

s. 21(9)(b)

must give reasons for his decision under paragraph (a).

s. 21(9A)

The Secretary of State may at any time—direct the local planning authority to withdraw the document.

s. 21(9A)(a)

after a development plan document has been submitted for independent examination under section 20, but

s. 21(9A)(b)

before it is adopted under section 23,

s. 21(10)

In the exercise of any function under this section the Secretary of State must have regard to the local development scheme.

s. 21(11)

The local planning authority must reimburse the Secretary of State for any expenditure incurred by the Secretary of State under this section that is specified in a notice given to the authority by the Secretary of State.

s. 21(12)

In the case of a joint local development document or a joint development plan document, the Secretary of State may apportion liability for the expenditure on such basis as the Secretary of State thinks just between the local planning authorities who have prepared the document.

s. 21A — Temporary direction pending possible use of intervention powers
s. 21A(1)

If the Secretary of State is considering whether to give a direction to a local planning authority under section 21 in relation to a development plan document or other local development document, he may direct the authority not to take any step in connection with the adoption of the document—

s. 21A(1)(a)

until the time (if any) specified in the direction, or

s. 21A(1)(b)

until the direction is withdrawn.

s. 21A(2)

A document to which a direction under this section relates has no effect while the direction is in force.

s. 21A(3)

A direction given under this section in relation to a document ceases to have effect if a direction is given under section 21 in relation to that document.

s. 22 — Withdrawal of local development documents
s. 22(1)

A local planning authority may at any time before a local development document is adopted under section 23 withdraw the document.

s. 22(2)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 23 — Adoption of local development documents
s. 23(1)

The local planning authority may adopt a local development document (other than a development plan document) either as originally prepared or as modified to take account of—

s. 23(1)(a)

any representations made in relation to the document;

s. 23(1)(b)

any other matter they think is relevant.

s. 23(2)

If the person appointed to carry out the independent examination of a development plan document recommends that it is adopted, the authority may adopt the document—

s. 23(2)(a)

as it is, or

s. 23(2)(b)

with modifications that (taken together) do not materially affect the policies set out in it.

s. 23(2A)

Subsection (3) applies if the person appointed to carry out the independent examination of a development plan document—

s. 23(2A)(a)

recommends non-adoption, and

s. 23(2A)(b)

under section 20(7C) recommends modifications (“the main modifications”).

s. 23(3)

The authority may adopt the document—

s. 23(3)(a)

with the main modifications, or

s. 23(3)(b)

with the main modifications and additional modifications if the additional modifications (taken together) do not materially affect the policies that would be set out in the document if it was adopted with the main modifications but no other modifications.

s. 23(4)

The authority must not adopt a development plan document unless they do so in accordance with subsection (2) or (3).

s. 23(5)

A document is adopted for the purposes of this section if it is adopted by resolution of the authority.

s. 24 — Conformity with regional strategy
s. 24(1)

The local development documents must be in general conformity with—

s. 24(1)(a)

the regional strategy(if the area of the local planning authority is in a region other than London);

s. 24(1)(b)

the spatial development strategy (if the local planning authority are a London borough or a Mayoral development corporation for an area in Greater London).

s. 24(2)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 24(3)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 24(4)

A local planning authority which are a London borough or a Mayoral development corporation for an area in Greater London—

s. 24(4)(a)

must request the opinion in writing of the Mayor of London as to the general conformity of a development plan document with the spatial development strategy;

s. 24(4)(b)

may request the opinion in writing of the Mayor as to the general conformity of any other local development document with the spatial development strategy.

s. 24(5)

Whether or not the local planning authority make a request mentioned in subsection (4), the Mayor may give an opinion as to the general conformity of a local development document with the spatial development strategy

s. 24(6)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 24(7)

If in the opinion of the Mayor a document is not in general conformity with the spatial development strategy the Mayor must be taken to have made representations seeking a change to the document.

s. 24(8)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 24(9)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 25 — Revocation of local development documents

The Secretary of State —

s. 25(a)

may at any time revoke a local development document at the request of the local planning authority;

s. 25(b)

may prescribe descriptions of local development document which may be revoked by the authority themselves.

s. 26 — Revision of local development documents
s. 26(1)

The local planning authority may at any time prepare a revision of a local development document.

s. 26(2)

The authority must prepare a revision of a local development document—

s. 26(2)(a)

if the Secretary of State directs them to do so, and

s. 26(2)(b)

in accordance with such timetable as he directs.

s. 26(3)

This Part applies to the revision of a local development document as it applies to the preparation of the document.

s. 26(4)

Subsection (5) applies if any part of the area of the local planning authority is an area to which an enterprise zone scheme relates.

s. 26(5)

As soon as practicable after the occurrence of a relevant event—

s. 26(5)(a)

the authority must review every local development document in the light of the enterprise zone scheme;

s. 26(5)(b)

if they think that any modifications of the document are required in consequence of the scheme they must prepare a revised document containing the modifications.

s. 26(6)

The following are relevant events—

s. 26(6)(a)

the making of an order under paragraph 5 of Schedule 32 to the Local Government, Planning and Land Act 1980 (c. 65) (designation of enterprise zone);

s. 26(6)(b)

the giving of notification under paragraph 11(1) of that Schedule (approval of modification of enterprise zone scheme).

s. 26(7)

References to an enterprise zone and an enterprise zone scheme must be construed in accordance with that Act.

s. 27 — Secretary of State’s default powers
s. 27(1)

This section applies if the Secretary of State thinks that a local planning authority are failing or omitting to do anything it is necessary for them to do in connection with the preparation, revision or adoption of a development plan document.

s. 27(2)

The Secretary of State may—

s. 27(2)(a)

prepare or revise (as the case may be) the document, or

s. 27(2)(b)

give directions to the authority in relation to the preparation or revision of the document.

s. 27(3)

The Secretary of State must either—

s. 27(3)(a)

hold an independent examination, or

s. 27(3)(b)

direct the authority to submit the document for independent examination.

s. 27(4)

The Secretary of State must either—

s. 27(4)(a)

publish the recommendations and reasons of the person appointed to hold the examination, or

s. 27(4)(b)

give directions to the authority in relation to publication of those recommendations and reasons.

s. 27(5)

The Secretary of State may—

s. 27(5)(a)

approve the document, or approve it subject to specified modifications, as a local development document,

s. 27(5)(b)

direct the authority to consider adopting the document by resolution of the authority as a local development document, or

s. 27(5)(c)

(except where it was prepared or revised by the Secretary of State under subsection (2)(a)) reject the document.

s. 27(6)

Subsections (4) to (7C) of section 20 apply (subject to subsection (7) below) to an examination held under subsection (3)(a), the reference to the local planning authority in subsection (7C) of that section being read as a reference to the Secretary of State.

s. 27(7)

Subsections (5)(c), (7)(b)(ii) and (7B)(b) of section 20 do not apply to an independent examination held—in respect of a document prepared or revised by the Secretary of State under subsection (2)(a).

s. 27(7)(a)

under subsection (3)(a), or

s. 27(7)(b)

in response to a direction under subsection (3)(b),

s. 27(8)

The Secretary of State must give reasons for anything he does in pursuance of subsection (2) or (5).

s. 27(9)

The authority must reimburse the Secretary of State for any expenditure he incurs in connection with anything—

s. 27(9)(a)

which is done by him under subsection (2)(a), and

s. 27(9)(b)

which the authority failed or omitted to do as mentioned in subsection (1).

s. 27(10)

In the case of a joint local development document or a joint development plan document, the Secretary of State may apportion liability for the expenditure on such basis as the Secretary of State thinks just between the local planning authorities for whom the document has been prepared.

s. 27A — Default powers exercisable by Mayor of London, combined authority , combined county authority or county council

Schedule A1 (default powers exercisable by Mayor of London, combined authority, combined county authority or county council) has effect.

s. 28 — Joint local development documents
s. 28(1)

Two or more local planning authorities may agree to prepare one or more joint local development documents.

s. 28(2)

This Part applies for the purposes of any step which may be or is required to be taken in relation to a joint local development document as it applies for the purposes of any step which may be or is required to be taken in relation to a local development document.

s. 28(3)

For the purposes of subsection (2) anything which must be done by or in relation to a local planning authority in connection with a local development document must be done by or in relation to each of the authorities mentioned in subsection (1) in connection with a joint local development document.

s. 28(4)

Any requirement of this Part in relation to regional strategy is a requirement in relation to regional strategy for the region in which each authority mentioned in subsection (1) is situated.

s. 28(5)

If the authorities mentioned in subsection (1) include one or more London boroughs the requirements of this Part in relation to the spatial development strategy also apply.

s. 28(6)

Subsections (7) to (9) apply if a local planning authority withdraw from an agreement mentioned in subsection (1).

s. 28(7)

Any step taken in relation to the document must be treated as a step taken by—

s. 28(7)(a)

an authority which were a party to the agreement for the purposes of any corresponding document prepared by them;

s. 28(7)(b)

two or more other authorities who were parties to the agreement for the purposes of any corresponding joint local development document.

s. 28(8)

Any independent examination of a local development document to which the agreement relates must be suspended.

s. 28(9)

If before the end of the period prescribed for the purposes of this subsection an authority which were a party to the agreement request the Secretary of State to do so he may direct that—

s. 28(9)(a)

the examination is resumed in relation to—

s. 28(9)(a)(i)

any corresponding document prepared by an authority which were a party to the agreement, or

s. 28(9)(a)(ii)

any corresponding joint local development document prepared by two or more other authorities which were parties to the agreement;

s. 28(9)(b)

any step taken for the purposes of the suspended examination has effect for the purposes of the resumed examination.

s. 28(10)

A joint local development document is a local development document prepared jointly by two or more local planning authorities.

s. 28(11)

The Secretary of State may by regulations make provision as to what is a corresponding document or a corresponding joint local development document for the purposes of this section.

s. 28A — Power to direct preparation of joint development plan documents
s. 28A(1)

The Secretary of State may direct two or more local planning authorities to prepare a joint development plan document.

s. 28A(2)

The Secretary of State may give a direction under this section in relation to a document whether or not it is specified in the local development schemes of the local planning authorities in question as a document which is to be prepared jointly with one or more other local planning authorities.

s. 28A(3)

The Secretary of State may give a direction under this section only if the Secretary of State considers that to do so will facilitate the more effective planning of the development and use of land in the area of one or more of the local planning authorities in question.

s. 28A(4)

A direction under this section may specify—

s. 28A(4)(a)

the area to be covered by the joint development plan document to which the direction relates;

s. 28A(4)(b)

the matters to be covered by that document;

s. 28A(4)(c)

the timetable for preparation of that document.

s. 28A(5)

The Secretary of State must, when giving a direction under this section, notify the local planning authorities to which it applies of the reasons for giving it.

s. 28A(6)

If the Secretary of State gives a direction under this section, the Secretary of State may direct the local planning authorities to which it is given to amend their local development schemes so that they cover the joint development plan document to which it relates.

s. 28A(7)

A joint development plan document is a development plan document which is, or is required to be, prepared jointly by two or more local planning authorities pursuant to a direction under this section.

s. 28B — Application of Part to joint development plan documents
s. 28B(1)

This Part applies for the purposes of any step which may be or is required to be taken in relation to a joint development plan document as it applies for the purposes of any step which may be or is required to be taken in relation to a development plan document.

s. 28B(2)

For the purposes of subsection (1) anything which must be done by or in relation to a local planning authority in connection with a development plan document must be done by or in relation to each of the authorities mentioned in section 28A(1) in connection with a joint development plan document.

s. 28B(3)

If the authorities mentioned in section 28A(1) include a London borough council or a Mayoral development corporation, the requirements of this Part in relation to the spatial development strategy also apply.

s. 28B(4)

Those requirements also apply if—

s. 28B(4)(a)

a combined authority established under section 103 of the Local Democracy, Economic Development and Construction Act 2009 has the function of preparing the spatial development strategy for the combined authority's area, and

s. 28B(4)(b)

the authorities mentioned in section 28A(1) include a local planning authority whose area is within, or is the same as, the area of the combined authority.

s. 28C — Modification or withdrawal of direction under section 28A
s. 28C(1)

The Secretary of State may modify or withdraw a direction under section 28A by notice in writing to the authorities to which it was given.

s. 28C(2)

The Secretary of State must, when modifying or withdrawing a direction under section 28A, notify the local planning authorities to which it was given of the reasons for the modification or withdrawal.

s. 28C(3)

The following provisions of this section apply if—

s. 28C(3)(a)

the Secretary of State withdraws a direction under section 28A, or

s. 28C(3)(b)

the Secretary of State modifies a direction under that section so that it ceases to apply to one or more of the local planning authorities to which it was given.

s. 28C(4)

Any step taken in relation to the joint development plan document to which the direction related is to be treated as a step taken by—

s. 28C(4)(a)

a local planning authority to which the direction applied for the purposes of any corresponding document prepared by them, or

s. 28C(4)(b)

two or more local planning authorities to which the direction applied for the purposes of any corresponding joint development plan document prepared by them.

s. 28C(5)

Any independent examination of a joint development plan document to which the direction related must be suspended.

s. 28C(6)

If before the end of the period prescribed for the purposes of this subsection a local planning authority to which the direction applied request the Secretary of State to do so, the Secretary of State may direct that—

s. 28C(6)(a)

the examination is resumed in relation to—

s. 28C(6)(a)(i)

any corresponding document prepared by a local planning authority to which the direction applied, or

s. 28C(6)(a)(ii)

any corresponding joint development plan document prepared by two or more local planning authorities to which the direction applied, and

s. 28C(6)(b)

any step taken for the purposes of the suspended examination has effect for the purposes of the resumed examination.

s. 28C(7)

The Secretary of State may by regulations make provision as to what is a corresponding document or a corresponding joint development plan document for the purposes of this section.

Joint committees

s. 29 — Joint committees
s. 29(1)

This section applies if one or more local planning authorities agree with one or more county councils in relation to any area of such a council for which there is also a district council to establish a joint committee to be, for the purposes of this Part, the local planning authority—

s. 29(1)(a)

for the area specified in the agreement;

s. 29(1)(b)

in respect of such matters as are so specified.

s. 29(2)

The Secretary of State may by order constitute a joint committee to be the local planning authority—

s. 29(2)(a)

for the area;

s. 29(2)(b)

in respect of those matters.

s. 29(3)

Such an order—

s. 29(3)(a)

must specify the authority or authorities and county council or councils (the constituent authorities) which are to constitute the joint committee;

s. 29(3)(b)

may make provision as to such other matters as the Secretary of State thinks are necessary or expedient to facilitate the exercise by the joint committee of its functions.

s. 29(4)

Provision under subsection (3)(b)—

s. 29(4)(a)

may include provision corresponding to provisions relating to joint committees in Part 6 of the Local Government Act 1972 (c. 70);

s. 29(4)(b)

may apply (with or without modifications) such enactments relating to local authorities as the Secretary of State thinks appropriate.

s. 29(5)

If an order under this section is annulled in pursuance of a resolution of either House of Parliament—

s. 29(5)(a)

with effect from the date of the resolution the joint committee ceases to be the local planning authority as mentioned in subsection (2);

s. 29(5)(b)

anything which the joint committee (as the local planning authority) was required to do for the purposes of this Part must be done for their area by each local planning authority which were a constituent authority of the joint committee;

s. 29(5)(c)

each of those local planning authorities must revise their local development scheme accordingly.

s. 29(6)

Nothing in this section or section 30 confers on a local planning authority constituted by virtue of an order under this section any function in relation to section 13 or 14.

s. 29(7)

The policies adopted by the joint committee in the exercise of its functions under this Part must be taken for the purposes of the planning Acts to be the policies of each of the constituent authorities which are a local planning authority.

s. 29(8)

Subsection (9) applies to any function—

s. 29(8)(a)

which is conferred on a local planning authority (within the meaning of the principal Act) under or by virtue of the planning Acts, and

s. 29(8)(b)

which relates to the authority’s local development scheme or local development documents.

s. 29(9)

If the authority is a constituent authority of a joint committee references to the authority’s local development scheme or local development documents must be construed as including references to the scheme or documents of the joint committee.

s. 29(10)

For the purposes of subsection (4) a local authority is any of the following—

s. 29(10)(a)

a county council;

s. 29(10)(b)

a district council;

s. 29(10)(c)

a London borough council.

s. 30 — Joint committees: additional functions
s. 30(1)

This section applies if the constituent authorities to a joint committee agree that the joint committee is to be, for the purposes of this Part, the local planning authority for any area or matter which is not the subject of—

s. 30(1)(a)

an order under section 29, or

s. 30(1)(b)

an earlier agreement under this section.

s. 30(2)

Each of the constituent authorities and the joint committee must revise their local development scheme in accordance with the agreement.

s. 30(3)

With effect from the date when the last such revision takes effect the joint committee is, for the purposes of this Part, the local planning authority for the area or matter mentioned in subsection (1).

s. 31 — Dissolution of joint committee
s. 31(1)

This section applies if a constituent authority requests the Secretary of State to revoke an order constituting a joint committee as the local planning authority for any area or in respect of any matter.

s. 31(2)

The Secretary of State may revoke the order.

s. 31(3)

Any step taken by the joint committee in relation to a local development scheme or a local development document must be treated for the purposes of any corresponding scheme or document as a step taken by a successor authority.

s. 31(4)

A successor authority is—

s. 31(4)(a)

a local planning authority which were a constituent authority of the joint committee;

s. 31(4)(b)

a joint committee constituted by order under section 29 for an area which does not include an area which was not part of the area of the joint committee mentioned in subsection (1).

s. 31(5)

If the revocation takes effect at any time when an independent examination is being carried out in relation to a local development document the examination must be suspended.

s. 31(6)

But if before the end of the period prescribed for the purposes of this subsection a successor authority falling within subsection (4)(a) requests the Secretary of State to do so he may direct that—

s. 31(6)(a)

the examination is resumed in relation to the corresponding document;

s. 31(6)(b)

any step taken for the purposes of the suspended examination has effect for the purposes of the resumed examination.

s. 31(7)

The Secretary of State may by regulations make provision as to what is a corresponding scheme or document.

Miscellaneous

s. 32 — Exclusion of certain representations
s. 32(1)

This section applies to any representation or objection in respect of anything which is done or is proposed to be done in pursuance of—

s. 32(1)(a)

an order or scheme under section 10, 14, 16, 18, 106(1) or (3) or 108(1) of the Highways Act 1980 (c. 66);

s. 32(1)(b)

an order or scheme under section 7, 9, 11, 13 or 20 of the Highways Act 1959 (c. 25), section 3 of the Highways (Miscellaneous Provisions) Act 1961 (c. 63) or section 1 or 10 of the Highways Act 1971 (c. 41) (which provisions were replaced by the provisions mentioned in paragraph (a));

s. 32(1)(c)

an order under section 1 of the New Towns Act 1981 (c. 64).

s. 32(2)

If the Secretary of State or a local planning authority thinks that a representation made in relation to a local development document is in substance a representation or objection to which this section applies he or they (as the case may be) may disregard it.

s. 33 — Urban development corporations

The Secretary of State may direct that the provisions of—do not apply to the area of an urban development corporation.

s. 33(a)

this Part, or

s. 33(b)

any particular regulations made under section 14A,

s. 33A — Duty to co-operate in relation to planning of sustainable development
s. 33A(1)

Each person who is—must co-operate with every other person who is within paragraph (a), (b) or (c) or subsection (9) in maximising the effectiveness with which activities within subsection (3) are undertaken.

s. 33A(1)(a)

a local planning authority,

s. 33A(1)(b)

a county council in England that is not a local planning authority, or

s. 33A(1)(c)

a body, or other person, that is prescribed or of a prescribed description,

s. 33A(2)

In particular, the duty imposed on a person by subsection (1) requires the person—

s. 33A(2)(a)

to engage constructively, actively and on an ongoing basis in any process by means of which activities within subsection (3) are undertaken, and

s. 33A(2)(b)

to have regard to activities of a person within subsection (9) so far as they are relevant to activities within subsection (3).

s. 33A(3)

The activities within this subsection are—so far as relating to a strategic matter.

s. 33A(3)(a)

the preparation of development plan documents,

s. 33A(3)(b)

the preparation of other local development documents,

s. 33A(3)(c)

the preparation of marine plans under the Marine and Coastal Access Act 2009 for the English inshore region, the English offshore region or any part of either of those regions,

s. 33A(3)(d)

activities that can reasonably be considered to prepare the way for activities within any of paragraphs (a) to (c) that are, or could be, contemplated, and

s. 33A(3)(e)

activities that support activities within any of paragraphs (a) to (c),

s. 33A(4)

For the purposes of subsection (3), each of the following is a “strategic matter”—

s. 33A(4)(a)

sustainable development or use of land that has or would have a significant impact on at least two planning areas, including (in particular) sustainable development or use of land for or in connection with infrastructure that is strategic and has or would have a significant impact on at least two planning areas, and

s. 33A(4)(b)

sustainable development or use of land in a two-tier area if the development or use—

s. 33A(4)(b)(i)

is a county matter, or

s. 33A(4)(b)(ii)

has or would have a significant impact on a county matter.

s. 33A(5)

In subsection (4)—“county matter” has the meaning given by paragraph 1 of Schedule 1 to the principal Act (ignoring sub-paragraph 1(1)(i)),“planning area” means—the area of—a district council (including a metropolitan district council), a London borough council, or a county council in England for an area for which there is no district council, but only so far as that area is neither in a National Park nor in the Broads, a National Park, the Broads, the English inshore region, or the English offshore region, and“two-tier area” means an area—for which there is a county council and a district council, but which is not in a National Park.

s. 33A(6)

The engagement required of a person by subsection (2)(a) includes, in particular—

s. 33A(6)(a)

considering whether to consult on and prepare, and enter into and publish, agreements on joint approaches to the undertaking of activities within subsection (3), and

s. 33A(6)(b)

if the person is a local planning authority, considering whether to agree under section 28 to prepare joint local development documents.

s. 33A(7)

A person subject to the duty under subsection (1) must have regard to any guidance given by the Secretary of State about how the duty is to be complied with.

s. 33A(8)

A person, or description of persons, may be prescribed for the purposes of subsection (1)(c) only if the person, or persons of that description, exercise functions for the purposes of an enactment.

s. 33A(9)

A person is within this subsection if the person is a body, or other person, that is prescribed or of a prescribed description.

s. 33A(10)

In this section—“the English inshore region” and “the English offshore region” have the same meaning as in the Marine and Coastal Access Act 2009, and“land” includes the waters within those regions and the bed and subsoil of those waters.

s. 34 — Guidance
s. 34(1)

In the exercise of any function conferred under or by virtue of this Part the local planning authority must have regard to any guidance issued by the Secretary of State.

s. 34(2)

The Secretary of State must issue guidance for local planning authorities on how their local development documents (taken as a whole) should address housing needs that result from old age or disability.

s. 35 — Authorities monitoring reports
s. 35(1)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 35(2)

Every local planning authority must prepare reports containing such information as is prescribed as to—

s. 35(2)(a)

the implementation of the local development scheme;

s. 35(2)(b)

the extent to which the policies set out in the local development documents are being achieved.

s. 35(3)

A report under subsection (2) must—

s. 35(3)(a)

be in respect of a period—

s. 35(3)(a)(i)

which the authority considers appropriate in the interests of transparency,

s. 35(3)(a)(ii)

which begins with the end of the period covered by the authority's most recent report under subsection (2), and

s. 35(3)(a)(iii)

which is not longer than 12 months or such shorter period as is prescribed;

s. 35(3)(c)

be in such form as is prescribed;

s. 35(3)(d)

contain such other matter as is prescribed.

s. 35(3A)

Subsection (3B) applies if a London borough council or a Mayoral development corporation have determined in accordance with section 19(1D) that—

s. 35(3A)(a)

policies to address the strategic priorities for the development and use of land in their area are set out in the spatial development strategy, and

s. 35(3A)(b)

accordingly, such policies will not to that extent be set out in their development plan documents.

s. 35(3B)

Each report by the council or corporation under subsection (2) must—

s. 35(3B)(a)

indicate that such policies are set out in the spatial development strategy, and

s. 35(3B)(b)

specify where in the strategy those policies are set out.

s. 35(3C)

If a combined authority established under section 103 of the Local Democracy, Economic Development and Construction Act 2009 has the function of preparing the spatial development strategy for the authority’s area, subsections (3A) and (3B) also apply in relation to—

s. 35(3C)(a)

a local planning authority whose area is within, or the same as, the area of the combined authority, and

s. 35(3C)(b)

the spatial development strategy published by the combined authority.

s. 35(4)

The authority must make the authority's reports under this section available to the public.

General

s. 36 — Regulations and standards
s. 36(1)

The Secretary of State may by regulations make provision in connection with the exercise by any person of functions under this Part.

s. 36(2)

The regulations may in particular make provision as to—

s. 36(2)(a)

the procedure to be followed by the local planning authority in carrying out the appraisal under section 19;

s. 36(2)(b)

the procedure to be followed in the preparation of local development documents;

s. 36(2)(c)

requirements about the giving of notice and publicity;

s. 36(2)(d)

requirements about inspection by the public of a local development document or any other document;

s. 36(2)(e)

the nature and extent of consultation with and participation by the public in anything done under this Part;

s. 36(2)(f)

the making of representations about any matter to be included in a local development document;

s. 36(2)(g)

consideration of any such representations;

s. 36(2)(h)

the remuneration and allowances payable to a person appointed to carry out an independent examination under section 20;

s. 36(2)(i)

the determination of the time at which anything must be done for the purposes of this Part;

s. 36(2)(j)

the manner of publication of any draft, report or other document published under this Part;

s. 36(2)(k)

monitoring the exercise by local planning authorities of their functions under this Part;

s. 36(2)(l)

the making of reasonable charges for the provision of copies of documents required by or under this Part.

s. 36(3)

The Secretary of State may from time to time publish data standards for—

s. 36(3)(a)

local development schemes,

s. 36(3)(b)

local development documents, or

s. 36(3)(c)

local development documents of a particular kind.

s. 36(4)

For this purpose a “data standard” is a written standard which contains technical specifications for a scheme or document or the data contained in a scheme or document.

s. 36(5)

A local planning authority must comply with the data standards published under subsection (3) in preparing, publishing, maintaining or revising a scheme or document to which the standards apply.

s. 37 — Interpretation
s. 37(1)

Local development scheme must be construed in accordance with section 15.

s. 37(2)

Local development document must be construed in accordance with sections 17 and 18(3).

s. 37(3)

A development plan document is a local development document which is specified as a development plan document in the local development scheme.

s. 37(4)

Local planning authorities are—

s. 37(4)(a)

district councils;

s. 37(4)(b)

London borough councils;

s. 37(4)(c)

metropolitan district councils;

s. 37(4)(d)

county councils in relation to any area in England for which there is no district council;

s. 37(4)(e)

the Broads Authority.

s. 37(5)

A National Park authority is the local planning authority for the whole of its area and subsection (4) must be construed subject to that.

s. 37(5ZA)

Subsection (4) must also be construed subject to any order under section 198(2) of the Localism Act 2011 so far as providing that a Mayoral development corporation is, as regards an area, to be the local planning authority for some or all of the purposes of this Part in relation to some or all kinds of development.

s. 37(5ZB)

Where such an order makes such provision, that MDC is, in relation to the kinds of development concerned, the local planning authority for the area and purposes concerned in place of any authority who, in relation to those kinds of development, would otherwise be the local planning authority for that area and those purposes.

s. 37(5A)

Subsection (4) must additionally be construed, and subsection (5ZB) must be construed, subject to any designation order under section 13 of the Housing and Regeneration Act 2008 (power to make designation orders) providing that the Homes and Communities Agency is to be the local planning authority—

s. 37(5A)(a)

for an area specified in the order, and

s. 37(5A)(b)

for all purposes of this Part or any such purposes so specified.

s. 37(5B)

Where such an order makes such provision, the Homes and Communities Agency is the local planning authority for the area and the purposes concerned in place of any authority who would otherwise be the local planning authority for that area and those purposes.

s. 37(5C)

Joint local development document must be construed in accordance with section 28(10).

s. 37(5D)

Joint development plan document must be construed in accordance with section 28A(7).

s. 37(6)

Regional strategy” means a regional strategy under Part 5 of the Local Democracy, Economic Development and Construction Act 2009.

s. 37(6A)

“Responsible regional authorities” is to be construed in accordance with Part 5 of the Local Democracy, Economic Development and Construction Act 2009.

s. 37(7)

This section applies for the purposes of this Part.

