Whereas the Commons of the United Kingdom in Parliament assembled have resolved to authorise the use of resources and the issue of sums out of the Consolidated Fund towards making good the supply which they have granted to Her Majesty in this Session of Parliament: —Be it therefore enacted by the Queen's most Excellent Majesty, by and with the advice and consent of the Lords Spiritual and Temporal, and Commons, in this present Parliament assembled, and by the authority of the same, as follows:—

Paragraph

Whereas the Commons of the United Kingdom in Parliament assembled have resolved to authorise the use of resources and the issue of sums out of the Consolidated Fund towards making good the supply which they have granted to Her Majesty in this Session of Parliament: —

s. 1 — Use of resources for the year that ended with 31 March 2008

The use of resources for the service of the year that ended with 31 March 2008 is authorised to the amount of £1,886,000.

s. 2 — Issue out of the Consolidated Fund for the year that ended with 31 March 2008

The Treasury may issue out of the Consolidated Fund of the United Kingdom and apply to the service of the year ending with 31 March 2008 the sum of £5,780,000.

s. 3 — Use of resources for the year ending with 31 March 2009

The use of resources for the service of the year ending with 31 March 2009 is authorised to the amount of £37,878,310,000 .

s. 4 — Issue out of the Consolidated Fund for the year ending with 31 March 2009

The Treasury may issue out of the Consolidated Fund of the United Kingdom and apply to the service of the year ending with 31 March 2009 the sum of £12,049,636,000.

s. 5 — Appropriation of amounts and sums voted for supply services and limits on appropriations in aid
s. 5(1)

All the amounts and sums authorised by this Act and the other Act mentioned in Schedule 1 to this Act, for the service of the year that ended with 31 March 2008 and of the year ending with 31 March 2009, totalling, as is shown in the said Schedule, £45,305,922,000 in amounts of resources authorised for use and £44,167,900,000 in sums authorised for issue from the Consolidated Fund, are appropriated, and shall be deemed to have been appropriated as from the date of the passing of the Acts mentioned in the said Schedule 1, for the services and purposes specified in Schedule 2 to this Act.

s. 5(2)

Part 2 of Schedule 2 also sets out, for the services and purposes specified in that Part of that Schedule, modifications of the limits set for the purposes of section 2 of the Government Resources and Accounts Act 2000 (c. 20) on the resources applicable as appropriations in aid for the year ending with 31 March 2009.

s. 5(3)

Part 3 of Schedule 2 also sets out, for the services and purposes specified in that Part of that Schedule, the limits for the purposes of section 2 of the Government Resources and Accounts Act 2000 (c. 20) on the resources applicable as appropriations in aid for the year ending with 31 March 2009.

s. 5(4)

The limits as modified by Part 2 of Schedule 2 and those set out in Part 3 of that Schedule shall be deemed to have been in force from 25 November 2008.

s. 5(5)

Subsection (4), so far as it relates to—does not affect the validity of anything to which subsection (6) applies.

s. 5(5)(a)

a reduction set out in the Table in Part 2 of Schedule 2, or

s. 5(5)(b)

a modification so set out which, according to a note to that Part, comprises a reduction,

s. 5(6)

This subsection applies to anything done in accordance with a direction given for the purposes of section 2 of the Government Resources and Accounts Act 2000 (c. 20) during the year ending with 31 March 2009 if (disregarding subsection (4)) —

s. 5(6)(a)

at the time it was done the direction complied with the limit set under a previous Appropriation Act, or

s. 5(6)(b)

that direction would have complied with the limit then in force if that limit had, for the period ending with 23 February 2009, been increased as mentioned in the note in question.

s. 5(7)

The payment of amounts into the Consolidated Fund is not required (by or under any enactment or otherwise) to the extent that permission for their retention is given by the Treasury in anticipation of the giving of directions, by reference to a Statement of Excesses, that will authorise the application of the amounts as appropriations in aid for the service of the year ending with 31 March 2009; but—

s. 5(7)(a)

a permission for the purposes of this subsection expires with the giving by reference to a Statement of Excesses of any direction that authorises the application of resources as appropriations in aid in relation to the Request for Resources or Estimate to which the amounts in question are referable; and

s. 5(7)(b)

if, having given such a permission, the Treasury decide before its expiry not to give the anticipated direction, they must withdraw the permission on making the decision.

s. 5(8)

The abstracts of Schedule 1 and of Schedule 2 which are annexed to this Act shall have effect as part of this Act.

s. 6 — Short title

This Act may be cited as the Appropriation Act 2009.