Part 3

Development

Development plan

s. 38 — Development plan
s. 38(1)

A reference to the development plan in any enactment mentioned in subsection (7) must be construed in accordance with subsections (2A) to (5).

s. 38(2A)

For the purposes of any area in England the development plan is—

s. 38(2A)(a)

each spatial development strategy that is operative in relation to that area,

s. 38(2A)(b)

each local plan which has effect in relation to that area,

s. 38(2A)(c)

each minerals and waste plan which has effect in relation to that area,

s. 38(2A)(d)

each supplementary plan which has effect in relation to that area,

s. 38(2A)(e)

each neighbourhood development plan which has been made in relation to that area, and

s. 38(2A)(f)

each policies map for that area.

s. 38(3A)

For the purposes of any area in England (but subject to subsection (3B)) a neighbourhood development plan which relates to that area also forms part of the development plan for that area if—

s. 38(3A)(a)

section 38A(4)(a) (approval by referendum) applies in relation to the neighbourhood development plan, but

s. 38(3A)(b)

the local planning authority to whom the proposal for the making of the plan has been made have not made the plan.

s. 38(3B)

The neighbourhood development plan ceases to form part of the development plan if the local planning authority decide under section 38A(6) not to make the plan.

s. 38(4)

For the purposes of any area in Wales the development plan is —.

s. 38(4)(a)

the National Development Framework for Wales,

s. 38(4)(b)

any strategic development plan for an area that includes all or part of that area, and

s. 38(4)(c)

the local development plan for that area.

s. 38(5)

If to any extent a policy contained in a development plan for an area conflicts with another policy in the development plan the conflict must be resolved in favour of the policy which is contained in the last document to become part of the development plan.

s. 38(6)

If regard is to be had to the development plan for the purpose of any determination to be made under the planning Acts the determination must be made in accordance with the plan unless material considerations indicate otherwise.

s. 38(7)

The enactments mentioned in subsection (1) are—

s. 38(7)(a)

this Act;

s. 38(7)(b)

the planning Acts;

s. 38(7)(c)

any other enactment relating to town and country planning;

s. 38(7)(d)

the Land Compensation Act 1961 (c. 33);

s. 38(7)(e)

the Highways Act 1980 (c. 66).

s. 38(8)

In subsection (5) references to a development plan include a development plan for the purposes of paragraph 1 of Schedule 8.

s. 38(9A)

In subsection (2A)—

s. 38(9A)(a)

“spatial development strategy”, “local plan”, “minerals and waste plan” and “supplementary plan” have the same meaning as in Part 2 (see, in particular, section 15LH), and

s. 38(9A)(b)

policies map must be construed in accordance with section 15LD.

s. 38(10)

Neighbourhood development plan must be construed in accordance with section 38A.

s. 38ZA — Meaning of “national development management policy”
s. 38ZA(1)

A “national development management policy” is a policy (however expressed) of the Secretary of State in relation to the development or use of land in England, or any part of England, which the Secretary of State by direction designates as a national development management policy.

s. 38ZA(2)

The Secretary of State may—

s. 38ZA(2)(a)

revoke a direction under subsection (1);

s. 38ZA(2)(b)

modify a national development management policy.

s. 38ZA(3)

The Secretary of State must have regard to the need to mitigate, and adapt to, climate change—

s. 38ZA(3)(a)

in preparing a policy which is to be designated as a national development management policy, or

s. 38ZA(3)(b)

in modifying a national development management policy.

s. 38ZA(4)

Before making or revoking a direction under subsection (1), or modifying a national development management policy, the Secretary of State must ensure that such consultation with, and participation by, the public or any bodies or persons as the Secretary of State thinks appropriate takes place.

s. 38ZA(5)

The only cases in which no consultation or participation need take place under subsection (4) are those where the Secretary of State thinks that none is appropriate because—

s. 38ZA(5)(a)

a proposed modification of a national development management policy does not materially affect the policy or only corrects an obvious error or omission, or

s. 38ZA(5)(b)

it is necessary, or expedient, for the Secretary of State to act urgently.

s. 38A — Meaning of “neighbourhood development plan”
s. 38A(1)

Any qualifying body is entitled to initiate a process for the purpose of requiring a local planning authority in England to make a neighbourhood development plan.

s. 38A(2)

A “neighbourhood development plan” is a plan which sets out policies (however expressed) in relation to the development and use of land in the whole or any part of a particular neighbourhood area specified in the plan.

s. 38A(3)

Schedule 4B to the principal Act, which makes provision about the process for the making of neighbourhood development orders, including—is to apply in relation to neighbourhood development plans (subject to the modifications set out in section 38C(5) of this Act).

s. 38A(3)(a)

provision for independent examination of orders proposed by qualifying bodies, and

s. 38A(3)(b)

provision for the holding of referendums on orders proposed by those bodies,

s. 38A(4)

A local planning authority to whom a proposal for the making of a neighbourhood development plan has been made—

s. 38A(4)(a)

must make a neighbourhood development plan to which the proposal relates if in each applicable referendum under that Schedule (as so applied) more than half of those voting have voted in favour of the plan, and

s. 38A(4)(b)

if paragraph (a) applies, must make the plan as soon as reasonably practicable after the referendum is held and, in any event, by such date as may be prescribed.

s. 38A(5)

If—the authority may (but need not) make a neighbourhood development plan to which the proposal relates.

s. 38A(5)(a)

there are two applicable referendums under that Schedule as so applied (because the plan relates to a neighbourhood area designated as a business area under section 61H of the principal Act), and

s. 38A(5)(b)

in one of those referendums (but not the other) more than half of those voting have voted in favour of the plan,

s. 38A(6)

The authority are not to be subject to the duty under subsection (4)(a) if they consider that the making of the plan would breach, or would otherwise be incompatible with, any assimilated obligation or any of the Convention rights (within the meaning of the Human Rights Act 1998).

s. 38A(7)

Regulations made by the Secretary of State may make provision as to the procedure to be followed by local planning authorities in cases where they act under subsection (6).

s. 38A(8)

The regulations may in particular make provision—

s. 38A(8)(a)

for the holding of an examination,

s. 38A(8)(b)

as to the payment by a local planning authority of remuneration and expenses of the examiner,

s. 38A(8)(c)

as to the award of costs by the examiner,

s. 38A(8)(d)

as to the giving of notice and publicity,

s. 38A(8)(e)

as to the information and documents that are to be made available to the public,

s. 38A(8)(f)

as to the making of reasonable charges for anything provided as a result of the regulations,

s. 38A(8)(g)

as to consultation with and participation by the public, and

s. 38A(8)(h)

as to the making and consideration of representations (including the time by which representations must be made).

s. 38A(9)

The authority must publish in such manner as may be prescribed—

s. 38A(9)(a)

their decision to act under subsection (4) or (6),

s. 38A(9)(b)

their reasons for making that decision, and

s. 38A(9)(c)

such other matters relating to that decision as may be prescribed.

s. 38A(10)

The authority must send a copy of the matters required to be published to—

s. 38A(10)(a)

the qualifying body that initiated the process for the making of the plan, and

s. 38A(10)(b)

such other persons as may be prescribed.

s. 38A(11)

If a neighbourhood development plan is in force in relation to a neighbourhood area—

s. 38A(11)(a)

a qualifying body may make a proposal for the existing plan to be replaced by a new one, and

s. 38A(11)(b)

the process for the making of the replacement plan is the same as the process for the making of the existing plan.

s. 38A(11A)

Subsection (11) is subject to Schedule A2, which makes provision for the modification of a neighbourhood development plan.

s. 38A(11B)

Subsection (11C) applies if, as a result of a modification of a neighbourhood area under section 61G(6) of the principal Act, a neighbourhood development plan relates to more than one neighbourhood area.

s. 38A(11C)

The replacement of the plan by a new plan in relation to one or some of those areas does not affect the continuation in force of the plan in relation to the other area or areas.

s. 38A(12)

For the purposes of this section and section 38B—“local planning authority” has the same meaning as it has in Part 2 (see section 15LF),“neighbourhood area” has the meaning given by sections 61G and 61I(1) of the principal Act,“prescribed” means prescribed by regulations made by the Secretary of State, and“qualifying body” means a parish council, or an organisation or body designated as a neighbourhood forum, authorised for the purposes of a neighbourhood development plan to act in relation to a neighbourhood area as a result of section 61F of the principal Act, as applied by section 38C of this Act.

s. 38B — Provision that may be made by neighbourhood development plans
s. 38B(A1)

A neighbourhood development plan may include—

s. 38B(A1)(a)

policies (however expressed) in relation to the amount, type and location of, and timetable for, development in the neighbourhood area in the period for which the plan has effect;

s. 38B(A1)(b)

other policies (however expressed) in relation to the use or development of land in the neighbourhood area which are designed to achieve objectives that relate to the particular characteristics or circumstances of that area, any part of that area or one or more specific sites in that area;

s. 38B(A1)(c)

details of any infrastructure requirements, or requirements for affordable housing, to which development in accordance with the policies, included in the plan under paragraph (a) or (b), would give rise;

s. 38B(A1)(d)

requirements with respect to design that relate to development, or development of a particular description, throughout the neighbourhood area, in any part of that area or at one or more specific sites in that area, which the qualifying body considers should be met for planning permission for the development to be granted.

s. 38B(1)

A neighbourhood development plan—

s. 38B(1)(a)

must specify the period for which it is to have effect,

s. 38B(1)(b)

may not include provision about development that is excluded development, and

s. 38B(1)(c)

may not relate to more than one neighbourhood area.

s. 38B(2)

Only one neighbourhood development plan may be made for each neighbourhood area.

s. 38B(2A)

Subsections (1)(c) and (2) are subject to section 61G(6D) of the principal Act (as applied by section 38C(5A) of this Act).

s. 38B(2B)

So far as the qualifying body considers appropriate, having regard to the subject matter of the neighbourhood development plan, the plan must—

s. 38B(2B)(a)

be designed to secure that the development and use of land in the neighbourhood area contribute to the mitigation of, and adaptation to, climate change, and

s. 38B(2B)(b)

take account of any local nature recovery strategy, under section 104 of the Environment Act 2021, that relates to all or part of the neighbourhood area, including in particular—

s. 38B(2B)(b)(i)

the areas identified in the strategy as areas which—

s. 38B(2B)(b)(i)(A)

are, or could become, of particular importance for biodiversity, or

s. 38B(2B)(b)(i)(B)

are areas where the recovery or enhancement of biodiversity could make a particular contribution to other environmental benefits,

s. 38B(2B)(b)(ii)

the priorities set out in the strategy for recovering or enhancing biodiversity, and

s. 38B(2B)(b)(iii)

the proposals set out in the strategy as to potential measures relating to those priorities.

s. 38B(2C)

The neighbourhood development plan must not—

s. 38B(2C)(a)

include anything that is not permitted or required by or under subsections (A1) to (2A) or regulations under subsection (4), or

s. 38B(2C)(b)

be inconsistent with or (in substance) repeat any national development management policy.

s. 38B(3)

If to any extent a policy set out in a neighbourhood development plan conflicts with any other statement or information in the plan, the conflict must be resolved in favour of the policy.

s. 38B(4)

Regulations made by the Secretary of State may make provision—

s. 38B(4)(a)

restricting the provision that may be included in neighbourhood development plans about the use of land,

s. 38B(4)(b)

requiring or permitting neighbourhood development plans to include such matters as are prescribed in the regulations, and

s. 38B(4)(c)

prescribing the form of neighbourhood development plans.

s. 38B(5)

A local planning authority must publish each neighbourhood development plan that they make in such manner as may be prescribed by regulations made by the Secretary of State.

s. 38B(6)

Section 61K of the principal Act (meaning of “excluded development”) is to apply for the purposes of subsection (1)(b).

s. 38C — Supplementary provisions
s. 38C(1)

The following provisions of the principal Act are to apply in relation to neighbourhood development plans.

s. 38C(2)

The provisions to be applied are—

s. 38C(2)(a)

section 61F (authorisation to act in relation to neighbourhood areas),

s. 38C(2)(b)

section 61I(2) and (3) (neighbourhood areas in areas of two or more local planning authorities),

s. 38C(2)(c)

section 61M (revocation or modification of neighbourhood development orders),

s. 38C(2)(d)

section 61N (legal challenges),

s. 38C(2)(e)

section 61O (guidance), and

s. 38C(2)(f)

section 61P (provision as to the making of certain decisions by local planning authorities).

s. 38C(2A)

Section 61F of the principal Act is to apply in accordance with subsection (2) of this section as if—

s. 38C(2A)(a)

subsections (8)(a) and (8B) also referred to a proposal for the modification of a neighbourhood development plan,

s. 38C(2A)(b)

subsection (13)(b) also referred to a proposal for the modification of a neighbourhood development plan made by a neighbourhood forum, and

s. 38C(2A)(c)

subsection (13)(c) also referred to any duty of a local planning authority under paragraph 7, 8 or 9 of Schedule A2 to this Act.

s. 38C(3)

Section 61M of the principal Act is to apply in accordance with subsection (2) of this section as if

s. 38C(3)(a)

the words “by order” (wherever occurring) were omitted, and

s. 38C(3)(b)

the reference in subsection (4A) to a modification materially affecting any planning permission granted by the order were to a modification materially affecting the policies in the plan.

s. 38C(4)

Section 61N(1) of the principal Act is to apply in accordance with subsection (2) of this section as if the reference to section 61E(4) or (8) of that Act were a reference to section 38A(4) or (6) of this Act.

s. 38C(5)

Schedule 4B to the principal Act is to apply in accordance with 38A(3) of this Act with the following modifications—

s. 38C(5)(a)

the reference to section 61E(8) of the principal Act is to be read as a reference to section 38A(6) of this Act,

s. 38C(5)(b)

references to the provision made by or under sections 61E(2), 61J and 61L of the principal Act are to be read as references to the provision made by or under sections 38A and 38B of this Act,

s. 38C(5)(c)

references to section 61L(2)(b) or (5) of the principal Act are to be disregarded, and

s. 38C(5)(d)

paragraph 8 is to have effect as if—

s. 38C(5)(d)(i)

sub-paragraphs (2)(b) and (c) were omitted,

s. 38C(5)(d)(ii)

in sub-paragraph (2), for paragraph (ea) there were substituted—, and

s. 38C(5)(d)(iii)

sub-paragraphs (3) to (5) were omitted.

s. 38C(5A)

Section 61G(6D) of the principal Act is to apply in relation to neighbourhood development plans as if it also provided that a modification under section 61G(6) of that Act of a designation of a neighbourhood area does not affect the continuation in force of a neighbourhood development plan even though, as a result of the modification, more than one plan has effect for the same area.

s. 38C(6)

Regulations under section 61G(11) of the principal Act (designation of areas as neighbourhood areas) may include provision about the consequences of the modification of designations

s. 38C(6)(a)

on proposals for neighbourhood development plans, or on neighbourhood development plans, that have already been made, or

s. 38C(6)(b)

on proposals for the modification of neighbourhood development plans, or on modifications of neighbourhood development plans, that have already been made.

s. 38C(7)

The fact that the list of applied provisions includes section 61N(2) and (3) of the principal Act is not to affect the operation of section 20(2) of the Interpretation Act 1978 in relation to other references to enactments applied in accordance with this section.

Sustainable development

s. 39 — Sustainable development
s. 39(1)

This section applies to any person who or body which exercises any function—

s. 39(1)(a)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 39(1)(b)

under Part 2 of this Act in relation to a joint spatial development strategy, local plan, minerals and waste plan or supplementary plan;

s. 39(1)(ba)

under section 38A to 38C in relation to a neighbourhood development plan.

s. 39(1)(c)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 39(2)

The person or body must exercise the function with the objective of contributing to the achievement of sustainable development.

s. 39(2A)

For the purposes of subsection (2) the person or body must (in particular) have regard to the desirability of achieving good design.

s. 39(3)

For the purposes of subsection (2) the person or body must have regard to national policies and advice contained in guidance issued by—

s. 39(3)(a)

the Secretary of State for the purposes of subsection (1)(b);

s. 39(3)(b)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Assistance with certain parts of development plan etc

s. 39A — Power to require assistance with certain plan making
s. 39A(1)

Subsection (2) applies if a plan-making authority notifies a prescribed public body in writing that the authority requires the body, under this section, to assist the authority in relation to the preparation or revision of a relevant plan by the authority.

s. 39A(2)

The prescribed public body must do everything that the plan-making authority reasonably requires of the body to assist the authority in relation to the preparation or revision of the relevant plan.

s. 39A(3)

The Secretary of State may by regulations make provision as to—

s. 39A(3)(a)

what a plan-making authority must, may or may not require a prescribed public body to do under subsection (2);

s. 39A(3)(b)

the procedure to be followed in doing anything under this section;

s. 39A(3)(c)

the determination of the time by or at which anything must be done under this section;

s. 39A(3)(d)

the form and content of a notification under subsection (1) or of any other document or information provided under this section.

s. 39A(4)

A “plan-making authority” is a body which, or other person who, is to prepare or revise (whether acting alone or jointly) a relevant plan.

s. 39A(5)

Each of the following is a “relevant plan”—

s. 39A(5)(a)

a local plan, a minerals and waste plan, a supplementary plan or policies map under Part 2;

s. 39A(5)(b)

a spatial development strategy under Part 8 of the Greater London Authority Act 1999 or Part 2 of this Act;

s. 39A(5)(c)

an infrastructure delivery strategy under Part 10A of the Planning Act 2008;

s. 39A(5)(d)

a marine plan under the Marine and Coastal Access Act 2009 for the English inshore region, the English offshore region or any part of either of those regions.

s. 39A(6)

A “prescribed public body” is a body which, or other person who, is prescribed or of a prescribed description and certain of whose functions are of a public nature.

s. 39A(7)

References in this section to the preparation or revision of a relevant plan include any activities that could reasonably be considered to prepare the way for the preparation or revision of the plan.

s. 39A(8)

In this section—“the English inshore region” and “the English offshore region” have the same meaning as in the Marine and Coastal Access Act 2009;“revision”, in relation to a relevant plan, includes any alteration, amendment, replacement or other modification (and related expressions are to be read accordingly).

Part 4

Development control

Local development orders

s. 40 — Local development orders
s. 40(1)

In the principal Act after section 61 (supplementary provision about development orders) there are inserted the following sections—

s. 40(2)

In each of the following provisions of the principal Act in each place where it occurs after “development order” there is inserted “ or a local development order ”

s. 40(2)(a)

section 56(5)(a) (definition of material development);

s. 40(2)(b)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 40(2)(c)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 40(2)(d)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 40(2)(e)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 40(2)(f)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 40(2)(g)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 40(2)(h)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 40(2)(i)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 40(2)(j)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 40(2)(k)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 40(2)(l)

section 279(1)(a)(i) (compensation for certain decisions and orders).

s. 40(3)

Section 333 of the principal Act (regulations and orders) is amended as follows—

s. 40(3)(a)

in subsection (4) after “55(2)(f),” there is inserted “ 61A(5) ”;

s. 40(3)(b)

in subsection (5)(b) after “28,” there is inserted “ 61A(5) (unless it is made by the National Assembly for Wales), ”.

s. 40(4)

Schedule 1 further amends the principal Act.

Revision of development orders

s. 41 — Effect of revision or revocation of development order on incomplete development

In the principal Act after section 61C (planning permission granted by local development orders) (inserted by section 40 of this Act) there is inserted the following section—

Applications

s. 42 — Applications for planning permission and certain consents
s. 42(1)

In the principal Act for section 62 (form and content of applications for planning permission) there is substituted the following section—

s. 42(2)

In section 73 of the principal Act (determination of applications to develop land without compliance with conditions previously attached) subsection (3) is omitted.

s. 42(3)

In section 198 of that Act (tree preservation orders) after subsection (7) there is inserted—

s. 42(4)

In section 220 of that Act (regulations controlling display of advertisements) after subsection (2) there is inserted the following subsection—

s. 42(5)

In the principal Act before section 328 (settled land and land of universities and colleges) there is inserted the following section—

s. 42(6)

In section 10(2) of the listed buildings Act (applications for listed buildings consent) the words from “shall be made” to “require and” are omitted.

s. 42(7)

In section 10(3) of that Act for paragraph (a) there are substituted the following paragraphs—.

s. 42(8)

In section 10 of that Act after subsection (3) there are inserted the following subsections—

s. 42(9)

In section 89(1) of that Act (application of certain provisions of the principal Act) after the entry relating to section 323 there is inserted— “ section 327A (compliance with requirements relating to applications), ”.

s. 43 — Power to decline to determine applications
s. 43(1)

For section 70A of the principal Act (power of local planning authority to decline to determine application) there are substituted the following sections—

s. 43(2)

In section 78(2)(aa) of that Act after “70A” there is inserted “ or 70B ”.

s. 43(3)

After section 81 of the listed buildings Act (authorities with functions under the Act) there are inserted the following sections—

s. 43(4)

Section 20(2) of that Act (appeals) is amended as follows—

s. 43(4)(a)

for “neither” there is substituted “ done none of the following ”;

s. 43(4)(b)

after paragraph (a) for “nor” there is substituted—.

s. 43(5)

This section has effect only in relation to applications made under the principal Act or the listed buildings Act which are received by the local planning authority after this section comes into force.

Major infrastructure projects

s. 44 — Major infrastructure projects

In the principal Act the following sections are inserted before section 77 (Reference of applications to the Secretary of State)—

Simplified planning zones

s. 45 — Simplified planning zones
s. 45(1)

In section 83 of the principal Act (making simplified planning zone schemes) subsection (1) is omitted.

s. 45(2)

Before section 83(2) of that Act there are inserted the following subsections—

s. 45(3)

For section 83(2) of that Act there are substituted the following subsections—

s. 45(4)

In section 83 of that Act after subsection (3) there is inserted the following subsection—

s. 45(5)

In section 85(1) of that Act (duration of simplified planning zone scheme) for the words from “period” to the end there is substituted “ specified period ”.

s. 45(6)

After section 85(1) of that Act there is inserted the following subsection—

s. 45(7)

In Schedule 7 of that Act in paragraph 2 (notification of proposal to make scheme) for “decide under section 83(2) to make or” there is substituted “ are required under section 83(2) to make or decide under section 83(2A) to ”.

s. 45(8)

In Schedule 7 of that Act paragraphs 3 and 4 are omitted.

s. 45(9)

In Schedule 7 of that Act in paragraph 12 (default powers of Secretary of State) for sub-paragraph (1) there are substituted the following sub-paragraphs—

Planning contribution

s. 46 — Planning contribution

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 47 — Planning contribution: regulations

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 48 — Planning contribution: Wales

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Miscellaneous

s. 49 — Development to include certain internal operations
s. 49(1)

In the principal Act in section 55 (meaning of development) after subsection (2) there are inserted the following subsections—

s. 49(2)

This subsection applies if—

s. 49(2)(a)

section 55(2) of the principal Act is disapplied in respect of any operations by virtue of a development order under section 55(2A) of that Act,

s. 49(2)(b)

at the date the development order comes into force a certificate under section 192 of the principal Act (certificate of lawfulness of proposed use or development) is in force in respect of the operations, and

s. 49(2)(c)

before that date no such operations have been begun.

s. 49(3)

If subsection (2) applies the certificate under section 192 of the principal Act is of no effect.

s. 49(4)

A development order made for the purposes of section 55(2A) of the principal Act does not affect any operations begun before it is made.

s. 50 — Appeal made: functions of local planning authority
s. 50(1)

In the principal Act after section 78 (right to appeal) there is inserted the following section—

s. 50(2)

In the listed buildings Act after section 20 (right to appeal) there is inserted the following section—

s. 50(3)

This section has effect only in relation to relevant applications which are received by the local planning authority after the commencement of this section.

s. 50(4)

The following are relevant applications—

s. 50(4)(a)

an application mentioned in section 78(1)(a) of the principal Act;

s. 50(4)(b)

an application mentioned in section 20(1)(a) of the listed buildings Act;

s. 50(4)(c)

an application mentioned in section 20(1)(a) of the listed buildings Act as given effect by section 74(3) of that Act (application of certain provisions to the control of demolition in conservation areas).

s. 51 — Duration of permission and consent
s. 51(1)

Section 91 of the principal Act (limit on duration of planning permission) is amended as follows—

s. 51(1)(a)

in subsections (1)(a) and (3) for the words “five years” there is substituted“ three years ”;

s. 51(1)(b)

after subsection (3) there are inserted the following subsections—

s. 51(2)

In section 92 of that Act (outline planning permission)—

s. 51(2)(a)

in subsection (2)(b) sub-paragraph (i) is omitted;

s. 51(2)(b)

in subsection (2)(b) in sub-paragraph (ii) the words “if later” are omitted;

s. 51(2)(c)

in subsection (4) “five years” is omitted.

s. 51(3)

In section 73 of the principal Act (applications to develop land without compliance with existing conditions) after subsection (4) there is inserted the following subsection—

s. 51(4)

Section 18 of the listed buildings Act (limit of duration of listed buildings consent) is amended as follows—

s. 51(4)(a)

in subsections (1)(a) and (2) for the words “five years” there is substituted “ three years ”;

s. 51(4)(b)

after subsection (2) there are inserted the following subsections—

s. 51(5)

In section 19 of that Act (variation or discharge of conditions) after subsection (4) there is inserted the following subsection—

s. 51(6)

This section has effect only in relation to applications made under the principal Act or the listed buildings Act which are received by the local planning authority after the commencement of the section.

s. 52 — Temporary stop notice

After section 171D of the principal Act (penalties for non-compliance with planning contravention notice) there are inserted the following sections—

s. 53 — Fees and charges
s. 53(1)

Section 303 (fees for planning applications, etc) of the principal Act is amended as follows.

s. 53(2)

The following subsections are substituted for subsections (1) and (2)—

s. 53(3)

In subsection (4) after the first “prescribed” there is inserted “ charge or ”.

s. 53(4)

After subsection (5) there are inserted the following subsections—

s. 53(5)

Subsection (6) is omitted.

s. 54 — Duty to respond to consultation
s. 54(1)

This section applies to a prescribed requirement to consult any person or body (the consultee) which exercises functions for the purposes of any enactment.

s. 54(2)

A prescribed requirement to consult is a requirement—

s. 54(2)(a)

with which the appropriate authority or a local planning authority must comply before granting any permission, approval or consent under or by virtue of the planning Acts;

s. 54(2)(b)

which is prescribed for the purposes of this subsection.

s. 54(3)

At any time before an application is made for any permission, approval or consent mentioned in subsection (2) any person may in relation to a proposed development consult the consultee on any matter in respect of which the appropriate authority is or the local planning authority are required to consult the consultee.

s. 54(4)

The consultee must give a substantive response to any consultation mentioned in subsection (2) or by virtue of subsection (3) before the end of—

s. 54(4)(a)

the period prescribed for the purposes of this subsection, or

s. 54(4)(b)

such other period as is agreed in writing between the consultee and the appropriate authority or the local planning authority (as the case may be).

s. 54(5)

The appropriate authority may also prescribe—

s. 54(5)(a)

the procedure to be followed for the purposes of this section;

s. 54(5)(b)

the information to be provided to the consultee for the purposes of the consultation;

s. 54(5)(c)

the requirements of a substantive response.

s. 54(6)

Anything prescribed for the purposes of subsections (1) to (5) must be prescribed by development order.

s. 54(7)

A development order may—

s. 54(7)(a)

require consultees to give the appropriate authority a report as to their compliance with subsection (4);

s. 54(7)(b)

prescribe the form and content of the report;

s. 54(7)(c)

prescribe the times at which the report is to be made.

s. 54(8)

The appropriate authority is—

s. 54(8)(a)

the Secretary of State in relation to England;

s. 54(8)(b)

the National Assembly for Wales in relation to Wales.

s. 55 — Time in which Secretary of State to take decisions
s. 55(1)

Schedule 2 contains provisions about the time in which the Secretary of State must take certain decisions.

s. 55(2)

But Schedule 2 does not apply in relation to any decision taken in the exercise of a function in relation to Wales if the function is exercisable in relation to Wales by the National Assembly for Wales by virtue of an order under section 22 of the Government of Wales Act 1998 (c. 38).

Part 5

Correction of errors

s. 56 — Correction of errors in decisions
s. 56(1)

This section applies if the Secretary of State or an inspector issues a decision document which contains a correctable error.

s. 56(2)

The Secretary of State or the inspector (as the case may be) may correct the error—

s. 56(2)(a)

if he is requested to do so in writing by any person;

s. 56(2)(b)

if he sends a statement in writing to the applicant which explains the error and states that he is considering making the correction.

s. 56(3)

But the Secretary of State or inspector must not correct the error unless—

s. 56(3)(a)

not later than the end of the relevant period he receives a request mentioned in subsection (2)(a) or sends a statement mentioned in subsection (2)(b), and

s. 56(3)(b)

he informs the local planning authority of that fact, ...

s. 56(3)(c)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 56(4)

The relevant period—

s. 56(4)(a)

is the period within which an application or appeal may be made to the High Court in respect of the decision recorded in the decision document;

s. 56(4)(b)

does not include any time by which such a period may be extended by the High Court.

s. 56(5)

It is immaterial whether any such application or appeal is made.

s. 56(6)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 56(7)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 57 — Correction notice
s. 57(1)

If paragraph (a) or (b) of section 56(2) applies the Secretary of State or the inspector must as soon as practicable after making any correction or deciding not to make any correction issue a notice in writing (a correction notice) which—

s. 57(1)(a)

specifies the correction of the error, or

s. 57(1)(b)

gives notice of his decision not to correct such an error.

s. 57(2)

The Secretary of State or the inspector (as the case may be) must give the correction notice to—

s. 57(2)(a)

the applicant;

s. 57(2)(b)

if the applicant is not the owner of the land in respect of which the original decision was made, the owner;

s. 57(2)(c)

the local planning authority for the area in which the land in respect of which the decision was made is situated;

s. 57(2)(d)

if the correction was requested by any other person, that person.

s. 57(3)

The Secretary of State may by order specify any other person or description of persons to whom the correction notice must be given.

s. 58 — Effect of correction
s. 58(1)

If a correction is made in pursuance of section 56—

s. 58(1)(a)

the original decision is taken not to have been made;

s. 58(1)(b)

the decision is taken for all purposes to have been made on the date the correction notice is issued.

s. 58(2)

If a correction is not made—

s. 58(2)(a)

the original decision continues to have full force and effect;

s. 58(2)(b)

nothing in this Part affects anything done in pursuance of or in respect of the decision.

s. 58(3)

Section 288 of the principal Act (proceedings for questioning the validity of certain decisions) applies to the correction notice as if it were an action on the part of the Secretary of State to which that section applies, if the decision document in respect of which the correction notice is given records a decision mentioned in—

s. 58(3)(a)

paragraph (a) of section 59(4) below, or

s. 58(3)(b)

paragraph (b) of that section, if it is a decision mentioned in section 177 of the principal Act (grant or modification of planning permission on appeal against enforcement notice).

s. 58(4)

Section 289 of the principal Act (appeals to the High Court relating to enforcement notices and notices under section 207 of that Act) applies to the correction notice as if it were a decision of the Secretary of State mentioned in—

s. 58(4)(a)

subsection (1) of that section, if the decision document in respect of which the correction notice is given records a decision mentioned in paragraph (b) of section 59(4) below (not being a decision mentioned in section 177 of the principal Act), or

s. 58(4)(b)

subsection (2) of that section, if the decision document in respect of which the correction notice is given records a decision mentioned in paragraph (c) of section 59(4) below.

s. 58(5)

Section 63 of the listed buildings Act (proceedings for questioning the validity of certain decisions) applies to the correction notice as if it were a decision of the Secretary of State to which that section applies, if the decision document in respect of which the correction notice is given records a decision mentioned in any of paragraphs (d) to (f) of section 59(4) below.

s. 58(6)

Section 22 of the hazardous substances Act (proceedings for questioning the validity of certain decisions) applies to the correction notice as if it were a decision of the Secretary of State under section 20 or 21 of that Act, if the decision document in respect of which the correction notice is given records a decision mentioned in paragraph (g) of section 59(4) below.

s. 58(7)

If the decision document in respect of which the correction notice is given records a decision mentioned in paragraph (h) of section 59(4) the Secretary of State must by order make provision for questioning the validity of the notice which corresponds to the provisions of the planning Acts mentioned in subsections (3) to (6) above.

s. 58(8)

Except to the extent provided for by virtue of this section a correction notice must not be questioned in any legal proceedings.

s. 59 — Supplementary
s. 59(1)

This section applies for the purposes of this Part.

s. 59(2)

An inspector is a person appointed under any of the planning Acts to determine appeals instead of the Secretary of State or appointed under section 76D of the principal Act to determine applications instead of the Secretary of State .

s. 59(2A)

An inspector is also a person appointed under Schedule 4D of the principal Act to determine an application instead of the Welsh Ministers.

s. 59(3)

In the case of a decision document issued by an inspector any other inspector may act under this Part.

s. 59(4)

A decision document is a document which records any of the following decisions—

s. 59(4)(a)

a decision of any description which constitutes action on the part of the Secretary of State under section 284(3) of the principal Act (decisions which are not to be questioned in legal proceedings);

s. 59(4)(b)

a decision in proceedings on an appeal under Part 7 of that Act (enforcement notices);

s. 59(4)(c)

a decision in proceedings on an appeal under section 208 of that Act (appeals against enforcement notices relating to trees);

s. 59(4)(d)

a decision mentioned in section 62(2) of the listed buildings Act (decisions which are not to be questioned in legal proceedings);

s. 59(4)(e)

a decision on an appeal under section 39 of that Act (appeals against listed building enforcement notices);

s. 59(4)(f)

a decision relating to conservation area consent within the meaning of section 74(1) of that Act (consent required for demolition of certain buildings);

s. 59(4)(g)

a decision under section 20 or 21 of the hazardous substances Act (certain applications referred to and appeals determined by the Secretary of State);

s. 59(4)(h)

a decision under any of the planning Acts which is of a description specified by the Secretary of State by order.

s. 59(5)

A correctable error is an error—

s. 59(5)(a)

which is contained in any part of the decision document which records the decision, but

s. 59(5)(b)

which is not part of any reasons given for the decision.

s. 59(6)

The applicant is—

s. 59(6)(a)

in the case of a decision made on an application under any of the planning Acts, the person who made the application;

s. 59(6)(b)

in the case of a decision made on an appeal under any of those Acts, the appellant.

s. 59(7)

The owner in relation to land is a person who—

s. 59(7)(a)

is the estate owner in respect of the fee simple;

s. 59(7)(b)

is entitled to a tenancy granted or extended for a term of years simple of which not less than seven years remain unexpired;

s. 59(7)(c)

is entitled to an interest in any mineral prescribed by a development order, in the case of such applications under the principal Act as are so prescribed.

s. 59(8)

Error includes omission.

s. 59(9)

For the purposes of the exercise of any function under this Part in relation to Wales references to the Secretary of State must be construed as references to the National Assembly for Wales.

Part 6

Wales

National Development Framework

s. 60 — National Development Framework for Wales
s. 60(1)

There must be a plan, prepared and published by the Welsh Ministers, to be known as the National Development Framework for Wales.

s. 60(2)

The Framework must set out such of the policies of the Welsh Ministers in relation to the development and use of land in Wales as the Welsh Ministers consider appropriate.

s. 60(3)

The Framework may specify that development of a particular description, in a particular area or location, is to constitute a significant infrastructure project for the purposes of the Infrastructure (Wales) Act 2024.

s. 60(4)

The Framework must give reasons for—

s. 60(4)(a)

the policies that it sets out, and

s. 60(4)(b)

any provision that it makes as mentioned in subsection (3).

s. 60(5)

The Framework must explain how, in preparing the Framework, the Welsh Ministers have taken into account relevant policies set out in—

s. 60(5)(za)

the national natural resources policy published under section 9 of the Environment (Wales) Act 2016,

s. 60(5)(a)

any marine plan adopted and published by them under Part 3 of the Marine and Coastal Access Act 2009, and

s. 60(5)(b)

the Wales Transport Strategy published under section 2 of the Transport (Wales) Act 2006.

s. 60(6)

The Framework must specify the period for which it is to have effect.

s. 60(7)

A plan ceases to be the National Development Framework for Wales on the expiry of the period specified under subsection (6).

s. 60A — Preparation of Framework: statement of public participation
s. 60A(1)

The Welsh Ministers must prepare and publish a statement of public participation setting out their policies relating to the consultation to be carried out in preparing the National Development Framework for Wales.

s. 60A(2)

In particular, the statement must include provision about—

s. 60A(2)(a)

the form that the consultation will take,

s. 60A(2)(b)

when the consultation will take place, and

s. 60A(2)(c)

the steps that will be taken to involve members of the public in the preparation of the Framework.

s. 60A(3)

The statement must provide that, as part of the consultation, the Welsh Ministers will—

s. 60A(3)(a)

publish a draft of the Framework, and

s. 60A(3)(b)

allow a period of 12 weeks beginning with the publication of the draft Framework during which any person may make representations with regard to the draft.

s. 60A(4)

The Welsh Ministers may revise the statement, and must publish the statement as revised.

s. 60B — Procedure for preparation and publication of Framework
s. 60B(1)

Before publishing the National Development Framework for Wales, the Welsh Ministers must—

s. 60B(1)(a)

prepare a draft of the Framework,

s. 60B(1)(b)

carry out an appraisal of the sustainability of the policies set out in the draft, and

s. 60B(1)(c)

carry out consultation in accordance with the statement of public participation.

s. 60B(1A)

In preparing the draft Framework under subsection (1)(a), the Welsh Ministers must have regard to the most recent sustainable land management report published under section 6 of the Agriculture (Wales) Act 2023.

s. 60B(2)

The appraisal under subsection (1)(b) must include an assessment of the likely effects of the policies in the draft Framework on the use of the Welsh language.

s. 60B(3)

If, after complying with subsection (1), the Welsh Ministers wish to proceed with the draft of the Framework (with or without changes), they must lay before the National Assembly for Wales—

s. 60B(3)(a)

the draft, and

s. 60B(3)(b)

a report which—

s. 60B(3)(b)(i)

summarises the representations they received during the consultation carried out under subsection (1)(c), and

s. 60B(3)(b)(ii)

explains how they have taken the representations into account.

s. 60B(4)

The Welsh Ministers must have regard to—

s. 60B(4)(a)

any resolution passed by the National Assembly for Wales with regard to the draft Framework during the Assembly consideration period, and

s. 60B(4)(b)

any recommendation made by a committee of the National Assembly with regard to the draft during that period.

s. 60B(5)

After the expiry of the Assembly consideration period, the Welsh Ministers—

s. 60B(5)(a)

may publish the National Development Framework for Wales in the terms of the draft laid under subsection (3), or

s. 60B(5)(b)

if they propose to make changes to that draft, may—

s. 60B(5)(b)(i)

lay before the National Assembly for Wales an amended draft of the Framework, and

s. 60B(5)(b)(ii)

publish the National Development Framework for Wales in the terms of the amended draft.

s. 60B(6)

If any resolution was passed or any recommendation was made as mentioned in subsection (4), the Welsh Ministers must also, not later than the day on which the Framework is published, lay before the National Assembly for Wales a statement explaining how they have had regard to the resolution or recommendation.

s. 60B(7)

In this section, “the Assembly consideration period” means the period of 60 days beginning with the day on which a draft of the Framework is laid before the National Assembly for Wales under subsection (3), disregarding any time when the National Assembly is dissolved or is in recess for more than four days.

s. 60C — Review and revision of Framework
s. 60C(1)

The Welsh Ministers must keep the National Development Framework for Wales under review.

s. 60C(2)

The Welsh Ministers may revise the Framework at any time, and must publish the Framework as revised.

s. 60C(3)

Sections 60A and 60B apply for the purposes of the revision of the Framework, as if references to the Framework (or a draft of the Framework) were references to the Framework as revised (or a draft of the Framework as revised).

s. 60C(4)

Subsection (5) applies if the Welsh Ministers, having published a draft of a revised Framework in accordance with the statement of public participation, decide not to proceed with the revision of the Framework.

s. 60C(5)

The Welsh Ministers must—

s. 60C(5)(a)

publish notice of their decision and the reasons for it, and

s. 60C(5)(b)

if a draft of a revised Framework has been laid before the National Assembly for Wales under section 60B(3), lay a copy of the notice before the National Assembly.

s. 60C(6)

Subsection (7) applies if—

s. 60C(6)(a)

a review period ends, and

s. 60C(6)(b)

the Welsh Ministers have not, within that period—

s. 60C(6)(b)(i)

published a revised Framework, or

s. 60C(6)(b)(ii)

laid a draft revised Framework before the National Assembly for Wales under section 60B(3).

s. 60C(7)

As soon as reasonably practicable after the end of the review period, the Welsh Ministers must publish and lay before the National Assembly for Wales a statement—

s. 60C(7)(a)

setting out their assessment of whether the Framework should be revised and giving reasons for that assessment, and

s. 60C(7)(b)

if they consider that the Framework should be revised, setting out a timetable for its revision.

s. 60C(8)

For the purposes of subsections (6) and (7)—

s. 60C(8)(a)

the first review period—

s. 60C(8)(a)(i)

begins with the day on which the Framework is first published, and

s. 60C(8)(a)(ii)

ends with the fifth anniversary of the day on which the Framework is first published or, if earlier, with the day on which a revised Framework is published;

s. 60C(8)(b)

each subsequent review period—

s. 60C(8)(b)(i)

begins with the day after the last day of the preceding review period, and

s. 60C(8)(b)(ii)

ends with the fifth anniversary of the last day of the preceding review period or, if earlier, with the day on which a revised Framework is published.

...

s. 60D — ...

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 60E — ...

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 60F — ...

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 60G — ...

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 60H — ...

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 60I — ...

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 60J — ...

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Strategic planning by corporate joint committees

s. 60K — Corporate joint committees to which this Part applies

In this Part, references to a corporate joint committee are to a corporate joint committee to which this Part applies by virtue of regulations under Part 5 of the Local Government and Elections (Wales) Act 2021.

s. 60L — Corporate joint committees: area survey
s. 60L(1)

A corporate joint committee must keep under review the matters which may be expected to affect the development, or the planning of the development, of its area.

s. 60L(2)

Subsections (2) to (5) of section 61 apply in relation to a corporate joint committee as they apply in relation to a local planning authority.

s. 60L(3)

In subsections (2) to (5) of section 61 as they apply by virtue of subsection (2)—

s. 60L(3)(a)

references to a local planning authority are to be construed as references to a corporate joint committee;

s. 60L(3)(b)

references to a neighbouring area are to be construed as references to a neighbouring area which is the area of another corporate joint committee.

s. 60M — Corporate joint committee areas: strategic development plans
s. 60M(1)

A corporate joint committee must prepare a plan for its area to be known as a strategic development plan.

s. 60M(2)

The plan must set out—

s. 60M(2)(a)

the committee's objectives in relation to the development and use of land in its area;

s. 60M(2)(b)

the committee's policies for the implementation of those objectives.

s. 60M(3)

The plan must be in general conformity with the National Development Framework for Wales.

s. 60M(4)

The plan must specify the period for which it is to have effect.

s. 60M(5)

The Welsh Ministers may by regulations make provision about—

s. 60M(5)(a)

the period that may be specified under subsection (4);

s. 60M(5)(b)

the form and content of the plan.

s. 60M(6)

In preparing its plan the committee must have regard to—

s. 60M(6)(a)

current national policies;

s. 60M(6)(b)

the National Development Framework for Wales;

s. 60M(6)(c)

any strategic development plan for an area that adjoins the committee's area;

s. 60M(6)(d)

the local development plan for each area all or part of which is included in the committee's area;

s. 60M(6)(e)

the resources likely to be available for implementing the plan;

s. 60M(6)(f)

any other matters prescribed by the Welsh Ministers in regulations.

s. 60M(7)

The committee must also—

s. 60M(7)(a)

carry out an appraisal of the sustainability of the plan;

s. 60M(7)(b)

prepare a report of the findings of the appraisal.

s. 60M(8)

The appraisal must include an assessment of the likely effects of the plan on the use of the Welsh language in the area.

s. 60M(9)

A plan is a strategic development plan only in so far as it is—

s. 60M(9)(a)

adopted by resolution of the corporate joint committee as its strategic development plan, or

s. 60M(9)(b)

approved by the Welsh Ministers under section 65 or 71 (as they apply by virtue of section 60N).

s. 60M(10)

The plan ceases to be a strategic development plan on the expiry of the period specified under subsection (4).

s. 60N — Strategic development plans: application of provisions of this Part
s. 60N(1)

The provisions specified in subsection (3) apply in relation to a strategic development plan as they apply in relation to a local development plan.

s. 60N(2)

Accordingly, where a provision specified in subsection (3) confers power for the Welsh Ministers to make provision by regulations in respect of a local development plan, that power is also exercisable so as to make provision in respect of a strategic development plan prepared by a corporate joint committee.

s. 60N(3)

The provisions are sections 63 to 68, 68A(1), 69 to 71, 73 and 75 to 77.

s. 60N(4)

In those provisions as they apply by virtue of subsection (1)—

s. 60N(4)(a)

references to a local planning authority are to be construed as references to a corporate joint committee;

s. 60N(4)(b)

references to a local development plan are to be construed as references to a strategic development plan.

s. 60N(5)

In section 64(5)(a) as it applies by virtue of this section, the reference to section 62 is to be construed as a reference to section 60M.

s. 60N(6)

In section 77(2)(a) as it applies by virtue of this section, the reference to section 62(6) is to be construed as a reference to section 60M(7).

Survey

s. 61 — Survey
s. 61(1)

The local planning authority must keep under review the matters which may be expected to affect the development of their area or the planning of its development.

s. 61(2)

These matters include—

s. 61(2)(a)

the principal physical, economic, social and environmental characteristics of the area of the authority (including the extent to which the Welsh language is used in the area) ;

s. 61(2)(b)

the principal purposes for which land is used in the area;

s. 61(2)(c)

the size, composition and distribution of the population of the area;

s. 61(2)(d)

the communications, transport system and traffic of the area;

s. 61(2)(e)

any other considerations which may be expected to affect those matters;

s. 61(2)(f)

such other matters as may be prescribed or as the Assembly in a particular case may direct.

s. 61(3)

These matters also include—

s. 61(3)(a)

any changes which the authority think may occur in relation to any other matter;

s. 61(3)(b)

the effect such changes are likely to have on the development of the authority’s area or on the planning of such development.

s. 61(4)

The local planning authority may also keep under review and examine the matters mentioned in subsections (2) and (3) in relation to any neighbouring area to the extent that those matters may be expected to affect the area of the authority.

s. 61(5)

In exercising a function under subsection (4) a local planning authority must consult the local planning authority for the neighbouring area in question.

s. 61(6)

If a neighbouring area is in England, the reference in subsection (5) to the local planning authority for that area is to be construed as a reference to the local planning authority and the minerals and waste planning authority, in each case for the purposes of Part 2, for that area.

Plans

s. 62 — Local development plan
s. 62(1)

The local planning authority must prepare a plan for their area to be known as a local development plan.

s. 62(2)

The plan must set out—

s. 62(2)(a)

the authority’s objectives in relation to the development and use of land in their area;

s. 62(2)(b)

their general policies for the implementation of those objectives.

s. 62(3)

The plan may also set out specific policies in relation to any part of the area of the authority.

s. 62(3A)

The plan must be in general conformity with—

s. 62(3A)(a)

the National Development Framework for Wales, and

s. 62(3A)(b)

the strategic development plan for any... area that includes all or part of the area of the authority.

s. 62(3B)

The plan must specify the period for which it is to have effect.

s. 62(4)

Regulations under this section may —

s. 62(4)(a)

make provision about the period that may be specified under subsection (3B);

s. 62(4)(b)

prescribe the form and content of the plan.

s. 62(5)

In preparing a local development plan the authority must have regard to—

s. 62(5)(a)

current national policies;

s. 62(5)(b)

the National Development Framework for Wales;

s. 62(5)(ba)

the strategic development plan for any... area that—

s. 62(5)(ba)(i)

includes all or part of the area of the authority, or

s. 62(5)(ba)(ii)

adjoins that area;

s. 62(5)(bb)

any area statement published under section 11 of the Environment (Wales) Act 2016 for an area that includes all or part of the area of the authority;

s. 62(5)(c)

the RSS for any region which adjoins the area of the authority;

s. 62(5)(d)

any relevant local well-being plan;

s. 62(5)(f)

the resources likely to be available for implementing the plan;

s. 62(5)(g)

such other matters as the Assembly prescribes.

s. 62(6)

The authority must also—

s. 62(6)(a)

carry out an appraisal of the sustainability of the plan;

s. 62(6)(b)

prepare a report of the findings of the appraisal.

s. 62(6A)

The appraisal must include an assessment of the likely effects of the plan on the use of the Welsh language in the area of the authority.

s. 62(7)

A local well-being plan is relevant if it has been published under section 39, 44(5) or 47(6) or (11) of the Well-being of Future Generations (Wales) Act 2015 (anaw 2) by—

s. 62(7)(a)

in the case of an authority which is a county council or county borough council, the public services board of which that authority is a member;

s. 62(7)(b)

in the case of an authority which is a National Park Authority, the public services board for an area that includes any part of that authority's area.

s. 62(8)

A plan is a local development plan only in so far as it—

s. 62(8)(a)

is adopted by resolution of the local planning authority as a local development plan;

s. 62(8)(b)

is approved by the Assembly under section 65 or 71.

s. 62(9)

A plan ceases to be a local development plan on the expiry of the period specified under subsection (3B).

s. 63 — Preparation requirements
s. 63(1)

A local development plan must be prepared in accordance with—

s. 63(1)(a)

the local planning authority’s community involvement scheme;

s. 63(1)(b)

the timetable for the preparation and adoption of the authority’s local development plan.

s. 63(2)

The authority’s community involvement scheme is a statement of the authority’s policy as to the involvement in the exercise of the authority’s functions under this Part of the persons to which subsection (3) applies.

s. 63(3)

The persons mentioned in subsection (2)—

s. 63(3)(a)

must include such persons as the Assembly prescribes;

s. 63(3)(b)

may include such other persons as appear to the authority to have an interest in matters relating to development in the area of the authority.

s. 63(4)

The authority and the Assembly must attempt to agree the terms of the documents mentioned in paragraphs (a) and (b) of subsection (1).

s. 63(5)

But to the extent that the Assembly and the authority cannot agree the terms the Assembly may direct that the documents must be in the terms specified in the direction.

s. 63(6)

The authority must comply with the direction.

s. 63(7)

The Assembly may prescribe—

s. 63(7)(a)

the procedure in respect of the preparation of the documents mentioned in paragraphs (a) and (b) of subsection (1);

s. 63(7)(b)

the form and content of the documents;

s. 63(7)(c)

the time at which any step in the preparation of the documents must be taken;

s. 63(7)(d)

publicity about the documents;

s. 63(7)(e)

making the documents available for inspection by the public;

s. 63(7)(f)

circumstances in which the requirements of the documents need not be complied with.

s. 64 — Independent examination
s. 64(1)

The local planning authority must submit their local development plan to the Assembly for independent examination.

s. 64(2)

But the authority must not submit a plan unless—

s. 64(2)(a)

they have complied with any relevant requirements contained in regulations under this Part, and

s. 64(2)(b)

they think the plan is ready for independent examination.

s. 64(3)

The authority must also send to the Assembly (in addition to the local development plan) such other documents (or copies of documents) and such information as is prescribed.

s. 64(4)

The examination must be carried out by a person appointed by the Assembly.

s. 64(5)

The purpose of the independent examination is to determine in respect of a local development plan—

s. 64(5)(a)

whether it satisfies the requirements of sections 62 and 63 and of regulations under section 77;

s. 64(5)(b)

whether it is sound.

s. 64(6)

Any person who makes representations seeking to change a local development plan must (if he so requests) be given the opportunity to appear before and be heard by the person carrying out the examination.

s. 64(7)

The person appointed to carry out the examination must—

s. 64(7)(a)

make recommendations;

s. 64(7)(b)

give reasons for the recommendations.

s. 64(8)

The local planning authority must publish the recommendations and the reasons.

s. 65 — Intervention by Assembly
s. 65(1)

If the Assembly thinks that a local development plan is unsatisfactory—

s. 65(1)(a)

it may at any time before the plan is adopted by the local planning authority direct them to modify the plan in accordance with the direction;

s. 65(1)(b)

if it gives such a direction it must state its reasons for doing so.

s. 65(2)

The authority—

s. 65(2)(a)

must comply with the direction;

s. 65(2)(b)

must not adopt the plan unless the Assembly gives notice that it is satisfied that they have complied with the direction.

s. 65(3)

But subsection (2) does not apply if the Assembly withdraws the direction.

s. 65(4)

At any time before a local development plan is adopted by a local planning authority the Assembly may direct that the plan is submitted to it for its approval.

s. 65(5)

The following paragraphs apply if the Assembly gives a direction under subsection (4)—

s. 65(5)(a)

the authority must not take any step in connection with the adoption of the plan until the Assembly gives its decision;

s. 65(5)(b)

if the direction is given before the authority have submitted the plan under section 64(1) the Assembly must hold an independent examination and section 64(4) to (7) applies accordingly;

s. 65(5)(c)

if the direction is given after the authority have submitted the plan the person appointed to carry out the examination must make his recommendations to the Assembly;

s. 65(5)(d)

the plan has no effect unless it has been approved by the Assembly.

s. 65(6)

The Assembly must publish the recommendations made to it by virtue of subsection (5)(b) or (c) and the reasons of the person making the recommendations.

s. 65(7)

In considering a plan submitted under subsection (4) the Assembly may take account of any matter which it thinks is relevant.

s. 65(8)

It is immaterial whether any such matter was taken account of by the authority.

s. 65(9)

The Assembly—

s. 65(9)(a)

may approve, approve subject to specified modifications or reject a plan submitted to it under subsection (4);

s. 65(9)(b)

must give reasons for its decision under paragraph (a).

s. 65(10)

In the exercise of any function under this section the Assembly must have regard to the documents mentioned in paragraphs (a) and (b) of section 63(1).

s. 66 — Withdrawal of local development plan in accordance with direction
s. 66(1)

The Welsh Ministers may, at any time before a local development plan is adopted under section 67, direct the local planning authority to withdraw the plan.

s. 66(2)

If the Welsh Ministers give a direction under subsection (1), they must state their reasons for doing so.

s. 66(3)

The authority must withdraw the plan in accordance with the direction.

s. 66A — Withdrawal of local development plan in absence of direction
s. 66A(1)

This section applies where a local planning authority are not required to withdraw their local development plan under section 66.

s. 66A(2)

Subject to the provisions of this section, the authority may withdraw the plan at any time before adopting it under section 67.

s. 66A(3)

A local planning authority may not withdraw their local development plan when the Welsh Ministers have—

s. 66A(3)(a)

directed the authority to submit the plan for approval under section 65(4), or

s. 66A(3)(b)

taken any step under section 71 in connection with the plan.

s. 66A(4)

A local planning authority may withdraw a local development plan that has been submitted for independent examination under section 64 only if—

s. 66A(4)(a)

the person carrying out the independent examination recommends that the plan is withdrawn, and

s. 66A(4)(b)

the recommendation is not overruled by a direction given by the Welsh Ministers.

s. 66A(5)

A local planning authority may withdraw a local development plan to which subsection (6) applies only if—

s. 66A(5)(a)

the authority have given notice to the Welsh Ministers of their intention to withdraw the plan, and

s. 66A(5)(b)

the notice period has expired.

s. 66A(6)

This subsection applies to a local development plan if the local planning authority—

s. 66A(6)(a)

have not yet submitted the plan for independent examination under section 64, but

s. 66A(6)(b)

have taken steps in connection with the preparation of the plan that are specified in regulations made by the Welsh Ministers.

s. 66A(7)