Sch 1

(Resources authorised for use and Grants out of the Consolidated Fund subject to appropriation)

Sch 2

(Appropriation of amounts and sums voted for supply services and limits on appropriations in aid)

Sch 1

Resources authorised for use and Grants out of the Consolidated Fund subject to appropriation

Paragraph

For the service of the year ended 31 March 2008—Under this Act

Paragraph

For the service of the year ending 31 March 2009—Under Act 2008 c. 3

Paragraph

Under this Act

Sch 2

Appropriation of amounts and sums voted for supply services and limits on appropriations in aid

Sch 2

EXCESSES, 2007-08

Paragraph

Table of–

(a)

the resources authorised for use to make good excesses incurred in meeting the costs of the defence and civil services which are specified in the first column of the Table for the year that ended with 31 March 2008; and

(b)

the sums authorised for issue out of the Consolidated Fund to make good those excesses.

Sch 2

Supplementary, 2008-09

Paragraph

Table of–

(a)

the supplementary resources authorised for use to meet the costs of the services and purposes which are specified in the first column of the Table for the year ending with 31 March 2009;

(b)

the supplementary sums authorised for issue out of the Consolidated Fund to meet those costs;

(c)

supplementary reductions of the resources or sums previously authorised for such use or issue; and

(d)

modifications of the limits set, for the purposes of section 2 of the Government Resources and Accounts Act 2000 (c. 20), on the resources applicable as appropriations in aid to meet those costs.

Paragraph

HQ and associated offices; administration of the Judicial Pension Scheme, administration of the Office of the Information Commissioner and the Judicial Appointments Commission. Costs of running the Office for Judicial Complaints and the Judicial Appointments and Conduct Ombudsman, costs of running the offices of the Legal Services Ombudsman and the Legal Services Complaints Commissioner. Costs of operating the Legal Services Board and the associated Levy.

Paragraph

HM Courts Service as formed under the Courts Act 2003 and associated activities including fine income, netting off and asset recovery incentive scheme, receipts under the victims surcharge, pre-1990 loan charges debt payments, Justices Clerks' Societies, Proportionate Dispute Resolution project, Wider Markets Initiatives; Section 31 grants to Local Authorities; the Office of the Public Guardian and Court of Protection. The establishment and operation of the Supreme Court as formed under the Constitutional Reform Act 2005. The costs associated with the implementation of the Office of Legal Complaints.

Paragraph

Offices of Court Funds, Official Solicitor and Public Trustee; Legal Aid paid through the Criminal Defence Service and Community Legal Service; administration for the Legal Services Commission. Payment of Grant and grant in aid to organisations promoting Ministry of Justice objectives including NDPBs, administration of central government tribunals via the Tribunals Service (including Asylum); costs paid from central funds; the Appellate Committee of the House of Lords and the Judicial Committee of the Privy Council; costs in relation to constitutional offices; Privy Council office; re-imbursement of Lord Lieutenants' expenses; costs in relation to judicial training and the Judicial Offices for England & Wales.

Paragraph

Democracy and constitution, human rights workshops and surveys; promotion of information rights, electoral policy; boundaries and administration, including costs in relation to the policy on the conduct of all national elections and referenda in the UK and local elections, referenda in England & Wales (except certain referenda in Wales), payments in relation to the Electoral Administration Act 2006; establishment and maintenance of the Co-ordinated On-Line Record of Electors (CORE); funding of electoral pilot schemes; policy on the financing and regulation of political parties; citizen and youth engagement.

Paragraph

Parliamentary Boundary Commissions for England & Wales; research into constitution settlement/devolution, costs associated with the ‘Governance of Britain’ programme of constitutional renewal; conduct of MOJ's European and International business in the justice and home affairs field and the management of the UK's relationship with the Crown Dependencies. Contribution from the Treasury in respect of UK payments to the Hague Conference on Private International Law.

Paragraph

Judicial Exchange programmes; sponsorship of the British Institute of International and Comparative Law and bilateral training projects in China; Constitutional education programmes within schools, policy on coroner and cremation services; support to Local Authorities for additional coroner work, payments in relation to the royal inquest, applications for exhumations, cremated repatriated remains and the closing of burial grounds, other legal services; joint initiatives in the Criminal Justice System.

Paragraph

Criminal Policy and Programmes including offender management programmes and the National Probation Service, costs of running Her Majesty's Inspectorate of Prisons, costs of running Her Majesty's Inspectorate of Probation, funding for the Prisons & Probation Services Ombudsman. The Prevention and treatment of drug abuse; crime reduction and prevention; Criminal Injuries Compensation, Criminal Cases Review Commission, counter terrorism and intelligence.

Paragraph

Payments to local authorities in respect of local area agreements, secure accommodation placements, Prisons, Prison Service College, the Parole Board, Youth Justice Board, grants to ‘Prisoners abroad’, welfare to work schemes, payments to other government departments and associated non-cash items.