Where a local planning authority have given notice under subsection (5)(a), the Welsh Ministers may, by direction to the authority, do either or both of the following—

s. 66A(7)(a)

require the authority to provide further information;

s. 66A(7)(b)

extend the notice period.

s. 66A(8)

The Welsh Ministers may by regulations make provision about the giving of notices and directions under this section (including provision about their form and content and how they are to be given).

s. 66A(9)

Subject to any direction given under subsection (7)(b) in a particular case, the “notice period” means whatever period, beginning with the giving of notice under subsection (5)(a), is specified in regulations made by the Welsh Ministers.

s. 67 — Adoption of local development plan
s. 67(1)

The local planning authority may adopt a local development plan as originally prepared if the person appointed to carry out the independent examination of the plan recommends that the plan as originally prepared is adopted.

s. 67(2)

The authority may adopt a local development plan with modifications if the person appointed to carry out the independent examination of the plan recommends the modifications.

s. 67(3)

A plan is adopted for the purposes of this section if it is adopted by resolution of the authority.

s. 67(4)

But the authority must not adopt a local development plan if the Assembly directs them not to do so.

s. 68 — Revocation of local development plan

The Assembly may at any time revoke a local development plan at the request of the local planning authority.

s. 68A — Duty to consider whether to review local development plan
s. 68A(1)

Following the publication of the National Development Framework for Wales or a revised Framework, a local planning authority must consider whether to carry out a review of their local development plan.

s. 68A(2)

Following the adoption or approval of a strategic development plan or revised strategic development plan for all or part of their area, a local planning authority must consider whether to carry out a review of their local development plan.

s. 69 — Review of local development plan
s. 69(1)

A local planning authority must carry out a review of their local development plan —.

s. 69(1)(a)

if, after consideration under section 68A, they think that the plan should be reviewed, and

s. 69(1)(b)

at such other times as the Welsh Ministers prescribe.

s. 69(2)

The authority must report to the Assembly on the findings of their review.

s. 69(3)

A review must—

s. 69(3)(a)

be in such form as is prescribed;

s. 69(3)(b)

be published in accordance with such requirements as are prescribed.

s. 70 — Revision of local development plan
s. 70(1)

The local planning authority may at any time prepare a revision of a local development plan.

s. 70(2)

The authority must prepare a revision of a local development plan—

s. 70(2)(a)

if the Assembly directs them to do so;

s. 70(2)(b)

if, following a review under section 69, they think that the plan should be revised.

s. 70(3)

This Part applies to the revision of a local development plan as it applies to the preparation of the plan.

s. 71 — Assembly’s default power
s. 71(1)

This section applies if the Assembly thinks that a local planning authority are failing or omitting to do anything it is necessary for them to do in connection with the preparation, revision or adoption of a local development plan.

s. 71(2)

The Assembly must hold an independent examination and section 64(4) to (7) applies accordingly.

s. 71(3)

The Assembly must publish the recommendations and reasons of the person appointed to hold the examination.

s. 71(4)

The Assembly may—

s. 71(4)(a)

prepare or revise (as the case may be) the plan, and

s. 71(4)(b)

approve the plan as a local development plan.

s. 71(5)

The Assembly must give reasons for anything it does in pursuance of subsection (4).

s. 71(6)

The authority must reimburse the Assembly for any expenditure it incurs in connection with anything—

s. 71(6)(a)

which is done by it under subsection (4), and

s. 71(6)(b)

which the authority failed or omitted to do as mentioned in subsection (1).

s. 72 — Joint local development plans
s. 72(A1)

The Welsh Ministers may direct two or more local planning authorities to prepare a joint local development plan.

s. 72(A2)

But a direction under subsection (A1) may not be given to a National Park authority.

s. 72(1)

Two or more local planning authorities may , in the absence of a direction to any of them under subsection (A1), agree to prepare a joint local development plan.

s. 72(1A)

If the Welsh Ministers give a direction under subsection (A1), they must state their reasons for doing so.

s. 72(1B)

The authorities to which a direction is given must, subject to any withdrawal or variation of the direction, act jointly in exercising their functions under this Part relating to local development plans.

s. 72(2)

This Part applies for the purposes of the preparation, revision, adoption, withdrawal and revocation of a joint local development plan as it applies for the purposes of the preparation, revision, adoption, withdrawal and revocation of a local development plan.

s. 72(3)

For the purposes of subsection (2) anything which must be done by or in relation to a local planning authority in connection with a local development plan must be done by or in relation to each of the authorities mentioned in subsection (A1) or (1) in connection with a joint local development plan.

s. 72(4)

Subsections (5) to (7) apply if —

s. 72(4)(a)

the Welsh Ministers withdraw a direction under subsection (A1) or vary such a direction so that it ceases to apply to a local planning authority, or

s. 72(4)(b)

a local planning authority withdraw from an agreement mentioned in s ubsection (1).

s. 72(5)

Any step taken in relation to the plan must be treated as a step taken by—

s. 72(5)(a)

an authority to which the direction was given or which was a party to the agreement for the purposes of any corresponding plan prepared by them;

s. 72(5)(b)

two or more other authorities to which the direction was given or which were parties to the agreement for the purposes of any corresponding joint local development plan.

s. 72(6)

Any independent examination of a local development plan to which the direction or agreement relates must be suspended.

s. 72(7)

If before the end of the period prescribed for the purposes of this subsection an authority to which the direction was given or which was a party to the agreement requests the Assembly to do so it may direct that—

s. 72(7)(a)

the examination is resumed in relation to the corresponding plan;

s. 72(7)(b)

any step taken for the purposes of the suspended examination has effect for the purposes of the resumed examination.

s. 72(7A)

The Welsh Ministers may by regulations—

s. 72(7A)(a)

specify circumstances in which subsections (5) and (7) are not to apply in relation to an authority;

s. 72(7A)(b)

make provision as to what is a corresponding plan or corresponding joint local development plan.

s. 72(8)

A joint local development plan is a local development plan prepared jointly by two or more local planning authorities.

Miscellaneous

s. 73 — Exclusion of certain representations
s. 73(1)

This section applies to any representation or objection in respect of anything which is done or is proposed to be done in pursuance of—

s. 73(1)(a)

an order or scheme under section 10, 14, 16, 18, 106(1) or (3) or 108(1) of the Highways Act 1980 (c. 66);

s. 73(1)(b)

an order or scheme under section 7, 9, 11, 13 or 20 of the Highways Act 1959 (c. 25), section 3 of the Highways (Miscellaneous Provisions) Act 1961 (c. 63) or section 1 or 10 of the Highways Act 1971 (c. 41) (which provisions were replaced by the provisions mentioned in paragraph (a));

s. 73(1)(c)

an order under section 1 of the New Towns Act 1981 (c. 64).

s. 73(2)

If the Assembly or a local planning authority thinks that a representation made in relation to a local development plan is in substance a representation or objection to which this section applies it or they (as the case may be) may disregard it.

s. 74 — Urban development corporations

The Assembly may direct that this Part (except sections 60 to 60C) does not apply to the area of an urban development corporation.

s. 75 — Guidance

In the exercise of any function conferred under or by virtue of this Part the local planning authority must have regard to any guidance issued by the Assembly.

s. 76 — Annual monitoring report
s. 76(1)

Every local planning authority must make an annual report to the Assembly.

s. 76(2)

The annual report must contain such information as is prescribed as to the extent to which the objectives set out in the local development plan are being achieved.

s. 76(3)

The annual report must—

s. 76(3)(a)

be made at such time as is prescribed;

s. 76(3)(b)

be in such form as is prescribed;

s. 76(3)(c)

contain such other matter as is prescribed.

General

s. 77 — Regulations
s. 77(1)

The Assembly may by regulations make provision in connection with the exercise of functions conferred by this Part on any person.

s. 77(2)

The regulations may in particular make provision as to—

s. 77(2)(a)

the procedure to be followed by the local planning authority in carrying out the appraisal under section 62(6);

s. 77(2)(b)

the procedure to be followed in the preparation of local development plans;

s. 77(2)(c)

requirements about the giving of notice and publicity;

s. 77(2)(d)

requirements about inspection by the public of a plan or any other document;

s. 77(2)(e)

the nature and extent of consultation with and participation by the public in anything done under this Part;

s. 77(2)(f)

the making of representations about any matter to be included in a local development plan;

s. 77(2)(g)

consideration of any such representations;

s. 77(2)(h)

the remuneration and allowances payable to the person appointed to carry out an independent examination under section 64;

s. 77(2)(i)

the time at which anything must be done for the purposes of this Part;

s. 77(2)(j)

the manner of publication of any draft, report or other document published under this Part;

s. 77(2)(k)

monitoring the exercise by local planning authorities of their functions under this Part.

s. 78 — Interpretation
s. 78(1)

Local development plan must be construed in accordance with section 62.

s. 78(2)

Local planning authorities are—

s. 78(2)(a)

county councils in Wales;

s. 78(2)(b)

county borough councils.

s. 78(3)

A National Park authority is the local planning authority for the whole of its area and subsection (2) must be construed subject to that. But—

s. 78(3)(a)

a National Park authority is the local planning authority for the whole of its area;

s. 78(3)(b)

a joint planning board is the local planning authority for the whole of its united district (and references to the area of a local planning authority are, in relation to such a board, to be construed as references to its united district).

s. 78(4)

The Assembly is the National Assembly for Wales.

s. 78(5)

RSS must be construed in accordance with Part 1.

s. 78(6)

This section applies for the purposes of this Part.

Part 7

Crown application of planning Acts

Crown application

s. 79 — Crown application of planning Acts
s. 79(1)

In Part 13 of the principal Act before section 293 (preliminary definitions for Part 13) there is inserted the following section—

s. 79(2)

In the listed buildings Act after section 82 there is inserted the following section—

s. 79(3)

In the hazardous substances Act after section 30 there are inserted the following sections—

s. 79(4)

Schedule 3 amends the planning Acts in relation to the application of those Acts to the Crown.

National security

s. 80 — Special provision relating to national security
s. 80(1)

In section 321 of the principal Act (planning inquiries to be held in public subject to certain exceptions) after subsection (4) there are inserted the following subsections—

s. 80(2)

After section 321 of the principal Act (planning inquiries to be held in public subject to certain exceptions) there is inserted the following section—

s. 80(3)

In Schedule 3 to the listed buildings Act (determination of certain appeals by person appointed by the Secretary of State) after paragraph 6 there is inserted the following paragraph—

s. 80(4)

In the Schedule to the hazardous substances Act (determination of certain appeals by person appointed by the Secretary of State) after paragraph 6 there is inserted the following paragraph—

s. 81 — Special provision relating to national security: Wales
s. 81(1)

After section 321A of the principal Act (inserted by section 80 above) there is inserted the following section—

s. 81(2)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 81(3)

In the Schedule to the hazardous substances Act, after paragraph 7 there is inserted the following paragraph—

Urgent development and works

s. 82 — Urgent Crown development
s. 82(1)

Before section 294 of the principal Act (special enforcement notices in relation to development on Crown land) there is inserted the following section—

s. 82(2)

In section 284 of the principal Act (validity of certain matters) in subsection (3) at the end there is inserted the following paragraph—

s. 83 — Urgent works relating to Crown land
s. 83(1)

After section 82A of the listed buildings Act (inserted by section 79(2)) there is inserted the following section—

s. 83(2)

In section 62 of the listed buildings Act (validity of certain matters) in subsection (2) at the end there is inserted the following paragraph—

Enforcement

s. 84 — Enforcement in relation to Crown land
s. 84(1)

Section 296 of the principal Act (exercise of powers in relation to Crown land) is omitted.

s. 84(2)

After section 296 there are inserted the following sections—

s. 84(3)

After section 82C of the listed buildings Act (inserted by Schedule 3) there are inserted the following sections—

s. 84(4)

After section 30B of the hazardous substances Act (inserted by section 79(3)) there are inserted the following sections—

Trees

s. 85 — Tree preservation orders: Forestry Commissioners

For section 200 of the principal Act (Orders affecting land where Forestry Commissioners interested) there is substituted the following section—

s. 86 — Trees in conservation areas: acts of Crown

After section 211(4) of the principal Act (preservation of trees in conservation areas) there are inserted the following subsections—

Miscellaneous

s. 87 — Old mining permissions
s. 87(1)

Subsection (2) applies if—

s. 87(1)(a)

an old mining permission relates to land which is Crown land, and

s. 87(1)(b)

the permission has not been registered in pursuance of Schedule 2 to the Planning and Compensation Act 1991.

s. 87(2)

Section 22 of and Schedule 2 to that Act apply to the old mining permission subject to the following modifications—

s. 87(2)(a)

in section 22(3) for “May 1, 1991” there is substituted “ the date of commencement of section 87(2) of the Planning and Compulsory Purchase Act 2004 ”;

s. 87(2)(b)

in paragraph 1(3) of Schedule 2 for “the day on which this Schedule comes into force” there is substituted “ the date of commencement of section 87(2) of the Planning and Compulsory Purchase Act 2004 ”.

s. 87(3)

Old mining permission must be construed in accordance with section 22 of the Planning and Compensation Act 1991.

s. 87(4)

Crown land must be construed in accordance with Part 13 of the principal Act.

s. 88 — Subordinate legislation
s. 88(1)

The Secretary of State may by order provide that relevant subordinate legislation applies to the Crown.

s. 88(2)

The order may modify such subordinate legislation to the extent that the Secretary of State thinks appropriate for the purposes of its application to the Crown.

s. 88(3)

Relevant subordinate legislation is an instrument which—

s. 88(3)(a)

is made under or (wholly or in part) for the purposes of any of the planning Acts,

s. 88(3)(b)

is made before the commencement of section 79 of this Act, and

s. 88(3)(c)

is specified in the order.

s. 89 — Crown application: transitional

Schedule 4 (which makes transitional provisions in consequence of the application to the Crown of the planning Acts) has effect.

Crown application

s. 90 — Crown application of Scottish planning Acts
s. 90(1)

In Part 12 of the Town and Country Planning (Scotland) Act 1997, before section 242 (preliminary definitions for Part 12) there is inserted the following section—

s. 90(2)

In the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997, after section 73 (application of Act to land and works of planning authorities) there is inserted the following section —

s. 90(3)

In the Planning (Hazardous Substances) (Scotland) Act 1997, after section 30 (application of Act to planning authorities) there is inserted the following section—

s. 90(4)

Schedule 5 amends the Scottish planning Acts in relation to the application of those Acts to the Crown.

National security

s. 91 — Special provision for certain circumstances where disclosure of information as to national security may occur: Scotland
s. 91(1)

In the Town and Country Planning (Scotland) Act 1997 (c. 8), there is inserted after section 265 (local inquiries) the following section—

s. 91(2)

In Schedule 3 to the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997 (determination of certain appeals by person appointed by the Scottish Ministers), in paragraph 6, after sub-paragraph (6) there is inserted the following sub-paragraph—

s. 91(3)

In the Schedule to the Planning (Hazardous Substances) (Scotland) Act 1997 (determination of certain appeals by person appointed by Scottish Ministers), in paragraph 6, after sub-paragraph (6) there is inserted the following sub-paragraph—

Urgent development and works

s. 92 — Urgent Crown development: Scotland
s. 92(1)

In the Town and Country Planning (Scotland) Act 1997 (c. 8), before section 243 (control of development on Crown land: special enforcement notices) there is inserted the following section—

s. 92(2)

In section 237 of that Act, (validity of certain matters) in subsection (3) at the end there is added the following paragraph—

s. 93 — Urgent works relating to Crown land: Scotland
s. 93(1)

In the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997 (c. 9), after section 73A (inserted by section 90(2)) there is inserted the following section—

s. 93(2)

In section 57 of that Act (validity of certain matters), in subsection (2) at the end there is added the following paragraph—

Enforcement

s. 94 — Enforcement in relation to Crown land: Scotland
s. 94(1)

In the Town and Country Planning (Scotland) Act 1997 (c. 8), section 245 (exercise of powers in relation to Crown land) is omitted.

s. 94(2)

After section 245 there is inserted the following section—

s. 94(3)

In the Town and Country Planning (Scotland) Act 1997 (c. 8), after section 245A (inserted by subsection (2) above) there is inserted the following section—

s. 94(4)

In the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997 (c. 9) after section 73C (inserted by Schedule 5) there are inserted the following sections—

s. 94(5)

In the Planning (Hazardous Substances) (Scotland) Act 1997, after section 30A (inserted by section 90(3)) there are inserted the following sections—

Trees

s. 95 — Tree preservation orders: Scotland

For section 162 of the Town and Country Planning (Scotland) Act 1997 (Orders affecting land where Forestry Commissioners interested) there is substituted the following section—

s. 96 — Trees in conservation areas in Scotland: acts of Crown

In the Town and Country Planning (Scotland) Act 1997 (c. 8), after section 172(4) (preservation of trees in conservation areas) there are inserted the following subsections—

Miscellaneous

s. 97 — Old mining permissions: Scotland
s. 97(1)

Subsection (2) applies if—

s. 97(1)(a)

an old mining permission relates to land which is Crown land, and

s. 97(1)(b)

the permission has not been registered in pursuance of Part 2 of Schedule 8 to the Town and Country Planning (Scotland) Act 1997.

s. 97(2)

Paragraph 10 of that Schedule and that Part apply to the old mining permission subject to the following modifications—

s. 97(2)(a)

in sub-paragraph (3) of that paragraph, for “16th May 1991” there is substituted “ the date of commencement of section 97(2) of the Planning and Compulsory Purchase Act 2004 ”,

s. 97(2)(b)

in paragraph 13(3) of that Part, for “24 January 1992” there is substituted “ the date of commencement of section 97(2) of the Planning and Compulsory Purchase Act 2004 ”.

s. 97(3)

“Old mining permission” must be construed in accordance with paragraph 10 and Part 2 of that Schedule.

s. 97(4)

“Crown land” must be construed in accordance with Part 12 of the Town and Country Planning (Scotland) Act 1997.

s. 98 — Subordinate legislation: Scotland
s. 98(1)

The Scottish Ministers may by order provide that relevant subordinate legislation applies to the Crown.

s. 98(2)

The order may modify such subordinate legislation to the extent that the Scottish Ministers think appropriate for the purposes of its application to the Crown.

s. 98(3)

Relevant subordinate legislation is an instrument which—

s. 98(3)(a)

is made under or (wholly or in part) for the purposes of any of the Scottish planning Acts,

s. 98(3)(b)

is made before the commencement of section 90 of this Act, and

s. 98(3)(c)

is specified in the order.

s. 98(4)

In subsection (3), “instrument” includes an instrument made under an Act of the Scottish Parliament.

Part 8

Compulsory purchase

Acquisition of land for development

s. 99 — Compulsory acquisition of land for development etc
s. 99(1)

Section 226 of the principal Act (compulsory acquisition of land for development and other planning purposes) is amended as follows.

s. 99(2)

In subsection (1)—

s. 99(2)(a)

the first “which” is omitted;

s. 99(2)(b)

for paragraph (a) there is substituted the following paragraph—;

s. 99(2)(c)

in paragraph (b) at the beginning there is inserted “ which ”.

s. 99(3)

After subsection (1) there is inserted the following subsection—

s. 99(4)

Subsection (2) is omitted.

s. 99(5)

Nothing in this section affects a compulsory purchase order made before the commencement of this section.

Authorisation of compulsory acquisition

s. 100 — Procedure for authorisation by authority other than a Minister
s. 100(1)

The Acquisition of Land Act 1981 (c. 67) (the “1981 Act”) is amended as follows.

s. 100(2)

In section 6 (service of documents), in subsection (4)—

s. 100(2)(a)

after “lessee” in each place there is inserted “ , tenant ”;

s. 100(2)(b)

after “ “lessee” there is inserted “ , “tenant”.

s. 100(3)

In section 7 (interpretation), after subsection (2) there is added—

s. 100(4)

In section 11 (notices in newspapers), after subsection (2) there is added—

s. 100(5)

In section 12 (notices to owners, lessees and occupiers)—

s. 100(5)(a)

in subsection (1), for the words from “owner” to “order” (where it first appears) there is substituted “ qualifying person ”;

s. 100(5)(b)

for subsection (2) there is substituted—

s. 100(6)

For section 13 (confirmation of compulsory purchase order) there are substituted the following sections—

s. 100(7)

For section 15 there is substituted—

s. 100(8)

The amendments made by this section do not apply to orders of which notice under section 11 of the 1981 Act has been published before commencement of this section.

s. 101 — Procedure for authorisation by a Minister
s. 101(1)

Schedule 1 to the Acquisition of Land Act 1981 (c. 67) (the “1981 Act”) is amended as follows.

s. 101(2)

In paragraph 2 (notices in newspapers), after sub-paragraph (2) there is added—

s. 101(3)

In paragraph 3 (notices to owners, lessees and occupiers)—

s. 101(3)(a)

in sub-paragraph (1), for the words from “owner” to “order” (where it first appears) there is substituted “ qualifying person ”;

s. 101(3)(b)

for sub-paragraph (2) there is substituted—

s. 101(4)

For paragraph 4 there are substituted the following paragraphs—

s. 101(5)

For paragraph 6 there is substituted—

s. 101(6)

The amendments made by this section do not apply to orders of which notice under paragraph 2 of Schedule 1 to the 1981 Act has been published before commencement of this section.

s. 102 — Confirmation by acquiring authority
s. 102(1)

The Acquisition of Land Act 1981 (c. 67) (the “1981 Act”) is amended as follows.

s. 102(2)

After section 14 there is inserted—

s. 102(3)

The amendments made by this section do not apply to orders of which notice has been published under section 11 of the 1981 Act before commencement of this section.

Valuation date

s. 103 — Assessment of compensation: valuation date
s. 103(1)

The Land Compensation Act 1961 (c. 33) is amended as follows.

s. 103(2)

After section 5 there is inserted—

Advance payments

s. 104 — Compensation: advance payments to mortgagees
s. 104(1)

The Land Compensation Act 1973 is amended as follows.

s. 104(2)

In section 52 (right to advance payment of compensation)—

s. 104(2)(a)

after subsection (1) there are inserted the following subsections—,

s. 104(2)(b)

for subsection (6) there is substituted the following subsection—

s. 104(3)

After section 52 of that Act there are inserted the following sections—

s. 104(4)

In section 52A (right to interest where advance payment made) for subsection (2) there is substituted—

Information

s. 105 — Power to require information
s. 105(1)

The Acquisition of Land Act 1981 (c. 67) is amended as follows.

s. 105(2)

After section 5 (local inquiries) there is inserted—

Loss payments

s. 106 — Basic loss payment
s. 106(1)

After section 33 of the Land Compensation Act 1973 (c. 26) (home loss payments for certain caravan dwellers) there is inserted the following section—

s. 106(2)

Section 33A of the Land Compensation Act 1973 (c. 26) (as inserted by subsection (1) above) does not apply in relation to a pre-commencement acquisition of an interest in land.

s. 106(3)

A pre-commencement acquisition of an interest in land is any of the following—

s. 106(3)(a)

acquisition by means of a compulsory purchase order if the order is made or made in draft before the commencement of this section;

s. 106(3)(b)

acquisition by means of an order made under section 1 or 3 of the Transport and Works Act 1992 (c. 42) (orders relating to certain transport works) if the application for the order was made to the Secretary of State before the commencement of this section;

s. 106(3)(c)

acquisition by means of an order under section 1 or 3 of that Act if the order is made in pursuance of section 7 of that Act (orders made without application) and the order is made in draft before the commencement of this section;

s. 106(3)(d)

acquisition by means of a power contained in an enactment (including a private or local Act) to acquire compulsorily specified land or a specified interest in land if the Bill providing for the power is introduced into Parliament before the commencement of this section.

s. 107 — Occupier’s loss payment
s. 107(1)

After section 33A of the Land Compensation Act 1973 (inserted by section 106 of this Act) there are inserted the following sections—

s. 107(2)

Sections 33B and 33C of the Land Compensation Act 1973 (c. 26) (as inserted by subsection (1) above) do not apply in relation to a pre-commencement acquisition of an interest in land.

s. 107(3)

A pre-commencement acquisition of an interest in land is any of the following—

s. 107(3)(a)

acquisition by means of a compulsory purchase order if the order is made or made in draft before the commencement of this section;

s. 107(3)(b)

acquisition by means of an order made under section 1 or 3 of the Transport and Works Act 1992 (c. 42) (orders relating to certain transport works) if the application for the order was made to the Secretary of State before the commencement of this section;

s. 107(3)(c)

acquisition by means of an order under section 1 or 3 of that Act if the order is made in pursuance of section 7 of that Act (orders made without application) and the order is made in draft before the commencement of this section;

s. 107(3)(d)

acquisition by means of a power contained in an enactment (including a private or local Act) to acquire compulsorily specified land or a specified interest in land if the Bill providing for the power is introduced into Parliament before the commencement of this section.

s. 108 — Loss payments: exclusions
s. 108(1)

After section 33C of the Land Compensation Act 1973 (inserted by section 107 of this Act) there is inserted the following section—

s. 108(2)

Section 33D of the Land Compensation Act 1973 (c. 26) (as inserted by subsection (1) above) does not apply in relation to a notice or order specified in subsection (4) or (5) of that section if the notice or copy of the order was served on a person to whom that section applies before the commencement of this section.

s. 109 — Loss payments: supplementary

After section 33D of the Land Compensation Act 1973 (inserted by section 108 of this Act) there are inserted the following sections—

Corresponding amendments of other enactments

s. 110 — Corresponding amendments of other enactments
s. 110(1)

This section applies to any enactment passed or made before or in the same session as the passing of this Act (other than an enactment amended by this Part) which makes provision—

s. 110(1)(a)

in connection with the compulsory acquisition of an interest in land,

s. 110(1)(b)

creating a power which permits the interference with or affectation of any right in relation to land, or

s. 110(1)(c)

for the payment of any sum in connection with the acquisition, interference or affectation.

s. 110(2)

The Secretary of State may by order amend an enactment to which this section applies for the purpose of making provision which—

s. 110(2)(a)

corresponds to provision made by this Part, or

s. 110(2)(b)

applies any such provision or corresponding provision.

Part 9

Miscellaneous and general

Crown

s. 111 — Crown
s. 111(1)

This Act (except Part 8) binds the Crown.

s. 111(2)

The amendment of an enactment by or by virtue of Part 8 applies to the Crown to the extent that the enactment amended so applies.

Parliament

s. 112 — Parliament

The planning Acts and this Act have effect despite any rule of law relating to Parliament or the law and practice of Parliament.

Miscellaneous

s. 113 — Validity of strategies, plans and documents
s. 113(1)

This section applies to—and anything falling within paragraphs (a) to (g) is referred to in this section as a relevant document.

s. 113(1)(a)

a revision of the regional strategy;

s. 113(1)(b)

the National Development Framework for Wales;

s. 113(1)(ba)

a strategic development plan;

s. 113(1)(bb)

a local plan;

s. 113(1)(bc)

a minerals and waste plan;

s. 113(1)(bd)

a supplementary plan;

s. 113(1)(c)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 113(1)(d)

a local development plan;

s. 113(1)(e)

a revision of a document mentioned in paragraph (b), (ba), (bb), (bc), (bd) or (d);

s. 113(1)(f)

a spatial development strategy;

s. 113(1)(g)

an alteration or replacement of a spatial development strategy,

s. 113(2)

A relevant document must not be questioned in any legal proceedings except in so far as is provided by the following provisions of this section.

s. 113(3)

A person aggrieved by a relevant document may make an application to the High Court on the ground that—

s. 113(3)(a)

the document is not within the appropriate power;

s. 113(3)(b)

a procedural requirement has not been complied with.

s. 113(3A)

An application may not be made under subsection (3) without the leave of the High Court.

s. 113(3B)

An application for leave for the purposes of subsection (3A) must be made before the end of the period of six weeks beginning with the day after the relevant date.

s. 113(4)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 113(5)

The High Court may make an interim order suspending the operation of the relevant document—

s. 113(5)(a)

wholly or in part;

s. 113(5)(b)

generally or as it affects the property of the applicant.

s. 113(5A)

An interim order has effect—

s. 113(5A)(a)

if made on an application for leave, until the final determination of—

s. 113(5A)(a)(i)

the question of whether leave should be granted, or

s. 113(5A)(a)(ii)

where leave is granted, the proceedings on any application under this section made with such leave;

s. 113(5A)(b)

in any other case, until the proceedings are finally determined.

s. 113(6)

Subsection (7) applies if the High Court is satisfied—

s. 113(6)(a)

that a relevant document is to any extent outside the appropriate power;

s. 113(6)(b)

that the interests of the applicant have been substantially prejudiced by a failure to comply with a procedural requirement.

s. 113(7)

The High Court may—

s. 113(7)(a)

quash the relevant document;

s. 113(7)(b)

remit the relevant document to a person or body with a function relating to its preparation, publication, adoption or approval.

s. 113(7A)

If the High Court remits the relevant document under subsection (7)(b) it may give directions as to the action to be taken in relation to the document.

s. 113(7B)

Directions under subsection (7A) may in particular—

s. 113(7B)(a)

require the relevant document to be treated (generally or for specified purposes) as not having been approved or adopted;

s. 113(7B)(b)

require specified steps in the process that has resulted in the approval or adoption of the relevant document to be treated (generally or for specified purposes) as having been taken or as not having been taken;

s. 113(7B)(c)

require action to be taken by a person or body with a function relating to the preparation, publication, adoption or approval of the document (whether or not the person or body to which the document is remitted);

s. 113(7B)(d)

require action to be taken by one person or body to depend on what action has been taken by another person or body.

s. 113(7C)

The High Court's powers under subsections (7) and (7A) are exercisable in relation to the relevant document—

s. 113(7C)(a)

wholly or in part;

s. 113(7C)(b)

generally or as it affects the property of the applicant.

s. 113(8)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

s. 113(9)

The appropriate power is—

s. 113(9)(a)

Part 5 of the Local Democracy, Economic Development and Construction Act 2009 in the case of a revision of the regional strategy;

s. 113(9)(b)

sections 60 to 60C above in the case of the National Development Framework for Wales or a revised Framework;

s. 113(9)(ba)

in the case of a strategic development plan or any revision of it—

s. 113(9)(ba)(i)

section 60M above, and

s. 113(9)(ba)(ii)

sections 63 to 68, 68A(1), 69 to 71 and 73 to 78 above, as they apply in relation to strategic development plans (see section 60N);

s. 113(9)(c)

Part 2 of this Act in the case of a local plan, minerals and waste plan or supplementary plan or any revision of it;

s. 113(9)(d)

sections 62 to 78 above in the case of a local development plan or any revision of it;

s. 113(9)(e)

sections 334 to 343 of the Greater London Authority Act 1999 (c. 29) in the case of the spatial development strategy for London or any alteration or replacement of it.

s. 113(9)(f)

in the case of a spatial development strategy adopted by a combined authority established under section 103 of the Local Democracy, Economic Development and Construction Act 2009, or any alteration or replacement of it, whichever provisions of (or applied by) an order under that Act give the combined authority powers in relation to such a strategy;

s. 113(10)

A procedural requirement is a requirement under the appropriate power or contained in regulations or an order made under that power which relates to the adoption, publication or approval of a relevant document.

s. 113(11)

References to the relevant date must be construed as follows—

s. 113(11)(a)

for the purposes of a revision of the regional strategy, the date when the revision is published by the Secretary of State under Part 5 of Local Democracy, Economic Development and Construction Act 2009;

s. 113(11)(b)

for the purposes of the National Development Framework for Wales (or a revised Framework), the date when it is published by the Welsh Ministers;

s. 113(11)(ba)

for the purposes of a strategic development plan (or a revision of it), the date when it is adopted by the corporate joint committee or approved by the Welsh Ministers (as the case may be);

s. 113(11)(c)

for the purposes of a local plan, minerals and waste plan or supplementary plan (or a revision of it), the date when it is adopted or approved (as the case may be) under Part 2;

s. 113(11)(d)

for the purposes of a local development plan (or a revision of it), the date when it is adopted by a local planning authority in Wales or approved by the National Assembly for Wales (as the case may be);

s. 113(11)(e)

for the purposes of a spatial development strategy (or an alteration or replacement of it), the date when it becomes operative.

s. 113(12)

In this section references to a revision of the regional strategy include a revised strategy under section 79 of the Local Democracy, Economic Development and Construction Act 2009.

s. 113(13)

In this section, “spatial development strategy”, “spatial development strategy for London” and “joint spatial development strategy” must be construed in accordance with section 15LH.

s. 114 — Examinations

An examination of any strategy, document or plan for the purposes of Part 1A, Part 2 or Part 6 of this Act is a statutory inquiry within the meaning of the Tribunals and Inquiries Act 1992 (c. 53).

s. 115 — Grants for advice and assistance

In the principal Act after section 304 (grants for research and education) there is inserted the following section—

s. 116 — Isles of Scilly
s. 116(1)

This Act applies to the Isles of Scilly subject to such exceptions, adaptations and modifications as the Secretary of State may by order direct.

s. 116(2)

An order may in particular provide for—

s. 116(2)(a)

the Council of the Isles of Scilly to enter into arrangements in pursuance of section 4;

s. 116(2)(b)

the exercise by the Council of the Isles of Scilly of any function exercisable by a local planning authority or minerals and waste planning authority under Part 2 or 3.

s. 116(3)

But an order must not be made under this section unless the Secretary of State has consulted the Council of the Isles of Scilly.

s. 117 — Interpretation
s. 117(1)

Expressions used in this Act and in the principal Act have the same meaning in this Act as in that Act.

s. 117(2)

Expressions used in this Act and in the listed buildings Act have the same meaning in this Act as in that Act.

s. 117(3)

Expressions used in this Act and in the hazardous substances Act have the same meaning in this Act as in that Act.

s. 117(4)

The planning Acts are—

s. 117(4)(a)

the principal Act;

s. 117(4)(b)

the listed buildings Act;

s. 117(4)(c)

the hazardous substances Act;

s. 117(4)(d)

the Planning (Consequential Provisions) Act 1990 (c. 11).

s. 117(5)

The principal Act is the Town and Country Planning Act 1990 (c. 8).

s. 117(6)

The listed buildings Act is the Planning (Listed Buildings and Conservation Areas) Act 1990 (c. 9).

s. 117(7)

The hazardous substances Act is the Planning (Hazardous Substances) Act 1990 (c. 10).

s. 117(8)

The Scottish planning Acts are—

s. 117(8)(a)

the Town and Country Planning (Scotland) Act 1997 (c. 8);

s. 117(8)(b)

the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997 (c. 9);

s. 117(8)(c)

the Planning (Hazardous Substances) (Scotland) Act 1997 (c. 10); and

s. 117(8)(d)

the Planning (Consequential Provisions) (Scotland) Act 1997 (c. 11).

General

s. 118 — Amendments
s. 118(1)

Schedule 6 contains amendments of the planning Acts.

s. 118(2)

Schedule 7 contains amendments of other enactments.

s. 118(3)

A reference in Schedule 1 to the National Assembly for Wales (Transfer of Functions) Order 1999 to an enactment amended by this Act must be taken to be a reference to the enactment as so amended.

s. 118(4)

But subsection (3) does not affect such an enactment to the extent that the amendment makes express provision in connection with the exercise of a function in relation to Wales.

s. 119 — Transitionals
s. 119(1)

Schedule 8 contains transitional provisions relating to Parts 1 and 2.

s. 119(2)

The Scottish Ministers may by order make such transitional provision for Scotland, corresponding to the provisions of Schedule 4 and to section 30B of the hazardous substances Act (inserted by section 79(3)), as they consider necessary or expedient.

s. 120 — Repeals

Schedule 9 contains repeals.

s. 121 — Commencement
s. 121(1)

The preceding provisions of this Act (except section 115 and the provisions specified in subsections (4), (5) and (6)) come into force on such day as the Secretary of State may by order appoint.

s. 121(2)

But the Secretary of State must not make an order which relates to any of the following provisions unless he first consults the National Assembly for Wales—

s. 121(2)(a)

Part 3;

s. 121(2)(b)

Part 4, except sections 44 and 55;

s. 121(2)(c)

Part 5;

s. 121(2)(d)

in Part 7, Chapter 1;

s. 121(2)(e)

Part 8;

s. 121(2)(f)

in this Part sections 113, 114, 117, 118 and 120;

s. 121(2)(g)

Schedules 3, 4, 6, 7 and 9.

s. 121(3)

And the Secretary of State must not make an order which relates to section 91 unless he first consults and has the agreement of the Scottish Ministers.

s. 121(3A)

Subsections (1) and (2) are subject to subsection (3B).

s. 121(3B)

Section 43 (power to decline to determine applications) (so far as not in force on the day on which paragraph 7 of Schedule 7 of the Planning Act 2008 comes into force) comes into force on such day as may be appointed by order made by—

s. 121(3B)(a)

the Secretary of State in relation to England;

s. 121(3B)(b)

the Welsh Ministers in relation to Wales.

s. 121(4)

The following provisions come into force on such day as the Scottish Ministers may by order appoint—

s. 121(4)(a)

sections 90 and 92 to 98;

s. 121(4)(b)

Schedule 5;

s. 121(4)(c)

section 117(8);

s. 121(4)(d)

in so far as relating to the Town and Country Planning (Scotland) Act 1997, section 118(2) and Schedule 7;

s. 121(4)(e)

section 119(2); and

s. 121(4)(f)

in so far as relating to that Act, to the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997 or to the Planning (Hazardous Substances) (Scotland) Act 1997, section 120 and Schedule 9.

s. 121(5)

Part 6 comes into force in accordance with provision made by the National Assembly for Wales by order.

s. 121(6)

In Schedule 7, paragraph 10(7) comes into force at the end of the period of two months starting on the day this Act is passed.

s. 122 — Regulations and orders
s. 122(1)

A power to prescribe is (unless express provision is made to the contrary) a power to prescribe by regulations exercisable—

s. 122(1)(zb)

regulations made under section 39A(3);

s. 122(1)(a)

by the Secretary of State in relation to England;

s. 122(1)(b)

by the Welsh Ministers in relation to Wales.

s. 122(2)

References in this section to subordinate legislation are to any order or regulations under this Act.

s. 122(3)

Subordinate legislation—

s. 122(3)(a)

may make different provision for different purposes;

s. 122(3)(b)

may include such supplementary, incidental, consequential, saving or transitional provisions (including provision amending, repealing or revoking enactments) as the person making the subordinate legislation thinks necessary or expedient.

s. 122(4)

A power to make subordinate legislation must be exercised by statutory instrument.

s. 122(5)

A statutory instrument is subject to annulment in pursuance of a resolution of either House of Parliament unless it contains—

s. 122(5)(a)

regulations made by the Secretary of State under section 46;

s. 122(5)(b)

an order under section 98, 116(1) or 119(2);

s. 122(5)(c)

an order under section 110(2);

s. 122(5)(d)

an order under section 121(1) to which subsection (8) applies;

s. 122(5)(e)

an order under section 121(4);

s. 122(5)(f)

provision amending or repealing an enactment contained in an Act;

s. 122(5)(g)

subordinate legislation made by the Welsh Ministers .

s. 122(6)

A statutory instrument mentioned in subsection (5) (za), (zb), (a),(c) or (f) must not be made unless a draft of the instrument has been laid before and approved by resolution of each House of Parliament.

s. 122(6A)

Subsection (6) does not apply in relation to a statutory instrument containing subordinate legislation made by the Welsh Ministers.

s. 122(6B)

The Welsh Ministers must not make a statutory instrument containing subordinate legislation which includes provision amending or repealing an enactment contained in primary legislation unless a draft of the instrument has been laid before and approved by resolution of the National Assembly for Wales.

s. 122(6C)

A statutory instrument containing subordinate legislation made by the Welsh Ministers to which subsection (6B) does not apply is subject to annulment in pursuance of a resolution of the National Assembly for Wales.

s. 122(7)

A statutory instrument containing an order under section 98 or 119(2) is subject to annulment in pursuance of a resolution of the Scottish Parliament.

s. 122(8)

This subsection applies to an order which does not contain provision amending or repealing an enactment contained in an Act.

s. 122(9)

A statutory instrument containing an order under section 121(4), if it includes provision amending or repealing an enactment contained in an Act, must not be made unless a draft of the instrument has been laid before and approved by resolution of the Scottish Parliament.

s. 122(10)

In subsection (3), “enactment” includes an enactment comprised in, or in an instrument made under, an Act of the Scottish Parliament and in subsections (8) and (9), “Act” includes such an Act and “enactment” includes an enactment comprised in such an Act.

s. 122(11)

In subsection (6B), “primary legislation” means—

s. 122(11)(a)

an Act of Parliament;

s. 122(11)(b)

an Act or Measure of the National Assembly for Wales.

s. 123 — Finance
s. 123(1)

There is to be paid out of money provided by Parliament—

s. 123(1)(a)

any expenses of the Secretary of State in making grants in connection with the provision of advice and assistance in relation to the planning Acts;

s. 123(1)(b)

any increase attributable to this Act in the sums payable out of money so provided under any other enactment.

s. 123(2)

There is to be paid into the Consolidated Fund any increase attributable to this Act in the sums so payable under any other enactment.

s. 124 — Extent
s. 124(1)

Except as otherwise provided in this section, this Act extends to England and Wales only.

s. 124(2)

Sections 111(1), 118(2), 120 to 122, this section and section 125 extend also to Scotland.

s. 124(3)

Sections 90 to 98, 117(8) and 119(2) extend to Scotland only.

s. 124(4)

The extent of any amendment, repeal or revocation made by this Act is the same as that of the enactment amended, repealed or revoked.

s. 125 — Short Title

This Act may be cited as the Planning and Compulsory Purchase Act 2004.

Sch 1

Default powers exercisable by Mayor of London , combined authority , combined county authority or county council

Default powers exercisable by Mayor of London

Sch 1 para 1
Sch 1 para 1(1)

This paragraph applies if the Secretary of State thinks that a London borough council, in their capacity as a local planning authority, are failing to do anything it is necessary or expedient for them to do in connection with the preparation, adoption or revision of a local plan.

Sch 1 para 1(2)

If the local plan has not come into effect, the Secretary of State may invite the Mayor of London to take over preparation of the local plan from the London borough council, in which case the Mayor may do so.

Sch 1 para 1(3)

If the local plan has come into effect, the Secretary of State may invite the Mayor of London to revise the local plan, in which case the Mayor may do so.

Sch 1 para 2
Sch 1 para 2(1)

This paragraph applies where a local plan is prepared or revised by the Mayor of London under paragraph 1.

Sch 1 para 2(1A)

If the Mayor of London is to prepare the local plan, the Mayor must publish a document setting out—

Sch 1 para 2(1A)(a)

the Mayor’s timetable for preparing the plan, and

Sch 1 para 2(1A)(b)

if the Mayor intend to depart from anything specified in a local plan timetable in relation to the plan, details of how the Mayor intends to depart from it.

Sch 1 para 2(2)

The Mayor of London must hold an independent examination.

Sch 1 para 2(3)

The Mayor of London—

Sch 1 para 2(3)(a)

must publish the recommendations and reasons of the person appointed to hold the examination, and

Sch 1 para 2(3)(b)

may also give directions to the council in relation to publication of those recommendations and reasons.

Sch 1 para 2(4)

The Mayor of London may then—

Sch 1 para 2(4)(a)

where the Mayor has prepared a local plan, approve the local plan, approve the local plan subject to specified modifications or direct the council to consider adopting the local plan by resolution of the council, or

Sch 1 para 2(4)(b)

where the Mayor is to revise a local plan, make the revision or make the revision subject to specified modifications.

Sch 1 para 3
Sch 1 para 3(1)

Subsections (4) to (12) of section 15D, and section 15DA, apply to an examination held under paragraph 2(2)—

Sch 1 para 3(1)(a)

reading references to the local planning authority as references to the Mayor of London, and

Sch 1 para 3(1)(b)

in the case of an independent examination of a proposed revision, reading references to a local plan as references to the revision.

Sch 1 para 3(2)

The Mayor of London must give reasons for anything he does in pursuance of paragraph 1 or 2(4).

Sch 1 para 3(3)

The council must reimburse the Mayor of London—

Sch 1 para 3(3)(a)

for any expenditure that the Mayor incurs in connection with anything which is done by him under paragraph 1 and which the council failed... to do as mentioned in that paragraph;

Sch 1 para 3(3)(b)

for any expenditure that the Mayor incurs in connection with anything which is done by him under paragraph 2(2).

Sch 1 para 3(4)

In the case of a joint local plan, the Mayor may apportion liability for the expenditure on such basis as the Mayor thinks just between the councils for whom the plan has been prepared.

Default powers exercisable by combined authority

Sch 1 para 4

In this Schedule—“combined authority” means a combined authority established under section 103 of the Local Democracy, Economic Development and Construction Act 2009;“constituent planning authority”, in relation to a combined authority, means—a county council, metropolitan district council or non-metropolitan district council which is the local planning authority for an area within the area of the combined authority, or a joint committee established under section 15J whose area is within, or the same as, the area of the combined authority.

Sch 1 para 5
Sch 1 para 5(1)

This paragraph applies if the Secretary of State thinks that a constituent planning authority are failing to do anything it is necessary or expedient for them to do in connection with the preparation, adoption or revision of a local plan.

Sch 1 para 5(2)

If the local plan has not come into effect, the Secretary of State may invite the combined authority to take over preparation of the local plan from the constituent planning authority, in which case the combined authority may do so.

Sch 1 para 5(3)

If the local plan has come into effect, the Secretary of State may invite the combined authority to revise the local plan, in which case the combined authority may do so.

Sch 1 para 6
Sch 1 para 6(1)

This paragraph applies where a local plan is prepared or revised by a combined authority under paragraph 5.

Sch 1 para 6(1A)

If the combined authority are to prepare the local plan, the combined authority must publish a document setting out—

Sch 1 para 6(1A)(a)

their timetable for preparing the plan, and

Sch 1 para 6(1A)(b)

if they intend to depart from anything specified in a local plan timetable in relation to the plan, details of how they intend to depart from it.

Sch 1 para 6(2)

The combined authority must hold an independent examination.

Sch 1 para 6(3)

The combined authority—

Sch 1 para 6(3)(a)

must publish the recommendations and reasons of the person appointed to hold the examination, and

Sch 1 para 6(3)(b)

may also give directions to the constituent planning authority in relation to publication of those recommendations and reasons.

Sch 1 para 6(4)

The combined authority may then—

Sch 1 para 6(4)(a)

where the combined authority have prepared a local plan, approve the local plan, approve the local plan subject to specified modifications or direct the constituent planning authority to consider adopting the local plan by resolution of the authority, or

Sch 1 para 6(4)(b)

where the combined authority are to revise a local plan, make the revision or make the revision subject to specified modifications.

Sch 1 para 7
Sch 1 para 7(1)

Subsections (4) to (12) of section 15D, and section 15DA, apply to an examination held under paragraph 6(2)—

Sch 1 para 7(1)(a)

reading references to the local planning authority as references to the combined authority, and

Sch 1 para 7(1)(b)

in the case of an independent examination of a proposed revision, reading references to a local plan as references to the revision.

Sch 1 para 7(2)

The combined authority must give reasons for anything they do in pursuance of paragraph 5 or 6(4).

Sch 1 para 7(3)

The constituent planning authority must reimburse the combined authority—

Sch 1 para 7(3)(a)

for any expenditure that the combined authority incur in connection with anything which is done by them under paragraph 5 and which the constituent planning authority failed... to do as mentioned in that paragraph;

Sch 1 para 7(3)(b)

for any expenditure that the combined authority incur in connection with anything which is done by them under paragraph 6(2).

Sch 1 para 7(4)

In the case of a joint local plan, the combined authority may apportion liability for the expenditure on such basis as the authority considers just between the authorities for whom the plan has been prepared.

Default powers exercisable by combined county authority

Sch 1 para 7ZA

In this Schedule—“combined county authority” means a combined county authority established under section 9(1) of the Levelling-up and Regeneration Act 2023;“constituent planning authority” in relation to a combined county authority, means—a county council, metropolitan district council or non-metropolitan district council which is the local planning authority for an area within the area of the combined county authority, or a joint committee established under section 15J whose area is within, or the same as, the area of the combined county authority.

Sch 1 para 7ZB
Sch 1 para 7ZB(1)

This paragraph applies if the Secretary of State thinks that a constituent planning authority are failing to do anything it is necessary or expedient for them to do in connection with the preparation, adoption or revision of a local plan.

Sch 1 para 7ZB(2)

If the local plan has not come into effect, the Secretary of State may invite the combined county authority to take over preparation of the local plan from the constituent planning authority, in which case the combined county authority may do so.

Sch 1 para 7ZB(3)

If the local plan has come into effect, the Secretary of State may invite the combined county authority to revise the local plan, in which case the combined county authority may do so.

Sch 1 para 7ZC
Sch 1 para 7ZC(1)

This paragraph applies where a local plan is prepared or revised by a combined county authority under paragraph 7ZB.

Sch 1 para 7ZC(1A)

If the combined county authority are to prepare the local plan, the combined county authority must publish a document setting out—

Sch 1 para 7ZC(1A)(a)

their timetable for preparing the plan, and

Sch 1 para 7ZC(1A)(b)

if they intend to depart from anything specified in a local plan timetable in relation to the plan, details of how they intend to depart from it.

Sch 1 para 7ZC(2)

The combined county authority must hold an independent examination.

Sch 1 para 7ZC(3)

The combined county authority—

Sch 1 para 7ZC(3)(a)

must publish the recommendations and reasons of the person appointed to hold the examination, and

Sch 1 para 7ZC(3)(b)

may also give directions to the constituent planning authority in relation to publication of those recommendations and reasons.

Sch 1 para 7ZC(4)

The combined county authority may then—

Sch 1 para 7ZC(4)(a)

where the combined county authority have prepared a local plan, approve the local plan subject to specified modifications or direct the constituent planning authority to consider adopting the local plan by resolution of the authority, or

Sch 1 para 7ZC(4)(b)

where the combined county authority are to revise a local plan, make the revision or make the revision subject to specified modifications.

Sch 1 para 7ZD
Sch 1 para 7ZD(1)

Subsections (4) to (12) of section 15D, and section 15DA, apply to an examination held under paragraph 7ZC(2)—

Sch 1 para 7ZD(1)(a)

reading references to the local planning authority as references to the combined county authority, and

Sch 1 para 7ZD(1)(b)

in the case of an independent examination of a proposed revision, reading references to a local plan as references to the revision.

Sch 1 para 7ZD(2)

The combined county authority must give reasons for anything they do in pursuance of paragraph 7ZB or 7ZC(4).

Sch 1 para 7ZD(3)

The constituent planning authority must reimburse the combined county authority—

Sch 1 para 7ZD(3)(a)

for any expenditure that the combined county authority incur in connection with anything which is done by them under paragraph 7ZB and which the constituent planning authority failed... to do as mentioned in that paragraph;

Sch 1 para 7ZD(3)(b)

for any expenditure that the combined county authority incur in connection with anything which is done by them under paragraph 7ZC(2).

Sch 1 para 7ZD(4)

In the case of a joint local plan, the combined county authority may apportion liability for the expenditure on such basis as the authority considers just between the authorities for whom the plan has been prepared.

Default powers exercisable by county council

Sch 1 para 7A

In this Schedule—“upper-tier county council” means a county council for an area for which there is also a district council;“lower-tier planning authority”, in relation to an upper-tier county council, means a district council which is the local planning authority for an area within the area of the upper-tier county council.

Sch 1 para 7B
Sch 1 para 7B(1)

This paragraph applies if the Secretary of State thinks that a lower tier planning authority are failing to do anything it is necessary or expedient for them to do in connection with the preparation, adoption or revision of a local plan.

Sch 1 para 7B(2)

If the local plan has not come into effect, the Secretary of State may invite the upper-tier county council to take over preparation of the local plan from the lower-tier planning authority, in which case the upper-tier county council may do so.

Sch 1 para 7B(3)

If the local plan has come into effect, the Secretary of State may invite the upper-tier county council to revise the local plan, in which case the upper-tier county council may do so.

Sch 1 para 7C
Sch 1 para 7C(1)

This paragraph applies where a local plan is prepared or revised by an upper-tier county council under paragraph 7B.

Sch 1 para 7C(1A)

If the upper-tier county council are to prepare the local plan, the upper-tier county council must publish a document setting out—

Sch 1 para 7C(1A)(a)

their timetable for preparing the plan, and

Sch 1 para 7C(1A)(b)

if they intend to depart from anything specified in a local plan timetable in relation to the plan, details of how they intend to depart from it.

Sch 1 para 7C(2)

The upper-tier county council must hold an independent examination.

Sch 1 para 7C(3)

The upper-tier county council—

Sch 1 para 7C(3)(a)

must publish the recommendations and reasons of the person appointed to hold the examination, and

Sch 1 para 7C(3)(b)

may also give directions to the lower-tier planning authority in relation to publication of those recommendations and reasons.

Sch 1 para 7C(4)

The upper-tier county council may then—

Sch 1 para 7C(4)(a)

where the upper-tier county council have prepared a local plan, approve the local plan, approve the local plan subject to specified modifications or direct the lower-tier planning authority to consider adopting the local plan by resolution of the authority, or

Sch 1 para 7C(4)(b)

where the upper-tier county council are to revise a local plan, make the revision or make the revision subject to specified modifications.

Sch 1 para 7D
Sch 1 para 7D(1)

Subsections (4) to (12) of section 15D, and section 15DA, apply to an examination held under paragraph 7C(2)—

Sch 1 para 7D(1)(a)

reading references to the local planning authority as references to the upper-tier county council, and

Sch 1 para 7D(1)(b)

in the case of an independent examination of a proposed revision, reading references to a local plan as references to the revision.

Sch 1 para 7D(2)

The upper-tier county council must give reasons for anything they do in pursuance of paragraph 7B or 7C(4).

Sch 1 para 7D(3)

The lower-tier planning authority must reimburse the upper-tier county council—

Sch 1 para 7D(3)(a)

for any expenditure that the upper-tier county council incur in connection with anything which is done by them under paragraph 7B and which the lower-tier planning authority failed... to do as mentioned in that paragraph;

Sch 1 para 7D(3)(b)

for any expenditure that the upper-tier county council incur in connection with anything which is done by them under paragraph 7C(2).

Sch 1 para 7D(4)

In the case of a joint local plan, the upper-tier council may apportion liability for the expenditure on such basis as the council considers just between the authorities for whom the plan has been prepared.

Intervention by Secretary of State

Sch 1 para 8
Sch 1 para 8(1)

This paragraph applies to a local plan that has been prepared or a revision of a local plan—

Sch 1 para 8(1)(a)

under paragraph 1 by the Mayor of London,...

Sch 1 para 8(1)(b)

under paragraph 5 by a combined authority,

Sch 1 para 8(1)(ba)

under paragraph 7ZB by a combined county authority, or

Sch 1 para 8(1)(c)

under paragraph 7B by an upper-tier county council.

Sch 1 para 8(2)

If the Secretary of State thinks that a local plan to which this paragraph applies is unsatisfactory—

Sch 1 para 8(2)(a)

he may at any time before the plan is adopted under section 15EA, or approved under paragraph 2(4)(a), 6(4)(a), 7ZC(4)(a) or 7C(4)(a), direct the Mayor of London, the combined authority, the combined county authority or the upper-tier county council to modify the plan in accordance with the direction;

Sch 1 para 8(2)(b)

if he gives such a direction he must state his reasons for doing so.

Sch 1 para 8(3)

Where a direction is given under sub-paragraph (2)—

Sch 1 para 8(3)(a)

the Mayor of London, the combined authority, the combined county authority or the upper-tier county council must comply with the direction;

Sch 1 para 8(3)(b)

the plan must not be adopted or approved unless the Secretary of State gives notice that the direction has been complied with.

Sch 1 para 8(4)

Sub-paragraph (3) does not apply if or to the extent that the direction under sub-paragraph (2) is withdrawn by the Secretary of State.

Sch 1 para 8(5)

At any time before a local plan to which this paragraph applies is adopted under section 15EA, or approved under paragraph 2(4)(a), 6(4)(a), 7ZC(4)(a) or 7C(4)(a), the Secretary of State may direct that the plan(or any part of it) is submitted to him for his approval.

Sch 1 para 8(6)

In relation to a plan or part of a plan submitted to him under sub-paragraph (5) the Secretary of State—The Secretary of State must give reasons for his decision under this sub-paragraph.

Sch 1 para 8(6)(a)

may approve the plan or part;

Sch 1 para 8(6)(b)

may approve it subject to specified modifications;

Sch 1 para 8(6)(c)

may reject it.

Sch 1 para 8(7)

The Secretary of State may at any time—direct the Mayor of London, the combined authority, the combined county authority or the upper-tier county council to withdraw the plan.

Sch 1 para 8(7)(a)

after a local plan to which this paragraph applies has been submitted for independent examination, but

Sch 1 para 8(7)(b)

before it is adopted under section 15EA or approved under paragraph 2(4)(a), 6(4)(a), 7ZC(4)(a) or 7C(4)(a),

Sch 1 para 8(7A)

Sub-paragraphs (2) to (7) and paragraph 9 apply in relation to a revision to a local plan to which this paragraph applies as they apply in relation to a local plan to which this paragraph applies—

Sch 1 para 8(7A)(a)

reading references to the plan being adopted or approved as references to the revision being made, and

Sch 1 para 8(7A)(b)

reading references to paragraph 2(4)(a), 6(4)(a), 7ZC(4)(a) or 7C(4)(a) as references to paragraph 2(4)(b), 6(4)(b), 7ZC(4)(b) or 7C(4)(b).

Sch 1 para 9
Sch 1 para 9(1)

This paragraph applies if the Secretary of State gives a direction under paragraph 8(5).

Sch 1 para 9(2)

No steps are to be taken in connection with the adoption or approval of the plan until the Secretary of State gives his decision, or withdraws the direction.

Sch 1 para 9(3)

If the direction is given, and not withdrawn, before the plan has been submitted for independent examination, the Secretary of State must hold an independent examination.

Sch 1 para 9(4)

If the direction—the person must make his recommendations to the Secretary of State.

Sch 1 para 9(4)(a)

is given after the plan has been submitted for independent examination but before the person appointed to carry out the examination has made his recommendations, and

Sch 1 para 9(4)(b)

is not withdrawn before those recommendations are made,

Sch 1 para 9(5)

The plan has no effect unless the plan or (as the case may be) the relevant part of it has been approved by the Secretary of State, or the direction is withdrawn. The “relevant part” is the part of the plan that—

Sch 1 para 9(5)(a)

is covered by a direction under paragraph 8(5) which refers to only part of the plan, or

Sch 1 para 9(5)(b)

continues to be covered by a direction under paragraph 8(5) following the partial withdrawal of the direction.

Sch 1 para 9(6)

The Secretary of State must publish the recommendations made to him by virtue of sub-paragraph (3) or (4) and the reasons of the person making the recommendations.

Sch 1 para 9(7)

In considering a plan or part of a plan submitted under paragraph 8(5) the Secretary of State may take account of any matter which he thinks is relevant.

Sch 1 para 9(8)

It is immaterial whether any such matter was taken account of by the Mayor of London, the combined authority, the combined county authority or the upper-tier county council.

Sch 1 para 10

Subsections (4) to (12) of section 15D, and section 15DA, apply to an examination of a local plan held under paragraph 9(3)—

Sch 1 para 10(a)

reading references to the local planning authority as references to Secretary of State, and

Sch 1 para 10(b)

in the case of an independent examination of a proposed revision, reading references to a local plan as references to the revision.

Sch 1 para 11

In the exercise of any function under paragraph 8 or 9 the Secretary of State must have regard to the local plan timetable.

Sch 1 para 12

The Mayor of London, the combined authority, the combined county authority or the upper-tier county council must reimburse the Secretary of State for any expenditure incurred by the Secretary of State under paragraph 8 or 9 that is specified in a notice given by him to the Mayor, the authority or the council.

Temporary direction pending possible use of intervention powers

Sch 1 para 13
Sch 1 para 13(1)

If the Secretary of State is considering whether to give a direction to the Mayor of London , a combined authority, a combined county authority or an upper-tier county council under paragraph 8 in relation to a local plan, he may direct the Mayor , the authority or the council not to take any step , or not to take a step specified in the direction, in connection with the plan—

Sch 1 para 13(1)(a)

until the time (if any) specified in the direction, or

Sch 1 para 13(1)(b)

until the direction is withdrawn.

Sch 1 para 13(2)

A plan to which a direction under this paragraph relates has no effect while the direction is in force.

Sch 1 para 13(3)

A direction given under this paragraph in relation to a plan ceases to have effect if a direction is given under paragraph 8 in relation to that plan.

Sch 2

Modification of neighbourhood development plans

Proposals for modification of neighbourhood development plan

Sch 2 para 1
Sch 2 para 1(1)

This Schedule applies if a neighbourhood development plan has effect for a neighbourhood area within the area of a local planning authority.

Sch 2 para 1(2)

A qualifying body is entitled to submit a proposal to the local planning authority for the modification of the neighbourhood development plan.

Sch 2 para 1(3)

The proposal must be accompanied by—

Sch 2 para 1(3)(a)

a draft of the neighbourhood development plan as proposed to be modified (the “draft plan”), and

Sch 2 para 1(3)(b)

a statement which contains a summary of the proposals and sets out the reasons why the plan should be modified as proposed.

Sch 2 para 1(4)

The proposal must—

Sch 2 para 1(4)(a)

be made in the prescribed form, and

Sch 2 para 1(4)(b)

be accompanied by other documents and information of a prescribed description.

Sch 2 para 1(5)

The qualifying body must send to prescribed persons a copy of—

Sch 2 para 1(5)(a)

the proposal,

Sch 2 para 1(5)(b)

the draft plan, and

Sch 2 para 1(5)(c)

such of the other documents and information accompanying the proposal as may be prescribed.

Sch 2 para 1(6)

The Secretary of State may publish a document setting standards for—

Sch 2 para 1(6)(a)

the preparation of a draft of a neighbourhood development plan as proposed to be modified and other documents accompanying the proposal,

Sch 2 para 1(6)(b)

the coverage in any document accompanying the proposal of a matter falling to be dealt with in it, and

Sch 2 para 1(6)(c)

all or any of the collection, sources, verification, processing and presentation of information accompanying the proposal.

Sch 2 para 1(7)

The documents and information accompanying the proposal (including the draft plan) must comply with those standards.

Sch 2 para 2
Sch 2 para 2(1)

A qualifying body may withdraw a proposal at any time before the local planning authority act in relation to the proposal under paragraph 14.

Sch 2 para 2(2)

If—the proposal is to be treated as withdrawn by the qualifying body at that time.

Sch 2 para 2(2)(a)

a proposal by a qualifying body is made by an organisation or body designated as a neighbourhood forum, and

Sch 2 para 2(2)(b)

the designation is withdrawn at any time before the proposal is submitted for independent examination under paragraph 9,

Sch 2 para 2(3)

If the withdrawal of the designation occurs after the proposal is submitted for independent examination under that paragraph, the withdrawal is not to affect the validity of the proposal.

Advice and assistance in connection with proposals

Sch 2 para 3
Sch 2 para 3(1)

A local planning authority must give such advice or assistance to a qualifying body as, in all the circumstance, they consider appropriate for the purpose of, or in connection with, facilitating the making of a proposal for the modification of a neighbourhood development plan for a neighbourhood area within their area.

Sch 2 para 3(2)

Nothing in this paragraph is to be read as requiring the giving of financial assistance.

Requirements to be complied with before proposals made or considered

Sch 2 para 4
Sch 2 para 4(1)

The Secretary of State may by regulations make provision as to requirements that must be complied with before proposals for the modification of a neighbourhood development plan may be submitted to a local planning authority or fall to be considered by a local planning authority.

Sch 2 para 4(2)

The regulations may in particular make provision—

Sch 2 para 4(2)(a)

as to the giving of notice and publicity,

Sch 2 para 4(2)(b)

as to the information and documents that are to be made available to the public,

Sch 2 para 4(2)(c)

as to the making of reasonable charges for anything provided as a result of the regulations,

Sch 2 para 4(2)(d)

as to consultation with and participation by the public,

Sch 2 para 4(2)(e)

as to the making and consideration of representations (including the time by which they must be made),

Sch 2 para 4(2)(f)

requiring prescribed steps to be taken before a proposal of a prescribed description falls to be considered by a local planning authority, and

Sch 2 para 4(2)(g)

conferring powers or imposing duties on local planning authorities, the Secretary of State or other public authorities.

Sch 2 para 4(3)

The power to make regulations under this paragraph must be exercised to secure that—

Sch 2 para 4(3)(a)

prescribed requirements as to consultation with and participation by the public must be complied with before a proposal for the modification of a neighbourhood development plan may be submitted to a local planning authority, and

Sch 2 para 4(3)(b)

a statement containing the following information in relation to that consultation and participation must accompany the proposal submitted to the authority—

Sch 2 para 4(3)(b)(i)

details of those consulted,

Sch 2 para 4(3)(b)(ii)

a summary of the main issues raised, and

Sch 2 para 4(3)(b)(iii)

any other information of a prescribed description.

Consideration of proposals by authority

Sch 2 para 5
Sch 2 para 5(1)

A local planning authority may decline to consider a proposal submitted to them if they consider that it is a repeat proposal.

Sch 2 para 5(2)

A proposal (“the proposal in question”) is a “repeat” proposal for the purposes of this paragraph if it meets conditions A and B.

Sch 2 para 5(3)

Condition A is that—

Sch 2 para 5(3)(a)

in the period of two years ending with the date on which the proposal in question is received, the authority received a proposal under this Schedule (“the earlier proposal”),

Sch 2 para 5(3)(b)

the authority did not make a neighbourhood development plan in response to the earlier proposal as a result of paragraph 8(4) or 14(4) or (8), and

Sch 2 para 5(3)(c)

the earlier proposal was the same as or similar to the proposal in question.

Sch 2 para 5(4)

Condition B is that the local planning authority consider that there has been no significant change in circumstances since the earlier proposal was dealt with as mentioned in sub-paragraph (3)(b).

Sch 2 para 6

If a local planning authority decline to consider a proposal under paragraph 5 they must notify the qualifying body of that fact and of their reasons for declining to consider it.

Sch 2 para 7
Sch 2 para 7(1)

This paragraph applies if—

Sch 2 para 7(1)(a)

a proposal has been made to a local planning authority,

Sch 2 para 7(1)(b)

the authority have not exercised their powers under paragraph 5 to decline to consider it, and

Sch 2 para 7(1)(c)

the authority consider that the modifications contained in the draft plan to which it relates are so significant or substantial as to change the nature of the neighbourhood development plan which the draft plan would replace.

Sch 2 para 7(2)

The local planning authority must instead consider the proposal under paragraph 6 of Schedule 4B to the principal Act (as applied by sections 38A(3) and 38C(5) of this Act).

Sch 2 para 7(3)

That Schedule is to apply in relation to the proposal as if the proposal had been submitted to the local planning authority under that Schedule.

Sch 2 para 8
Sch 2 para 8(1)

This paragraph applies if—

Sch 2 para 8(1)(a)

a proposal has been made to a local planning authority,

Sch 2 para 8(1)(b)

the authority have not exercised their power under paragraph 5 to decline to consider it, and

Sch 2 para 8(1)(c)

paragraph 7 does not apply.

Sch 2 para 8(2)

The authority must consider—

Sch 2 para 8(2)(a)

whether the qualifying body is authorised for the purposes of a neighbourhood development plan to act in relation to the neighbourhood area concerned as a result of section 61F of the principal Act (as applied by section 38C(2)(a) of this Act),

Sch 2 para 8(2)(b)

whether the proposal by the body complies with provision made by or under that section,

Sch 2 para 8(2)(c)

whether the proposal and the documents and information accompanying it (including the draft plan) comply with provision made by or under paragraph 1, and

Sch 2 para 8(2)(d)

whether the body has complied with the requirements of regulations made under paragraph 4 imposed on it in relation to the proposal.

Sch 2 para 8(3)

The authority must also consider whether the draft plan complies with the provision made by or under sections 38A and 38B.

Sch 2 para 8(4)

The authority must—

Sch 2 para 8(4)(a)

notify the qualifying body as to whether or not they are satisfied that the matters mentioned in sub-paragraphs (2) and (3) have been met or complied with, and

Sch 2 para 8(4)(b)

in any case where they are not so satisfied, refuse the proposal and notify the body of their reasons for refusing it.

Requirement to appoint examiner

Sch 2 para 9
Sch 2 para 9(1)

This paragraph applies if—

Sch 2 para 9(1)(a)

a local planning authority have considered the matters mentioned in paragraph 8(2) and (3), and

Sch 2 para 9(1)(b)

they are satisfied that the matters mentioned there have been met or complied with.

Sch 2 para 9(2)

The local planning authority must submit for independent examination—

Sch 2 para 9(2)(a)

the draft plan, and

Sch 2 para 9(2)(b)

such other documents as may be prescribed.

Sch 2 para 9(3)

The authority must make such arrangements as they consider appropriate in connection with the holding of the examination.

Sch 2 para 9(4)

The authority may appoint a person to carry out the examination, but only if the qualifying body consents to the appointment.

Sch 2 para 9(5)

If—the Secretary of State may appoint a person to carry out the examination.

Sch 2 para 9(5)(a)

it appears to the Secretary of State that no person may be appointed under sub-paragraph (4), and

Sch 2 para 9(5)(b)

the Secretary of State considers that it is expedient for an appointment to be made under this sub-paragraph,

Sch 2 para 9(6)

The person appointed must be someone who, in the opinion of the person making the appointment—

Sch 2 para 9(6)(a)

is independent of the qualifying body and the authority,

Sch 2 para 9(6)(b)

does not have an interest in any land that may be affected by the draft plan, and

Sch 2 para 9(6)(c)

has appropriate qualifications and experience.

Sch 2 para 9(7)

The Secretary of State or another local planning authority may enter into arrangements with the authority for the provision of the services of any of their employees as examiners.

Sch 2 para 9(8)

Those arrangements may include—

Sch 2 para 9(8)(a)

provision requiring payments to be made by the authority to the Secretary of State or other local planning authority, and

Sch 2 para 9(8)(b)

other provision in relation to those payments and other financial matters.

What examiner must consider

Sch 2 para 10
Sch 2 para 10(1)

The examiner must first determine whether the modifications contained in the draft plan are so significant or substantial as to change the nature of the neighbourhood development plan which the draft plan would replace.

Sch 2 para 10(2)

The following provisions of this paragraph apply if the examiner determines that the modifications would have that effect.

Sch 2 para 10(3)

The examiner must—

Sch 2 para 10(3)(a)

notify the qualifying body and the local planning authority of the determination, and

Sch 2 para 10(3)(b)

give reasons for the determination.

Sch 2 para 10(4)

The qualifying body must decide whether it wishes to proceed with the proposal or withdraw it, and must notify the examiner and the local planning authority of that decision.

Sch 2 para 10(5)

If the qualifying body notifies the examiner that it wishes to proceed with the proposal, the examiner must consider the draft plan and the documents submitted with it under paragraph 8 of Schedule 4B to the principal Act (as applied by sections 38A(3) and 38C(5) of this Act).

Sch 2 para 10(6)

In that event that Schedule is to apply in relation to the draft plan and the documents submitted with it as if they had been submitted to the examiner under that Schedule.

Sch 2 para 11
Sch 2 para 11(1)

If paragraph 10(2) does not apply, the examiner must consider the following—

Sch 2 para 11(1)(a)

whether the draft plan meets the basic conditions (see sub-paragraph (2));

Sch 2 para 11(1)(b)

whether the draft plan complies with the provision made by or under sections 38A and 38B;

Sch 2 para 11(1)(c)

such other matters as may be prescribed.

Sch 2 para 11(2)

A draft plan meets the basic conditions if—

Sch 2 para 11(2)(a)

having regard to national policies and advice contained in guidance issued by the Secretary of State, it is appropriate to make the plan,

Sch 2 para 11(2)(b)

the making of the plan contributes to the achievement of sustainable development,

Sch 2 para 11(2)(ca)

the making of the plan would not result in the development plan for the area of the authority proposing that less housing is provided by means of development taking place in that area than if the draft plan were not to be made,

Sch 2 para 11(2)(d)

the making of the plan does not breach, and is otherwise compatible with, assimilated obligations,

Sch 2 para 11(2)(da)

any requirements imposed in relation to the plan by or under Part 6 of the Levelling-up and Regeneration Act 2023 (environmental outcomes reports) have been complied with, and

Sch 2 para 11(2)(e)

prescribed conditions are met in relation to the plan and prescribed matters have been complied with in connection with the proposal for the plan.

Sch 2 para 11(3)

The examiner is not to consider any matter that does not fall within sub-paragraph (1) (apart from considering whether the draft plan is compatible with the Convention rights).

Procedure for examination

Sch 2 para 12
Sch 2 para 12(1)

The general rule is that the examination of the issues by the examiner under paragraph 10 or 11 is to take the form of the consideration of written representations.

Sch 2 para 12(2)

But the examiner must cause a hearing to be held for the purpose of receiving oral representations about a particular issue at the hearing—

Sch 2 para 12(2)(a)

in any case where the examiner considers that there are exceptional reasons for doing so, or

Sch 2 para 12(2)(b)

in such other cases as may be prescribed.

Sch 2 para 12(3)

The following persons are entitled to make oral representations about the issue at the hearing—

Sch 2 para 12(3)(a)

the qualifying body,

Sch 2 para 12(3)(b)

the local planning authority, and

Sch 2 para 12(3)(c)

such other persons as may be prescribed.

Sch 2 para 12(4)

The hearing must be in public.

Sch 2 para 12(5)

It is for the examiner to decide how the hearing is to be conducted, including—

Sch 2 para 12(5)(a)

whether a person making oral representations may be questioned by another person and, if so, the matters to which the questioning may relate, and

Sch 2 para 12(5)(b)

the amount of time for the making of a person's oral representations or for any questioning by another person.

Sch 2 para 12(6)

In making decisions about the questioning of a person's oral representations by another, the examiner must apply the principle that the questioning should be done by the examiner except where the examiner considers that questioning by another is necessary to ensure—

Sch 2 para 12(6)(a)

adequate examination of a particular issue, or

Sch 2 para 12(6)(b)

a person has a fair chance to put a case.

Sch 2 para 12(7)

Sub-paragraph (5) is subject to regulations under paragraph 15.

Recommendation by examiner

Sch 2 para 13
Sch 2 para 13(1)

After considering a draft plan under paragraph 11, the examiner must make a report on the draft plan containing recommendations in accordance with this paragraph (and no other recommendations).

Sch 2 para 13(2)

The report must recommend either—

Sch 2 para 13(2)(a)

that the local planning authority should make the draft plan,

Sch 2 para 13(2)(b)

that the local planning authority should make the draft plan with the modifications specified in the report, or

Sch 2 para 13(2)(c)

that the local planning authority should not make the draft plan.

Sch 2 para 13(3)

The only modifications that may be recommended are—

Sch 2 para 13(3)(a)

modifications that the examiner considers need to be made to secure that the draft plan meets the basic conditions mentioned in paragraph 11(2),

Sch 2 para 13(3)(b)

modifications that the examiner considers need to be made to secure that the draft plan is compatible with the Convention rights,

Sch 2 para 13(3)(c)

modifications that the examiner considers need to be made to secure that the draft plan complies with the provision made by or under sections 38A and 38B, and

Sch 2 para 13(3)(d)

modifications for the purpose of correcting errors.

Sch 2 para 13(4)

The report may not recommend that a plan (with or without modifications) should be made if the examiner considers that the plan does not—

Sch 2 para 13(4)(a)

meet the basic conditions mentioned in paragraph 11(2), or

Sch 2 para 13(4)(b)

comply with the provision made by or under sections 38A and 38B.

Sch 2 para 13(5)

The report must—

Sch 2 para 13(5)(a)

give reasons for each of its recommendations, and

Sch 2 para 13(5)(b)

contain a summary of its main findings.

Sch 2 para 13(6)

The examiner must send a copy of the report to the qualifying body and the local planning authority.

Sch 2 para 13(7)

The local planning authority must then arrange for the publication of the report in such manner as may be prescribed.

Functions of authority: modifications proposed by qualifying body

Sch 2 para 14
Sch 2 para 14(1)

This paragraph applies if an examiner has made a report under paragraph 13.

Sch 2 para 14(2)

If the report recommends that the local planning authority should make the draft plan, the authority must do so (subject as follows).

Sch 2 para 14(3)

But if the examiner's report recommends that the authority should make the draft plan with the modifications specified in the report, the authority must make the draft plan with those modifications (subject as follows).

Sch 2 para 14(4)

Sub-paragraph (2) or (3) does not apply if the authority consider that to make the draft plan or (as the case may be) to do so with those modifications would breach, or would otherwise be incompatible with, any assimilated obligation or any of the Convention rights.

Sch 2 para 14(5)

If the authority do not make the draft plan on that ground, they must give reasons to the qualifying body for doing so.

Sch 2 para 14(6)

Where sub-paragraph (2) or (3) applies, the authority may make the draft plan with modifications or (as the case may be) modifications other than those specified in the report if—

Sch 2 para 14(6)(a)

the authority considers the modifications need to be made to secure that the draft plan is compatible with assimilated obligations and the Convention rights, or

Sch 2 para 14(6)(b)

the modifications are for the purpose of correcting errors.

Sch 2 para 14(7)

The authority must make the draft plan or (as the case may be) the draft plan with modifications permitted by this paragraph as soon as reasonably practicable and, in any event, by such date as may be prescribed.

Sch 2 para 14(8)

If the examiner's report recommends that the local planning authority should not make the draft plan, the authority must not make the draft plan.

Regulations about examinations

Sch 2 para 15
Sch 2 para 15(1)

The Secretary of State may by regulations make provision in connection with examinations under paragraph 9.

Sch 2 para 15(2)

The regulations may in particular make provision as to—

Sch 2 para 15(2)(a)

the giving of notice and publicity in connection with an examination,

Sch 2 para 15(2)(b)

the information and documents relating to an examination that are to be made available to the public,

Sch 2 para 15(2)(c)

the making of reasonable charges for anything provided as a result of the regulations,

Sch 2 para 15(2)(d)

the making of written or oral representations in relation to draft plans (including the time by which written representations must be made),

Sch 2 para 15(2)(e)

the written representations which are to be, or which may be or may not be, considered at an examination,

Sch 2 para 15(2)(f)

the refusal to allow oral representations of a prescribed description to be made at a hearing,

Sch 2 para 15(2)(g)

the procedure to be followed at an examination (including the procedure to be followed at a hearing),

Sch 2 para 15(2)(h)

the payment by a local planning authority of remuneration and expenses of the examiner, and

Sch 2 para 15(2)(i)

the award of costs by the examiner.

Sch 2 para 15(3)

The regulations may in particular impose duties on an examiner which are to be complied with by the examiner in considering the draft plan under paragraphs 10 and 11 and which require the examiner—

Sch 2 para 15(3)(a)

to provide prescribed information to each person within sub-paragraph (4);

Sch 2 para 15(3)(b)

to publish a draft report containing the recommendations which the examiner is minded to make in the examiner's report under paragraph 13;

Sch 2 para 15(3)(c)

to invite each person within sub-paragraph (4) or representatives of such a person to one or more meetings at a prescribed stage or prescribed stages of the examination process;

Sch 2 para 15(3)(d)

to hold a meeting following the issuing of such invitations if such a person requests the examiner to do so.

Sch 2 para 15(4)

Those persons are—

Sch 2 para 15(4)(a)

the qualifying body,

Sch 2 para 15(4)(b)

the local planning authority, and

Sch 2 para 15(4)(c)

such other persons as may be prescribed.

Sch 2 para 15(5)

Where the regulations make provision by virtue of sub-paragraph (3)(c) or (d), they may make further provision about—

Sch 2 para 15(5)(a)

the procedure for a meeting;

Sch 2 para 15(5)(b)

the matters to be discussed at a meeting.

Interpretation

Sch 2 para 16

In this Schedule—“the Convention rights” has the same meaning as in the Human Rights Act 1998;“the development plan”—includes a development plan for the purposes of paragraph 1 of Schedule 8 (transitional provisions); does not include so much of a development plan as consists of a neighbourhood development plan under section 38A;“draft plan” has the meaning given by paragraph 1(3);“prescribed” means prescribed by regulations made by the Secretary of State.

Sch 1

Local development orders: procedure

Paragraph

In the principal Act after Schedule 4 (special provision as to land use in 1948) there is inserted the following Schedule—

Sch 2

Timetable for decisions

Decisions

Sch 2 para 1

This Schedule applies to any decision which must be taken by the Secretary of State under—

Sch 2 para 1(a)

section 77 of the principal Act (reference of applications to Secretary of State);

Sch 2 para 1(b)

section 78 of the principal Act (right to appeal against planning decisions).

Sch 2 para 2
Sch 2 para 2(1)

This Schedule also applies to a decision not mentioned in paragraph 1 if each of the following two conditions applies.

Sch 2 para 2(2)

The first condition is that the Secretary of State thinks the decision is connected with a decision mentioned in paragraph 1.

Sch 2 para 2(3)

The second condition is that—

Sch 2 para 2(3)(a)

the Secretary of State is required by virtue of any enactment to take the decision, or

Sch 2 para 2(3)(b)

(in any case to which paragraph (a) does not apply) the Secretary of State by virtue of a power under any enactment directs that the decision must be referred to him.

Sch 2 para 3

But the Secretary of State may by order specify decisions or descriptions of decisions to which a timetable is not to apply.

Timetable

Sch 2 para 4
Sch 2 para 4(1)

The Secretary of State must make one or more timetables for the purposes of decisions to which this Schedule applies.

Sch 2 para 4(2)

A timetable may make different provision for different decisions or different descriptions of decision.

Sch 2 para 4(3)

A timetable—

Sch 2 para 4(3)(a)

has effect from such time as the Secretary of State determines;

Sch 2 para 4(3)(b)

must set out the time within which the decision must be taken;

Sch 2 para 4(3)(c)

may set out the time within which any other step to be taken for the purposes of the decision must be taken.

Sch 2 para 4(4)

A timetable made under this paragraph must be published in such form and manner as the Secretary of State thinks appropriate.

Notice

Sch 2 para 5
Sch 2 para 5(1)

The Secretary of State must notify the following persons as soon as practicable of the published timetable which applies to a decision—

Sch 2 para 5(1)(a)

the applicant or appellant (as the case may be) in relation to the decision;

Sch 2 para 5(1)(b)

the local planning authority for the area to which the decision relates;

Sch 2 para 5(1)(c)

any other person who requests such notification.

Sch 2 para 5(2)

But the Secretary of State may direct that the timetable is subject to such variation as he specifies in the notice under sub-paragraph (1).

Sch 2 para 5(3)

If the Secretary of State acts under sub-paragraph (2) the notice under sub-paragraph (1) must also specify the reasons for the variation.

Sch 2 para 5(4)

The timetable notified under this paragraph is the applicable timetable.

Variation

Sch 2 para 6
Sch 2 para 6(1)

This paragraph applies if before the time at which any step must be taken in accordance with the applicable timetable the Secretary of State thinks that there are circumstances which are likely to prevent the taking of the step at that time.

Sch 2 para 6(2)

The Secretary of State may vary the applicable timetable accordingly.

Sch 2 para 6(3)

If the Secretary of State varies the applicable timetable under sub-paragraph (2) he must notify the persons mentioned in paragraph 5(1) of the variation and the reason for it.

Written reasons

Sch 2 para 7

If the Secretary of State fails to take any step in accordance with the applicable timetable (or that timetable as varied under paragraph 6) he must give written reasons to the persons mentioned in paragraph 5(1).

Annual report

Sch 2 para 8
Sch 2 para 8(1)

The Secretary of State must lay before Parliament a report in respect of each year which—

Sch 2 para 8(1)(a)

reviews his performance under the provisions of this Schedule;

Sch 2 para 8(1)(b)

explains any failure to comply with a timetable.

Sch 2 para 8(2)

The report must be published in such form and manner as the Secretary of State thinks appropriate.

Sch 2A

STRATEGIC PLANNING PANELS

Sch 2A

STATUS AND MEMBERSHIP

Status

Sch 2A para 1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Membership

Sch 2A para 2

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Appointment of local planning authority members

Sch 2A para 3

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Appointment of nominated members

Sch 2A para 4

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Composition of strategic planning panels: further provision

Sch 2A para 5

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Terms and notice of appointments

Sch 2A para 6

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Members' allowances

Sch 2A para 7

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Termination of membership

Sch 2A para 8

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Termination of membership: further provision about local planning authority members

Sch 2A para 9

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Chair and deputy chair

Sch 2A para 10

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Sch 2A

ADMINISTRATION

Staff

Sch 2A para 11

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Delegation

Sch 2A para 12

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Voting rights

Sch 2A para 13

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Procedure

Sch 2A para 14

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Access to meetings

Sch 2A para 15

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Sch 2A

FINANCIAL ARRANGEMENTS

Qualifying expenditure

Sch 2A para 16

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Apportionment of qualifying expenditure

Sch 2A para 17

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Annual work programme and estimate of qualifying expenditure

Sch 2A para 18

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Payments by constituent local planning authorities

Sch 2A para 19

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Payments by Welsh Ministers

Sch 2A para 20

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Accounts and audit

Sch 2A para 21

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Annual report

Sch 2A para 22

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Financial year

Sch 2A para 23

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Sch 2A

SUPPLEMENTARY

Guidance

Sch 2A para 24

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Default powers of Welsh Ministers

Sch 2A para 25

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Provision in connection with establishment etc of strategic planning panel

Sch 2A para 26

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Interpretation

Sch 2A para 27

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Power to amend provisions about strategic planning panels

Sch 2A para 28

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Sch 3

Crown application

Purchase notices

Sch 3 para 1

After section 137 of the principal Act (circumstances in which a purchase notice may be served) there is inserted the following section—

Sch 3 para 2

After section 32 of the listed buildings Act (circumstances in which a purchase notice may be served) there is inserted the following section—

Compulsory acquisition

Sch 3 para 3
Sch 3 para 3(1)

Section 226 of the principal Act (compulsory acquisition of land for development and other planning purposes) is amended as follows.

Sch 3 para 3(2)

After subsection (2) there is inserted the following subsection—

Sch 3 para 3(3)

After subsection (8) there is inserted the following subsection—

Sch 3 para 4
Sch 3 para 4(1)

Section 228 of the principal Act (compulsory acquisition of land by the Secretary of State) is amended as follows.

Sch 3 para 4(2)

After subsection (1) there is inserted the following subsection—

Sch 3 para 4(3)

After subsection (7) there is inserted the following subsection—

Sch 3 para 5
Sch 3 para 5(1)

Section 47 of the listed buildings Act (compulsory acquisition of listed building in need of repair) is amended as follows.

Sch 3 para 5(2)

After subsection (6) there is inserted the following subsection—

Definitions

Sch 3 para 6
Sch 3 para 6(1)

Section 293 of the principal Act (preliminary definitions) is amended as follows.

Sch 3 para 6(2)

In subsection (1) for the definition of “Crown interest” there is substituted the following definition—.

Sch 3 para 6(3)

In subsection (2) after paragraph (b) there is inserted the following paragraph—.

Sch 3 para 6(4)

In subsection (2) after paragraph (e) there are inserted the following paragraphs—

Sch 3 para 6(5)

After subsection (2) there is inserted the following subsection—

Sch 3 para 6(6)

After subsection (3) there are inserted the following subsections—

Sch 3 para 6(7)

After subsection (4) there are inserted the following subsections—

Sch 3 para 7

In the listed buildings Act after section 82B (inserted by section 83(1)) there is inserted the following section—

Sch 3 para 8
Sch 3 para 8(1)

Section 31 of the hazardous substances Act (exercise of powers in relation to Crown land) is amended as follows.

Sch 3 para 8(2)

Subsections (1) and (2) are omitted.

Sch 3 para 8(3)

In subsection (3) for the definition of “Crown interest” there is substituted the following definition—.

Sch 3 para 8(4)

In subsection (5) after paragraph (a) there is inserted the following paragraph—.

Sch 3 para 8(5)

In subsection (5) after paragraph (d) there are inserted the following paragraphs—

Sch 3 para 8(6)

After subsection (6) there are inserted the following subsections—

Special enforcement notices

Sch 3 para 9
Sch 3 para 9(1)

Sections 294 and 295 of the principal Act (control of development on Crown land: special enforcement notices) are omitted.

Sch 3 para 9(2)

But the repeal of sections 294 and 295 does not affect their operation in relation to development carried out before the commencement of this paragraph.

Applications for planning permission, etc.

Sch 3 para 10
Sch 3 para 10(1)

After section 298 of the principal Act (supplementary provision as to Crown and Duchy interests) there is inserted the following section—

Sch 3 para 10(2)

Section 299 of the principal Act is omitted.

Sch 3 para 10(3)

The repeal of section 299 of the principal Act does not does not affect any requirement made in pursuance of regulations made under subsection (5)(b) of that section.

Sch 3 para 11

After section 82E of the listed buildings Act (inserted by section 84) there is inserted the following section—

Sch 3 para 12
Sch 3 para 12(1)

After section 31 of the hazardous substances Act (exercise of powers in relation to Crown land) there is inserted the following section—

Sch 3 para 12(2)

Section 32 of the hazardous substances Act is omitted.

Rights of entry

Sch 3 para 13

After section 325 of the principal Act (supplementary provisions as to rights of entry) there is inserted the following section—

Sch 3 para 14

After section 88B of the listed buildings Act (rights of entry: supplementary provisions) there is inserted the following section—

Sch 3 para 15

After section 36B of the hazardous substances Act (rights of entry: supplementary provisions) there is inserted the following section—

Service of notices

Sch 3 para 16

After section 329 of the principal Act (service of notices) there is inserted the following section—

Information as to interests in land

Sch 3 para 17

After section 330 of the principal Act (power to require information as to interests in land) there is inserted the following section—

Listed buildings and conservation areas

Sch 3 para 18
Sch 3 para 18(1)

Sections 83 and 84 of the listed buildings Act (provisions relating to Crown land) are omitted.

Sch 3 para 18(2)

The repeal of section 84 of the listed buildings Act does not affect any requirement made in pursuance of regulations made under subsection (4)(b) of that section.

Sch 3 para 19
Sch 3 para 19(1)

Section 89(1) of the listed buildings Act (application of certain general provisions of principal Act) is amended as follows.

Sch 3 para 19(2)

After the entry relating to section 329 there is inserted— “ section 329A(1) and (2) (service of notices on the Crown) ”.

Sch 3 para 19(3)

After the entry relating to section 330 there is inserted— “ section 330A(1) to (4) (information as to interests in Crown land) ”.

Hazardous substances

Sch 3 para 20

In section 17 of the hazardous substances Act (revocation of consent on change of control of land) after subsection (2) there is inserted the following subsection—

Sch 3 para 21
Sch 3 para 21(1)

Section 37(2) of the hazardous substances Act (application of certain general provisions of the principal Act) is amended as follows.

Sch 3 para 21(2)

After the entry relating to section 329 there is inserted— “ section 329A(1) and (2) (service of notices on the Crown) ”.

Sch 3 para 21(3)

After the entry relating to section 330 there is inserted— “ section 330A(1) to (4) (information as to interests in Crown land) ”.

Miscellaneous

Sch 3 para 22

Section 293(4) of the principal Act (certain persons treated as having an interest in Crown land) is omitted.

Sch 3 para 23

Section 297 of the principal Act (agreements relating to Crown land) is omitted.

Sch 3 para 24
Sch 3 para 24(1)

Section 298 of the principal Act (supplementary provisions as to Crown and Duchy interests) is amended as follows.

Sch 3 para 24(2)

Subsections (1) and (2) are omitted.

Sch 3 para 24(3)

In subsection (3) after “in which there is” there is inserted “ a Crown interest or ”.

Sch 3 para 25

Section 299A of the principal Act (Crown planning obligations) is omitted.

Sch 3 para 26
Sch 3 para 26(1)

Section 300 of the principal Act (tree preservation orders in anticipation of disposal of Crown land) is omitted.

Sch 3 para 26(2)

But the repeal of section 300 does not affect its operation in relation to a tree preservation order made by virtue of that section before the commencement of this paragraph.

Sch 3 para 27
Sch 3 para 27(1)

Section 301 of the principal Act (requirement of planning permission for continuance of use instituted by the Crown) is omitted.

Sch 3 para 27(2)

But the repeal of section 301 does not affect its operation in relation to an agreement made as mentioned in subsection (1) of that section before the commencement of this paragraph.

Sch 4

Transitional provisions: Crown application

Sch 4

The principal Act

Introduction

Sch 4 para 1

This Part applies to a development if—

Sch 4 para 1(a)

it is a development for which before the relevant date no planning permission is required,

Sch 4 para 1(b)

it is not a development or of a description of development for which planning permission is granted by virtue of a development order, and

Sch 4 para 1(c)

before the relevant date proposed development notice had been given to the local planning authority.

Sch 4 para 2

In this Part—

Sch 4 para 2(a)

the relevant date is the date of commencement of section 79(1);

Sch 4 para 2(b)

proposed development notice is notice of a proposal for development given by the developer in pursuance of arrangements made by the Secretary of State in relation to development by or on behalf of the Crown;

Sch 4 para 2(c)

the developer is the Crown or a person acting on behalf of the Crown.

Acceptable development

Sch 4 para 3
Sch 4 para 3(1)

This paragraph applies if before the relevant date in pursuance of the arrangements either the local planning authority have or the Secretary of State has given notice to the developer that they or he (as the case may be) find the proposed development acceptable.

Sch 4 para 3(2)

The notice must be treated as if it is planning permission granted under Part 3 of the principal Act.

Sch 4 para 3(3)

If the notice is subject to conditions the conditions have effect as if they are conditions attached to the planning permission.

Sch 4 para 4
Sch 4 para 4(1)

This paragraph applies if before the relevant date the local planning authority have in pursuance of the arrangements kept a register of proposed development notices.

Sch 4 para 4(2)

The register must be treated as if it is part of the register kept by them in pursuance of section 69 of the principal Act.

Referred proposals

Sch 4 para 5
Sch 4 para 5(1)

This paragraph applies if—

Sch 4 para 5(1)(a)

before the relevant date the local planning authority have notified the developer in pursuance of the arrangements that they do not find the development acceptable, and

Sch 4 para 5(1)(b)

the matter has been referred to but not decided by the Secretary of State.

Sch 4 para 5(2)

This paragraph also applies if—

Sch 4 para 5(2)(a)

before the relevant date the local planning authority have notified the developer in pursuance of the arrangements that they find the development acceptable subject to conditions, and

Sch 4 para 5(2)(b)

the matter has been referred to but not decided by the Secretary of State.

Sch 4 para 5(3)

The Secretary of State must deal with the proposal as if it is an appeal by an applicant for planning permission under section 78 of the principal Act.

Pending proposals

Sch 4 para 6
Sch 4 para 6(1)

This paragraph applies if before the relevant date—

Sch 4 para 6(1)(a)

proposed development notice has been given, but

Sch 4 para 6(1)(b)

the local planning authority have not given notice to the developer as mentioned in paragraph 3 or 5.

Sch 4 para 6(2)

The principal Act applies as if the proposal is an application for planning permission duly made under Part 3 of that Act.

Sch 4

The listed buildings Act

Introduction

Sch 4 para 7

This Part applies to works if—

Sch 4 para 7(a)

they are works for which before the relevant date no listed building consent is required, and

Sch 4 para 7(b)

before the relevant date proposed works notice had been given to the local planning authority.

Sch 4 para 8

In this Part—

Sch 4 para 8(a)

the relevant date is the date of commencement of section 79(1);

Sch 4 para 8(b)

proposed works notice is notice of a proposal for works given by the person proposing to carry out the works (the developer) in pursuance of arrangements made by the Secretary of State in relation to development by or on behalf of the Crown;

Sch 4 para 8(c)

the developer is the Crown or a person acting on behalf of the Crown.

Acceptable works

Sch 4 para 9
Sch 4 para 9(1)

This paragraph applies if before the relevant date in pursuance of the arrangements either the local planning authority have or the Secretary of State has given notice to the developer that they or he (as the case may be) find the proposed works acceptable.

Sch 4 para 9(2)

The notice must be treated as if it is listed building consent granted under the listed buildings Act.

Sch 4 para 9(3)

If the notice is subject to conditions the conditions have effect as if they are conditions attached to the consent.

Sch 4 para 10
Sch 4 para 10(1)

This paragraph applies if before the relevant date the local planning authority have in pursuance of the arrangements kept a register of proposed works notices.

Sch 4 para 10(2)

The register must be treated as if it is part of the register kept by them in pursuance of the listed buildings Act.

Referred proposals

Sch 4 para 11
Sch 4 para 11(1)

This paragraph applies if—

Sch 4 para 11(1)(a)

before the relevant date the local planning authority have notified the developer in pursuance of the arrangements that they do not find the works acceptable, and

Sch 4 para 11(1)(b)

the matter has been referred to but not decided by the Secretary of State.

Sch 4 para 11(2)

This paragraph also applies if—

Sch 4 para 11(2)(a)

before the relevant date the local planning authority have notified the developer in pursuance of the arrangements that they find the works acceptable subject to conditions, and

Sch 4 para 11(2)(b)

the matter has been referred to but not decided by the Secretary of State.

Sch 4 para 11(3)

The Secretary of State must deal with the proposal as if it is an appeal by an applicant for listed building consent under section 20 of the listed buildings Act.

Pending proposals

Sch 4 para 12
Sch 4 para 12(1)

This paragraph applies if before the relevant date—

Sch 4 para 12(1)(a)

proposed works notice has been given, but

Sch 4 para 12(1)(b)

the local planning authority have not given notice to the developer as mentioned in paragraph 9 or 11.

Sch 4 para 12(2)

The listed buildings Act applies as if the proposal is an application for listed building consent duly made under that Act.

Sch 5

Crown application: Scotland

Purchase notices

Sch 5 para 1

In the Town and Country Planning (Scotland) Act 1997 (c. 8) (referred to in this Schedule as the “principal Scottish Act”), there is inserted after section 88 (circumstances in which purchase notices may be served) the following section—

Sch 5 para 2

In the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997 (c. 9) (referred to in this Schedule as the “Scottish listed buildings Act”), after section 28 (circumstances in which purchase notices may be served) there is inserted the following section—

Compulsory acquisition

Sch 5 para 3
Sch 5 para 3(1)

In the principal Scottish Act, section 189 (compulsory acquisition of land for development and other planning purposes) is amended as follows.

Sch 5 para 3(2)

After subsection (2) there is inserted the following subsection—

Sch 5 para 3(3)

After subsection (8) there is inserted the following subsection—

Sch 5 para 4
Sch 5 para 4(1)

Section 190 of that Act (compulsory acquisition of land by Secretary of State for the Environment) is amended as follows.

Sch 5 para 4(2)

After subsection (1) there is inserted the following subsection—

Sch 5 para 4(3)

After subsection (7) there is added the following subsection—

Sch 5 para 5
Sch 5 para 5(1)

In the Scottish listed buildings Act, section 42 (compulsory acquisition of listed building in need of repair) is amended as follows.

Sch 5 para 5(2)

After subsection (6) there is inserted the following subsection—

Definitions

Sch 5 para 6
Sch 5 para 6(1)

In the principal Scottish Act, section 242 (preliminary definitions) is amended as follows.

Sch 5 para 6(2)

In subsection (1) for the definition of “Crown interest” there is substituted the following definition—.

Sch 5 para 6(3)

In subsection (2) after paragraph (b) there is inserted the following paragraph—.

Sch 5 para 6(4)

After subsection (2) there is inserted the following subsection—

Sch 5 para 6(5)

After subsection (3) there is inserted the following subsection—

Sch 5 para 6(6)

After subsection (4) there are inserted the following subsections—

Sch 5 para 7

In the Scottish listed buildings Act, after section 73B (inserted by section 93(1)), there is inserted the following section—

Sch 5 para 8
Sch 5 para 8(1)

In the Planning (Hazardous Substances) (Scotland) Act 1997 (c. 10) (referred to in this Schedule as the “Scottish hazardous substances Act”), section 31 (exercise of powers in relation to Crown land) is amended as follows.

Sch 5 para 8(2)

Subsections (1) and (2) are omitted.

Sch 5 para 8(3)

In subsection (3) for the definition of “Crown interest” there is substituted the following definition—

Sch 5 para 8(4)

In subsection (5) after paragraph (b) there is inserted the following paragraph—.

Sch 5 para 8(5)

After subsection (6) there are inserted the following subsections—

Special enforcement notices

Sch 5 para 9
Sch 5 para 9(1)

Sections 243 and 244 of the principal Scottish Act (control of development on Crown land: special enforcement notices) are omitted.

Sch 5 para 9(2)

But the repeal of sections 243 and 244 does not affect their operation in relation to development carried out before the commencement of this paragraph.

Applications for planning permission, etc.

Sch 5 para 10
Sch 5 para 10(1)

In the principal Scottish Act, after section 247 (supplementary provision as to Crown interest) there is inserted the following section—

Sch 5 para 10(2)

Section 248 (application for planning permission etc. in anticipation of disposal of Crown land) is omitted.

Sch 5 para 10(3)

The repeal of that section does not affect any requirement made in pursuance of regulations made under subsection (5)(b) of that section.

Sch 5 para 11

After section 73E of the Scottish listed buildings Act (inserted by section 94(4)) there is inserted the following section—

Sch 5 para 12

In the Scottish hazardous substances Act, section 32 (application for hazardous substances consent in anticipation of disposal of Crown land) is omitted.

Sch 5 para 13

Before section 33 of that Act there is inserted—

Rights of entry

Sch 5 para 14

After section 270 of the principal Scottish Act (supplementary provisions as to rights of entry) there is inserted the following section—

Sch 5 para 15

After section 78 of the Scottish listed buildings Act (rights of entry: supplementary provisions) there is inserted the following section—

Sch 5 para 16

After section 35 of the Scottish hazardous substances Act (rights of entry: supplementary provisions) there is inserted the following section—

Service of notices

Sch 5 para 17

After section 271 of the principal Scottish Act (service of notices) there is inserted the following section—

Information as to interests in land

Sch 5 para 18

In the principal Scottish Act, after section 272 (power to require information as to interests in land) there is inserted the following section—

Listed buildings and conservation areas

Sch 5 para 19
Sch 5 para 19(1)

In the Scottish listed buildings Act, sections 74 and 75 (provisions relating to Crown land) are omitted.

Sch 5 para 19(2)

The repeal of section 75 does not affect any requirement made in pursuance of regulations made under subsection (4)(b) of that section.

Sch 5 para 20
Sch 5 para 20(1)

In the Scottish listed buildings Act, section 79 (application of certain general provisions of the principal Scottish Act) is amended as follows.

Sch 5 para 20(2)

In subsection (1)—

Sch 5 para 20(2)(a)

after the entry relating to section 265 there is inserted— “ section 265A (planning inquiries to be held in public subject to certain exceptions), ”,

Sch 5 para 20(2)(b)

after the entry relating to section 271 there is inserted— “ section 271A(1) and (2) (service of notices on the Crown), ”, and

Sch 5 para 20(2)(c)

after the entry relating to section 272 there is inserted— “ section 272A(1) to (4) (information as to interests in Crown land), ”.

Sch 5 para 20(3)

After subsection (2) there is inserted the following subsection—

Hazardous substances

Sch 5 para 21

In the Scottish hazardous substances Act, in section 15 (revocation of consent on change of control of land) after subsection (2) there is inserted the following subsection—

Sch 5 para 22
Sch 5 para 22(1)

In the Scottish hazardous substances Act, section 36 (application of certain general provisions of the principal Scottish Act) is amended as follows—

Sch 5 para 22(1)(a)

after the entry relating to section 265 there is inserted— “ section 265A (planning inquiries to be held in public subject to certain exceptions), ”,

Sch 5 para 22(1)(b)

after the entry relating to section 271 there is inserted— “ section 271A(1) to (2) (service of notices on the Crown), ”, and

Sch 5 para 22(1)(c)

after the entry relating to section 272 there is inserted— “ section 272A(1) to (4) (information as to interests in Crown land), ”.

Sch 5 para 22(2)

The existing provision as so amended becomes subsection (1), and after that subsection there is added—

Miscellaneous

Sch 5 para 23

Sections 242(4) (certain persons treated as having an interest in Crown land) and 246 (agreements relating to Crown land) of the principal Scottish Act are omitted.

Sch 5 para 24

In the principal Scottish Act, for section 247 (supplementary provisions as to Crown interest) there is substituted the following section—

Sch 5 para 25
Sch 5 para 25(1)

In the principal Scottish Act, section 249 (tree preservation orders in anticipation of disposal of Crown land) is omitted.

Sch 5 para 25(2)

But the repeal of section 249 does not affect its operation in relation to a tree preservation order made by virtue of that section before the commencement of this paragraph.

Sch 5 para 26
Sch 5 para 26(1)

In the principal Scottish Act, section 250 (requirement of planning permission for continuance of use instituted by the Crown) is omitted.

Sch 5 para 26(2)

But the repeal of section 250 does not affect its operation in relation to an agreement made as mentioned in subsection (1) of that section before the commencement of this paragraph.

Sch 6

Amendments of the planning Acts

Town and Country Planning Act 1990 (c. 8)

Sch 6 para 1

The Town and Country Planning Act 1990 is amended as follows.

Sch 6 para 2

In section 55(2)(b) (meaning of development) the word “local” is omitted.

Sch 6 para 3

For section 69 there is substituted the following section—

Sch 6 para 4

Section 76 (Duty to draw attention to certain provisions for benefit of disabled) is omitted.

Sch 6 para 5

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Sch 6 para 6

In section 108 (compensation for refusal of planning permission formerly granted by development order) after subsection (3) there is inserted the following subsection—

Sch 6 para 7
Sch 6 para 7(1)

In section 245 (modification of incorporated enactments), subsections (2) and (3) are omitted.

Sch 6 para 7(2)

The amendments made by sub-paragraph (1) do not apply to compulsory purchase orders of which notice under section 11 of or, as the case may be, paragraph 2 of Schedule 1 to the Acquisition of Land Act 1981 (c. 67) is published before commencement of this paragraph.

Sch 6 para 8

In section 284(1) (restriction on challenge to validity of certain documents), paragraph (a) is omitted.

Sch 6 para 9
Sch 6 para 9(1)

Section 287 (procedure for questioning the validity of certain matters) is amended as follows.

Sch 6 para 9(2)

For subsections (1) to (3) there are substituted the following subsections—

Sch 6 para 9(3)

In subsection (5)—

Sch 6 para 9(3)(a)

paragraph (a) is omitted;

Sch 6 para 9(3)(b)

in each of paragraphs (b) to (e) the words “by virtue of subsection (3)” are omitted.

Sch 6 para 9(4)

Subsection (6) is omitted.

Sch 6 para 10
Sch 6 para 10(1)

Section 296 (exercise of powers in relation to Crown land) is amended as follows.

Sch 6 para 10(2)

In subsection (1) for paragraph (a) there is substituted the following paragraph—.

Sch 6 para 10(3)

After subsection (1) there is inserted the following subsection—

Sch 6 para 11
Sch 6 para 11(1)

Section 303A (recovery of costs of certain inquiries) is amended as follows.

Sch 6 para 11(2)

For subsection (1) there are substituted the following subsections—

Sch 6 para 11(3)

In each of subsections (2) to (6) and (10)(a) in each place where it occurs—

Sch 6 para 11(3)(a)

for “Secretary of State” there is substituted “ appropriate authority ”;

Sch 6 para 11(3)(b)

for “him” there is substituted “ it ”;

Sch 6 para 11(3)(c)

for “he” there is substituted “ it ”.

Sch 6 para 11(4)

In each of subsections (2), (4), (5) and (6) in each place where it occurs for “inquiry” there is substituted “ procedure ”.

Sch 6 para 11(5)

In subsection (5) each of the following is omitted—

Sch 6 para 11(5)(a)

“or appointed as one of the persons who are to hold it”;

Sch 6 para 11(5)(b)

“(in addition to what may be recovered by virtue of the appointment of any other person)”;

Sch 6 para 11(5)(c)

in paragraph (c), “(or, in a case where that person is appointed as one of the persons who are to hold the qualifying inquiry, an appropriate proportion of any costs attributable to the appointment of an assessor to assist those persons)”.

Sch 6 para 11(6)

Subsections (7) to (9) are omitted.

Sch 6 para 11(7)

Before subsection (10) there is inserted the following subsection—

Sch 6 para 12

In section 306 (2) (local authorities and statutory undertakers may contribute to certain costs of local planning authorities) for paragraph (a) there are substituted the following paragraphs—

Sch 6 para 13

In section 324(1) (rights of entry) for paragraph (a) there is substituted the following paragraph—

Sch 6 para 14
Sch 6 para 14(1)

Section 333 (provision about regulations and orders) is amended as follows.

Sch 6 para 14(2)

After subsection (2) there is inserted the following subsection—

Sch 6 para 15

In section 336(1) (interpretation) for the definition of development plan there is substituted—.

Sch 6 para 16
Sch 6 para 16(1)

Schedule 1 (distribution of functions of local planning authorities) is amended as follows.

Sch 6 para 16(2)

Paragraph 2 is omitted.

Sch 6 para 16(3)

In paragraph 3(7) the words “but paragraph 4 shall apply to such applications instead” are omitted.

Sch 6 para 16(4)

For paragraph 7 there is substituted the following paragraph—

Sch 6 para 17

In Schedule 2 (transitional provisions relating to development plans) Parts 1, 2 and 3 are omitted.

Sch 6 para 18
Sch 6 para 18(1)

Schedule 13 (blighted land) is amended as follows.

Sch 6 para 18(2)

Paragraphs 1 to 4 are omitted.

Sch 6 para 18(3)

The following paragraph is inserted as paragraph 1A—

Sch 6 para 18(4)

In paragraph 5 for “any such functions as are mentioned in paragraph 1(a)(i) or (ii)” there is substituted “ relevant public functions (within the meaning of paragraph 1A) ”.

Sch 6 para 18(5)

In paragraph 6 for “any such functions as are mentioned in paragraph 5” there is substituted “ relevant public functions (within the meaning of paragraph 1A) ”.

Sch 6 para 18(6)

In paragraph 13, for “paragraphs 1, 2, 3 and 4” there is substituted “ paragraph 1A ”.

Planning (Listed Buildings and Conservation Areas) Act 1990 (c. 9)

Sch 6 para 19

The Planning (Listed Buildings and Conservation Areas) Act 1990 is amended as follows.

Sch 6 para 20

In section 10(3) (regulations relating to applications for listed building consent)—

Sch 6 para 20(a)

for paragraph (b) and the word “and” following it there is substituted the following paragraph—;

Sch 6 para 20(b)

after paragraph (c) there are inserted the following paragraphs—

Sch 6 para 21

In section 23(2) (matters to which regard is to be had by local planning authority in exercising function of revoking or modifying consent) for “the development plan and to any other” there is substituted “ any ”.

Sch 6 para 22

In section 26(2) (matters to which regard is to be had by the Secretary of State in exercising function of revoking or modifying consent) for “the development plan and to any other” there is substituted “ any ”.

Sch 6 para 23

In section 67 (publicity for applications affecting the setting of listed buildings) for subsections (1) to (7) there is substituted the following subsection—

Sch 6 para 24

In section 73 (publicity for applications affecting conservation areas) for subsection (1) there is substituted the following subsection—

Sch 6 para 25

In section 91(2) (interpretation) “ “development plan”” is omitted.

Sch 6 para 26

In section 93 (provision about regulations and orders) after subsection (6) there are inserted the following subsections—

Planning (Hazardous Substances) Act 1990 (c. 10)

Sch 6 para 27

In section 40 of the Planning (Hazardous Substances) Act 1990 (provision about regulations) after subsection (3) there is inserted the following subsection—

Sch 7

Amendments of other enactments

Gas Act 1965 (c. 36)

Sch 7 para 1

In paragraph 7(2) of Schedule 3 of the Gas Act 1965 after “development order” there is inserted “ or local development order ”.

Finance Act 1969 (c. 32)

Sch 7 para 2

In section 58(4) of the Finance Act 1969 (disclosure of information for statistical purposes), in the Table in the entry relating to local planning authorities—

Sch 7 para 2(a)

in the first column for “the Town and Country Planning Act 1990” there is substituted “ Part 2 or 6 of the Planning and Compulsory Purchase Act 2004 ”;

Sch 7 para 2(b)

In the second column for “Part II of the Town and Country Planning Act 1990” there is substituted “ Part 2 or 6 of the Planning and Compulsory Purchase Act 2004 ”.

Leasehold Reform Act 1967 (c. 88)

Sch 7 para 3

In section 28(6)(a) of the Leasehold Reform Act 1967 (development for certain public purposes) for “Town and Country Planning Act 1990” there is substituted “ Planning and Compulsory Purchase Act 2004 ”.

Agriculture (Miscellaneous Provisions) Act 1968 (c. 34)

Sch 7 para 4

In section 12 of the Agriculture (Miscellaneous Provisions) Act 1968 after subsection (3) there is inserted the following subsection—

Countryside Act 1968 (c. 41)

Sch 7 para 5
Sch 7 para 5(1)

Paragraph 3 of Schedule 2 to the Countryside Act 1968 is amended as follows.

Sch 7 para 5(2)

In sub-paragraph (2), after “published” there is inserted “ , affixed ”.

Sch 7 para 5(3)

In sub-paragraph (4)(a), after “published” there is inserted “ , affixed ”.

Sch 7 para 5(4)

The amendments made by this paragraph do not apply to compulsory purchase orders of which notice under section 11 of the Acquisition of Land Act 1981 (c. 67) is published before commencement of this paragraph.

Greater London Council (General Powers) Act 1969 (c lii)

Sch 7 para 6

In section 13 of the Greater London Council (General Powers) Act 1969 (exercise of powers relating to walkways), in the proviso for the words from “any local plan” to “Schedule 1 to that Act)” there is substituted “ a local development document (within the meaning of Part 2 of the Planning and Compulsory Purchase Act 2004) ”.

Land Compensation Act 1973 (c. 26)

Sch 7 para 7
Sch 7 para 7(1)

The Land Compensation Act 1973 is amended as follows.

Sch 7 para 7(2)

In section 29 (home loss payments) after subsection (3A) there is inserted the following subsection—

Sch 7 para 7(3)

Sections 34 to 36 are omitted.

Sch 7 para 7(4)

In section 87(1) (general interpretation) in the definition of “dwelling” “(except in section 29)” is omitted.

Sch 7 para 7(5)

But the amendments made by this paragraph do not have effect in relation to a compulsory purchase order made or made in draft before the commencement of this paragraph.

Greater London Council (General Powers) Act 1973 (c xxx)

Sch 7 para 8

In section 24(4) of the Greater London Council (General Powers) Act 1973 (definitions for the purpose or provision relating to parking place agreements)—

Sch 7 para 8(a)

in the definition of appropriate provision for “the Greater London” there is substituted “ their ”;

Sch 7 para 8(b)

in the second place where it occurs “Greater London development plan” is omitted.

Welsh Development Agency Act 1975 (c. 70)

Sch 7 para 9
Sch 7 para 9(1)

Schedule 4 to the Welsh Development Agency Act 1975 is amended as follows.

Sch 7 para 9(2)

Paragraph 2 is omitted.

Sch 7 para 9(3)

In paragraph 3, in sub-paragraph (1)(c), for “section 13 of that Act to objections made by an owner, lessee or occupier” there is substituted “ sections 13 and 13A of that Act to relevant objections ”.

Sch 7 para 9(4)

The amendments made by this paragraph do not apply to compulsory purchase orders of which notice under section 11 of the Acquisition of Land Act 1981 (c. 67) is published before commencement of this paragraph.

Local Government, Planning and Land Act 1980 (c. 65)

Sch 7 para 10
Sch 7 para 10(1)

The Local Government, Planning and Land Act 1980 is amended as follows.

Sch 7 para 10(2)

In section 142 (acquisition by corporation), in subsection (2A), “(subject to section 144(2))” is omitted.

Sch 7 para 10(3)

In section 143 (acquisition by local highway authority), in subsection (3A), “(subject to section 144(2))” is omitted.

Sch 7 para 10(4)

In section 144, in subsection (2), “the 1981 Act and” is omitted.

Sch 7 para 10(5)

In Schedule 28, in paragraph 1, “The 1981 Act and” and the words from “and in paragraph 2” to the end are omitted.

Sch 7 para 10(6)

The amendments made by this paragraph do not apply to compulsory purchase orders of which notice under section 11 of or, as the case may be, paragraph 2 of Schedule 1 to the Acquisition of Land Act 1981 is published before commencement of this paragraph.

Sch 7 para 10(7)

In Schedule 26 (Urban Development Corporations), after paragraph 14 there are inserted the following paragraphs—

Highways Act 1980 (c. 66)

Sch 7 para 11
Sch 7 para 11(1)

The Highways Act 1980 is amended as follows.

Sch 7 para 11(2)

In section 232(8) after “1990” there is inserted “ and Parts 2 and 6 of the Planning and Compulsory Purchase Act 2004 ”.

Sch 7 para 11(3)

In section 232(9) for the definition of development plan there is substituted—

Sch 7 para 11(4)

Section 259(power to confirm, etc, compulsory purchase order in part) is omitted.

Sch 7 para 11(5)

The amendment made by sub-paragraph (4) does not apply to a compulsory purchase order of which notice under section 11 of or, as the case may be, paragraph 2 of Schedule 1 to the Acquisition of Land Act 1981 is published before the commencement of that sub-paragraph.

Acquisition of Land Act 1981 (c. 67)

Sch 7 para 12

In section 29(5) of the Acquisition of Land Act 1981 for the words “any reference to any owner, lessee or occupier” there are substituted the words “ the reference to a qualifying person for the purposes of section 12(2) ”.

Housing Act 1985 (c. 68)

Sch 7 para 13
Sch 7 para 13(1)

In section 578A of the Housing Act 1985 (modification of compulsory purchase order in case of acquisition of land for clearance), in subsection (2), for “section 13” there is substituted “ sections 13 to 13C ”.

Sch 7 para 13(2)

The amendment made by sub-paragraph (1) does not apply to compulsory purchase orders of which notice under section 11 of the Acquisition of Land Act 1981 is published before commencement of this paragraph.

Education Reform Act 1988 (c. 40)

Sch 7 para 14
Sch 7 para 14(1)

The Education Reform Act 1988 is amended as follows.

Sch 7 para 14(2)

In section 190 (wrongful contracts or disposals), in subsection (6) for the words from “references” to the end there is substituted “ the reference in section 12 of that Act to an owner of the land included reference to the London Residuary Body ”.

Sch 7 para 14(3)

In section 201 (wrongful disposals), in subsection (6), for the words from “references” to the end there is substituted “ the reference in section 12 of that Act to an owner of the land included reference to the local education authority concerned ”.

Sch 7 para 14(4)

The amendments made by this paragraph do not apply to compulsory purchase orders of which notice under section 11 of the Acquisition of Land Act 1981 (c. 67) is published before commencement of this paragraph.

Housing Act 1988 (c. 50)

Sch 7 para 15
Sch 7 para 15(1)

Paragraph 2 of Schedule 10 to the Housing Act 1988 (modifications of Acquisition of Land Act 1981) is omitted.

Sch 7 para 15(2)

The amendment made by sub-paragraph (1) does not apply to compulsory purchase orders of which notice under section 11 of or, as the case may be, paragraph 2 of Schedule 1 to the Acquisition of Land Act 1981 is published before commencement of this paragraph.

Planning and Compensation Act 1991 (c. 34)

Sch 7 para 16

In Schedule 4 to the Planning and Compensation Act 1991 Part 3 is omitted.

Local Government Act 1992 (c. 19)

Sch 7 para 17

In section 14(5) of the Local Government Act 1992 (structural changes which may be recommended by the Electoral Commission), paragraph (d) is omitted.

...

Sch 7 para 18

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Environment Act 1995 (c. 25)

Sch 7 para 19
Sch 7 para 19(1)

The Environment Act 1995 is amended as follows.

Sch 7 para 19(2)

In section 67 (which makes provision for a National Park authority to be the local planning authority) subsections (2) to (4) are omitted.

Sch 7 para 19(3)

In Schedule 14 (periodic review of mineral planning permissions) in paragraph 2(1), in the definition of “first review date”, for “paragraph 5” there is substituted “ paragraphs 3A and 5 ”.

Sch 7 para 19(4)

In Schedule 14 after paragraph 3 there is inserted the following paragraph—

Town and Country Planning (Scotland) Act 1997 (c. 8)

Sch 7 para 20
Sch 7 para 20(1)

The Town and Country Planning (Scotland) Act 1997 is amended as follows.

Sch 7 para 20(2)

In section 26(2)(b) (meaning of “development”), for “local roads authority” there is substituted “ roads authority (as defined by section 151(1) of the Roads (Scotland) Act 1984) ”.

Sch 7 para 20(3)

In section 275 (regulations and orders), after subsection (2) there is inserted—

Sch 7 para 20(4)

In Schedule 10 (periodic review of mineral planning permissions)—

Sch 7 para 20(4)(a)

in paragraph 2(1), in the definition of “first review date”, for “paragraph 5” there is substituted “ paragraphs 3A and 5 ”; and

Sch 7 para 20(4)(b)

after paragraph 3, there is inserted the following paragraph—

Regional Development Agencies Act 1998 (c. 45)

Sch 7 para 21
Sch 7 para 21(1)

Paragraph 1 of Schedule 5 to the Regional Development Agencies Act 1998 (modifications of Acquisition of Land Act 1981) is omitted.

Sch 7 para 21(2)

The amendment made by sub-paragraph (1) does not apply to compulsory purchase orders of which notice has been published under section 11 of or, as the case may be, paragraph 2 of Schedule 1 to the Acquisition of Land Act 1981 (c. 67) before commencement of this paragraph.

Greater London Authority Act 1999 (c. 29)

Sch 7 para 22
Sch 7 para 22(1)

The Greater London Authority Act 1999 is amended as follows.

Sch 7 para 22(2)

In section 337 (publication)—

Sch 7 para 22(2)(a)

for “relevant regional planning guidance” there is substituted “ the regional spatial strategy for a region which adjoins Greater London ”;

Sch 7 para 22(2)(b)

subsection (10) is omitted.

Sch 7 para 22(3)

In section 342(1) (matters to which Mayor is to have regard) for paragraph (a) there is substituted the following—.

Sch 7 para 22(4)

In section 346(b) (Mayor to monitor plans) for “unitary development plan” there is substituted “ local development documents (within the meaning of Part 2 of the Planning and Compulsory Purchase Act 2004) ”.

Countryside and Rights of Way Act 2000 (c. 37)

Sch 7 para 23

In section 86(4) of the Countryside and Rights of Way Act 2000—

Sch 7 para 23(a)

“II,” is omitted;

Sch 7 para 23(b)

at the end there is inserted “ or under Part 2 or 6 of the Planning and Compulsory Purchase Act 2004 ”.

Sch 8

Transitional provisions: Parts 1 and 2

Development plan

Sch 8 para 1
Sch 8 para 1(1)

During the transitional period a reference in an enactment mentioned in section 38(7) above to the development plan for an area in England is a reference to—

Sch 8 para 1(1)(a)

the RSS for the region in which the area is situated or the spatial development strategy for an area in Greater London, and

Sch 8 para 1(1)(b)

the development plan for the area for the purposes of section 27 or 54 of the principal Act.

Sch 8 para 1(2)

The transitional period is the period starting with the commencement of section 38 and ending on whichever is the earlier of—

Sch 8 para 1(2)(a)

the end of the period of three years;

Sch 8 para 1(2)(b)

the day when in relation to an old policy, a new policy which expressly replaces it is published, adopted or approved.

Sch 8 para 1(3)

But the Secretary of State may direct that for the purposes of such policies as are specified in the direction sub-paragraph (2)(a) does not apply.

Sch 8 para 1(4)

An old policy is a policy which (immediately before the commencement of section 38) forms part of a development plan for the purposes of section 27 or 54 of the principal Act.

Sch 8 para 1(5)

A new policy is a policy which is contained in—

Sch 8 para 1(5)(a)

a revision of an RSS;

Sch 8 para 1(5)(b)

an alteration or replacement of the spatial development strategy;

Sch 8 para 1(5)(c)

a development plan document.

Sch 8 para 1(5)(d)

a neighbourhood development plan.

Sch 8 para 1(6)

But—

Sch 8 para 1(6)(a)

an old policy contained in a structure plan is replaced only by a new policy contained in a revision to an RSS;

Sch 8 para 1(6)(b)

an old policy contained in a waste local plan or a minerals local plan is replaced in relation to any area of a county council for which there is a district council only by a new policy contained in a development plan document which is prepared in accordance with a minerals and waste development scheme.

Sch 8 para 1(7)

A new policy is published if it is contained in—

Sch 8 para 1(7)(a)

a revision of an RSS published by the Secretary of State under section 9(6);

Sch 8 para 1(7)(b)

an alteration or replacement of the Mayor of London’s spatial development strategy published in pursuance of section 337 of the Greater London Authority Act 1999 (c. 29).

Sch 8 para 1(7)(c)

a neighbourhood development plan published under section 38B(5) of the principal Act.

Sch 8 para 1(8)

A new policy is adopted or approved if it is contained in a development plan document which is adopted or approved for the purposes of Part 2.

Sch 8 para 1(9)

A minerals and waste development scheme is a scheme prepared in accordance with section 16.

Sch 8 para 1(10)

The development plan mentioned in sub-paragraph (1)(b) does not include a street authorisation map which continued to be treated as having been adopted as a local plan by virtue of paragraph 4 of Part 3 of Schedule 2 to the principal Act.

Structure plans

Sch 8 para 2
Sch 8 para 2(1)

This paragraph applies to proposals for the alteration or replacement of a structure plan for the area of a local planning authority.

Sch 8 para 2(2)

If before the commencement of Part 1 of this Act the authority have complied with section 33(2) of the principal Act (making copies of proposals and the explanatory memorandum available for inspection) the provisions of Chapter 2 of Part 2 of the principal Act continue to have effect in relation to the proposals.

Sch 8 para 2(3)

In any other case—

Sch 8 para 2(3)(a)

the authority must take no further step in relation to the proposals;

Sch 8 para 2(3)(b)

the proposals have no effect.

Sch 8 para 2(4)

If the proposals are adopted or approved by virtue of sub-paragraph (2) above, paragraph 1 of this Schedule applies to the policies contained in the proposals as if—

Sch 8 para 2(4)(a)

they were policies contained in a development plan within the meaning of section 54 of the principal Act;

Sch 8 para 2(4)(b)

the date of commencement of section 38 is the date when the proposals are adopted or approved (as the case may be).

Unitary development plan

Sch 8 para 3
Sch 8 para 3(1)

This paragraph applies to proposals for the alteration or replacement of a unitary development plan for the area of a local planning authority.

Sch 8 para 3(2)

If before the relevant date the authority have not complied with section 13(2) of the principal Act (making copies of the proposals available for inspection)—

Sch 8 para 3(2)(a)

they must take no further step in relation to the proposals;

Sch 8 para 3(2)(b)

the proposals have no effect.

Sch 8 para 3(3)

In any other case paragraph 4 or 5 below applies.

Sch 8 para 4
Sch 8 para 4(1)

This paragraph applies if—

Sch 8 para 4(1)(a)

before the relevant date the local planning authority is not required to cause an inquiry or other hearing to be held by virtue of section 16(1) of the principal Act (inquiry must be held if objections made), or

Sch 8 para 4(1)(b)

before the commencement of Part 2 of this Act a person is appointed under that section to hold an inquiry or other hearing.

Sch 8 para 4(2)

If this paragraph applies the provisions of Chapter 1 of Part 2 of the principal Act continue to have effect in relation to the proposals.

Sch 8 para 4(3)

The relevant date is whichever is the later of—

Sch 8 para 4(3)(a)

the end of any period prescribed by regulations under section 26 of the principal Act for the making of objections to the proposals;

Sch 8 para 4(3)(b)

the commencement of Part 2 of this Act.

Sch 8 para 5
Sch 8 para 5(1)

If paragraph 4 does not apply the provisions of Chapter 1 of Part 2 of the principal Act continue to have effect in relation to the proposals subject to the modifications in sub-paragraphs (2) to (5) below.

Sch 8 para 5(2)

If before the commencement of Part 2 of this Act the local planning authority have not published revised proposals in pursuance of regulations under section 26 of the principal Act—

Sch 8 para 5(2)(a)

any provision of the regulations relating to publication of revised proposals must be ignored,

Sch 8 para 5(2)(b)

the authority must comply again with section 13(2) of the principal Act.

Sch 8 para 5(3)

If before the commencement of Part 2 of this Act the local planning authority have published revised proposals in pursuance of regulations under section 26 of the principal Act the authority must comply again with section 13(2) of that Act.

Sch 8 para 5(4)

Any provision of regulations under section 26 of the principal Act which permits the local planning authority to modify proposals after an inquiry or other hearing has been held under section 16 of that Act must be ignored.

Sch 8 para 5(5)

If such an inquiry or other hearing is held the authority must adopt the proposals in accordance with the recommendations of the person appointed to hold the inquiry or other hearing.

Sch 8 para 6

If proposals are adopted or approved in pursuance of paragraph 4 or 5 above paragraph 1 of this Schedule applies to the policies contained in the proposals as if—

Sch 8 para 6(a)

they were policies contained in a development plan for the purposes of section 27 of the principal Act;

Sch 8 para 6(b)

the date of commencement of section 38 is the date when the proposals are adopted or approved.

Sch 8 para 7
Sch 8 para 7(1)

This paragraph applies if at the date of commencement of Part 1 a local planning authority have not prepared a unitary development plan in pursuance of section 12 of the principal Act.

Sch 8 para 7(2)

References in paragraphs 3 to 6 to proposals for the alteration or replacement of a plan must be construed as references to the plan.

Local plan

Sch 8 para 8
Sch 8 para 8(1)

This paragraph applies to proposals for the alteration or replacement of a local plan for the area of a local planning authority.

Sch 8 para 8(2)

If before the commencement of Part 2 of this Act the authority have not complied with section 40(2) of the principal Act (making copies of the proposals available for inspection)—

Sch 8 para 8(2)(a)

they must take no further step in relation to the proposals;

Sch 8 para 8(2)(b)

the proposals have no effect.

Sch 8 para 8(3)

In any other case paragraph 9 or 10 below applies.

Sch 8 para 9
Sch 8 para 9(1)

This paragraph applies if—

Sch 8 para 9(1)(a)

before the relevant date the local planning authority is not required to cause an inquiry or other hearing to be held by virtue of section 42(1) of the principal Act (inquiry must be held if objections made), or

Sch 8 para 9(1)(b)

before the commencement of Part 2 of this Act a person is appointed under that section to hold an inquiry or other hearing.

Sch 8 para 9(2)

If this paragraph applies the provisions of Chapter 2 of Part 2 of the principal Act continue to have effect in relation to the proposals.

Sch 8 para 9(3)

The relevant date is whichever is the later of—

Sch 8 para 9(3)(a)

the end of any period prescribed by regulations under section 53 of the principal Act for the making of objections to the proposals;

Sch 8 para 9(3)(b)

the commencement of Part 2 of this Act.

Sch 8 para 10
Sch 8 para 10(1)

If paragraph 9 does not apply the provisions of Chapter 2 of Part 2 of the principal Act continue to have effect in relation to the proposals subject to the modifications in sub-paragraphs (2) to (5) below.

Sch 8 para 10(2)

If before the commencement of Part 2 of this Act the local planning authority have not published revised proposals in pursuance of regulations under section 53 of the principal Act—

Sch 8 para 10(2)(a)

any provision of the regulations relating to publication of revised proposals must be ignored,

Sch 8 para 10(2)(b)

the authority must comply again with section 40(2) of the principal Act.

Sch 8 para 10(3)

If before the commencement of Part 2 of this Act the local planning authority have published revised proposals in pursuance of regulations under section 53 of the principal Act the authority must comply again with section 40(2) of that Act.

Sch 8 para 10(4)

Any provision of regulations under section 53 of the principal Act which permits the local planning authority to modify proposals after an inquiry or other hearing has been held under section 42 of that Act must be ignored.

Sch 8 para 10(5)

If such an inquiry or other hearing is held the authority must adopt the proposals in accordance with the recommendations of the person appointed to hold the inquiry or other hearing.

Sch 8 para 11
Sch 8 para 11(1)

This paragraph applies if the Secretary of State thinks—

Sch 8 para 11(1)(a)

that the conformity requirement is likely to give rise to inconsistency between the proposals and relevant policies or guidance, and

Sch 8 para 11(1)(b)

that it is necessary or expedient to avoid such inconsistency.

Sch 8 para 11(2)

The Secretary of State may direct that to the extent specified in the direction the conformity requirement must be ignored.

Sch 8 para 11(3)

The Secretary of State must give reasons for the direction.

Sch 8 para 11(4)

The conformity requirement is—

Sch 8 para 11(4)(a)

the requirement under section 36(4) of the principal Act that the local plan is to be in general conformity with the structure plan;

Sch 8 para 11(4)(b)

the prohibition under section 43(3) of the principal Act on the adoption of proposals for a local plan or for its alteration or replacement which do not conform generally with the structure plan.

Sch 8 para 11(5)

Relevant policies and guidance are—

Sch 8 para 11(5)(a)

national policies;

Sch 8 para 11(5)(b)

advice contained in guidance;

Sch 8 para 11(5)(c)

policies in the RSS.

Sch 8 para 12

If proposals are adopted or approved in pursuance of paragraphs 9 to 11 above paragraph 1 of this Schedule applies to the policies contained in the proposals as if—

Sch 8 para 12(a)

they were policies contained in a development plan for the purposes of section 54 of the principal Act;

Sch 8 para 12(b)

the date of commencement of section 38 is the date when the proposals are adopted or approved.

Sch 8 para 13
Sch 8 para 13(1)

This paragraph applies if at the date of commencement of Part 1 a local planning authority have not prepared a local plan in pursuance of section 36 of the principal Act.

Sch 8 para 13(2)

References in paragraphs 8 to 12 to proposals for the alteration or replacement of a plan must be construed as references to the plan.

Minerals and waste local plans

Sch 8 para 14

Paragraphs 8 to 13 above apply to a minerals local plan and a waste local plan as they apply to a local plan and references in those paragraphs to a local planning authority must be construed as including references to a mineral planning authority and an authority who are entitled to prepare a waste local plan.

Schemes

Sch 8 para 15
Sch 8 para 15(1)

This paragraph applies to—

Sch 8 para 15(1)(a)

the local development scheme which a local planning authority are required to prepare and maintain under section 15 of this Act;

Sch 8 para 15(1)(b)

the minerals and waste development scheme which a county council are required to prepare and maintain for any part of their area for which there is a district council.

Sch 8 para 15(2)

During the transitional period the local planning authority or county council (as the case may be) must include in the scheme as a development plan document—

Sch 8 para 15(2)(a)

any plan or document which relates to an old policy (for the purposes of paragraph 1 above) which has not been replaced by a new policy;

Sch 8 para 15(2)(b)

any proposals adopted or approved by virtue of paragraphs 3 to 12 above.

Savings

Sch 8 para 16
Sch 8 para 16(1)

The repeal by this Act of paragraphs 1 to 4 of Schedule 13 to the principal Act does not affect anything which is required or permitted to be done for the purposes of Chapter 2 of Part 6 of the principal Act during any time when a plan mentioned in any of those paragraphs continues to form part of the development plan by virtue of—

Sch 8 para 16(1)(a)

paragraph 1 of this Schedule, or

Sch 8 para 16(1)(b)

that paragraph as applied by any other provision of this Schedule.

Sch 8 para 16(2)

References to a plan mentioned in any of paragraphs 1 to 4 include any proposal for the alteration or replacement of the plan.

Sch 8 para 16(3)

The development plan is the development plan for the purposes of section 27 or 54 of the principal Act.

Regulations and orders

Sch 8 para 17
Sch 8 para 17(1)

The Secretary of State may by regulations make provision for giving full effect to this Schedule.

Sch 8 para 17(2)

The regulations may, in particular—

Sch 8 para 17(2)(a)

make such provision as he thinks is necessary in consequence of this Schedule;

Sch 8 para 17(2)(b)

make provision to supplement any modifications of the principal Act required by this Schedule.

Sch 8 para 17(3)

The Secretary of State may by order make such provision as he thinks is necessary in consequence of anything done under or by virtue of this Schedule.

Sch 8 para 17(4)

Provision under sub-paragraph (3) includes provisions corresponding to that which could be made by order under Schedule 2 of the principal Act.

Sch 8 para 18

The Secretary of State may by regulations make provision—

Sch 8 para 18(a)

for treating anything done or purported to have been done for the purposes of Part 2 before the commencement of that Part as having been done after that commencement;

Sch 8 para 18(b)

for disregarding any requirement of section 19 in respect of anything done or purported to have been done for the purposes of any other provision of Part 2.

Interpretation

Sch 8 para 19
Sch 8 para 19(1)

References to section 27 of the principal Act must be construed subject to section 28(3)(a) and (c) of that Act.

Sch 8 para 19(2)

RSS must be construed in accordance with Part 1 of this Act.

Sch 8 para 19(3)

Development plan document must be construed in accordance with Part 2 of this Act.

Sch 9

Repeals

Paragraph

Sections 34 to 36.

Paragraph

In section 87(1), in the definition of “dwelling”, “(except in section 29)”.

Paragraph

In section 142(2A), “(subject to section 144(2))”.

Paragraph

In section 143(3A), “(subject to section 144(2))”.

Paragraph

In section 144(2), “the 1981 Act and”.

Paragraph

In Schedule 28, in paragraph 1, “The 1981 Act and” and the words from “and in paragraph 2” to the end.

Paragraph

Part 2.

Paragraph

In section 55(2)(b), the word “local”.

Paragraph

Section 73(3).

Paragraph

Section 76.

Paragraph

Section 83(1).

Paragraph

Sections 106 to 106B.

Paragraph

In section 220(3), the expression “62”.

Paragraph

In section 226, in subsection (1) the first “which” and subsection (2).

Paragraph

Section 245(2) and (3).

Paragraph

In section 284(1), paragraph (a).

Paragraph

In section 287, in subsection (5), paragraph (a) and in each of paragraphs (b) to (e) the words “by virtue of subsection (3)” and subsection (6).

Paragraph

Section 293(4).

Paragraph

Sections 294 to 297.

Paragraph

Section 298(1) and (2).

Paragraph

Sections 299 to 301.

Paragraph

Section 303(6).

Paragraph

In section 303A, in subsection (5) the words “or appointed as one of the persons who are to hold it”, the words “(in addition to what may be recovered by virtue of the appointment of any other person)” and in paragraph (c) the words “(or, in a case where that person is appointed as one of the persons who are to hold the qualifying inquiry, an appropriate proportion of any costs attributable to the appointment of an assessor to assist those persons)” and subsections (7) to (9).

Paragraph

In Schedule 1, paragraph 2, in paragraph 3(7) the words “but paragraph 4 shall apply to such applications instead”.

Paragraph

In Schedule 2, Parts 1, 2 and 3.

Paragraph

In Schedule 7, paragraphs 3 and 4.

Paragraph

In Schedule 13, paragraphs 1 to 4.

Paragraph

In section 10, in subsection (2) the words “shall be made in such form as the authority may require and” and in subsection (3) the word “and” after paragraph (b).

Paragraph

Section 67(2) to (7).

Paragraph

Sections 83 and 84.

Paragraph

In section 91(2), “ “development plan””.

Paragraph

In section 92(2)(a), “83, 84,”.

Paragraph

Section 31(1) and (2).

Paragraph

Section 32.

Paragraph

Section 17(1).

Paragraph

In Schedule 4, Part 3.

Paragraph

In Schedule 18, Part 2 in the entry relating to the Land Compensation Act 1973, “section 36(6) (farm loss payment),”.

Paragraph

Section 242(4).

Paragraph

Sections 243 to 250.

Paragraph

Section 31(1) and (2).

Paragraph

Section 32.