Paragraph

Climate modelling, risk assessment and adaptation; Support national and global biodiversity; contaminated land grants; environmental protection; maintain water quality and supply; management of inland waterways and obligations under the Water Act 2003; marine environment, species and habitat protection; international policy, research, standard-setting, and monitoring to support sustainable forestry; wildlife management; maintain air and ozone quality; increase UK's environment decontamination capabilities;

Paragraph

Promotion and support for sustainable consumption and production, better waste management and sustainable development; Flood risk management; exotic and endemic animal and plant disease policy portfolio and eradication; regulatory systems for chemicals and pesticides; manage other environmental risks; land drainage and sewerage; noise-mapping; radioactive waste management; pollution emergency response services; Supporting development of farming and cost-sharing initiatives; keeping, movement tracing, international trade and welfare of animals; animal products, dairy hygiene and marketing; champion hygienic production, marketing, delivery and processing in the agriculture, fisheries and food industries; EU compensation payments to producers and support for agriculture; UK's responsibilities under the CITES Convention; fishing industry support; Support a sustainable, secure and healthy food supply; Support for rural and regional development;

Paragraph

Specialist support services, staff management and development; other departmental administration and non-cash costs; publicity, promotion, awareness and publications; knowledge sharing initiatives; commissioned and departmental research and development; grant-in-aid and subsidies to support delivery bodies; surveys, monitoring, statistics, advice and consultancies; funding through Area Based Grants; subscriptions and contributions to international organisations; licensing, approvals and certification; inspections and compliance in accordance with EU regulatory requirements.

Sch 2

NEW ESTIMATE, 2008-09

Paragraph

Table of–

(a)

the resources authorised for use to meet the costs of the services and purposes which are specified in the first column of the Table for the year ending with 31 March 2009;

(b)

the sums authorised for issue out of the Consolidated Fund to meet those costs; and

(c)

the limits set for the purposes of section 2 of the Government Resources and Accounts Act 2000 (c. 20), on the resources applicable as appropriations in aid to meet those costs.

Paragraph

Support for energy-related activities including regulation, civil emergency planning, environmental remediation and support for new and sustainable energy sources, security and non-proliferation; safety, environment and social impact programmes relating to nuclear sites in Central and Eastern Europe and the Former Soviet Union and other countries where future G8 Global Partnership related initiatives may be pursued.

Paragraph

Respond to fuel poverty needs; measures to improve energy efficiency, security and environmental practice; promote and support actions to reduce global greenhouse gas emissions; climate modelling and risk assessment.

Paragraph

Work towards international agreement on climate change; subscriptions and contributions to international organisations and fulfilment of international treaty obligations.

Paragraph

Payments to the Department for Business Enterprise and Regulatory Reform towards the costs of the Regional Development Agencies and the London Development Agency.

Paragraph

Efficient discharge of liabilities falling to the Department, including nuclear waste management and decommissioning and for former coal industry employees.

Paragraph

Specialist support services, staff management and development; other departmental administration and non-cash costs; exchange risk and other guarantee losses; publicity, promotion, publications, knowledge sharing initiatives and departmental research and development; grant-in-aid and subsidies to support delivery bodies; surveys, monitoring, statistics, advice and consultancies; licensing, approvals and certification; inspections and compliance in accordance with international and EU regulatory requirements.

Notes

Sch 2 para 1

The increase of the resources authorised for use in respect of Request for Resources 1 of the Department for Children, Schools and Families Estimate comprises—

Sch 2 para 1(a)

supplementary resources totalling £109,678,000, and

Sch 2 para 1(b)

a reduction of £13,741,000 in consequence of a reallocation of resources to Request for Resources 2 of that Estimate (see also Note 2).

Sch 2 para 2

The increase of the resources authorised for use in respect of Request for Resources 2 of the Department for Children, Schools and Families Estimate comprises—

Sch 2 para 2(a)

supplementary resources totalling £159,366,000, and

Sch 2 para 2(b)

an increase of £13,741,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 1 of that Estimate (see also Note 1).

Sch 2 para 3

The reduction of the resources authorised for use in respect of Request for Resources 1 of the Department of Health Estimate comprises—

Sch 2 para 3(a)

a reduction of £232,798,000 in consequence of a reallocation of resources to Request for Resources 2 of that Estimate (see also Note 4), and

Sch 2 para 3(b)

a reduction of £250,000 in consequence of a reallocation of resources to Request for Resources 3 of that Estimate (see also Note 5).

Sch 2 para 4

The increase of the resources authorised for use in respect of Request for Resources 2 of the Department of Health Estimate comprises—

Sch 2 para 4(a)

supplementary resources totalling £134,526,000, and

Sch 2 para 4(b)

an increase of £232,798,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 1 of that Estimate (see also Note 3).

Sch 2 para 5

The increase of the resources authorised for use in respect of Request for Resources 3 of the Department of Health Estimate is in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 1 of that Estimate (see also Note 3).

Sch 2 para 6

The increase of the resources authorised for use in respect of Request for Resources 1 of the Department for Innovation, Universities and Skills Estimate comprises—

Sch 2 para 6(a)

supplementary resources totalling £500,446,000, and

Sch 2 para 6(b)

an increase of £1,600,000 in consequence of a transfer of functions from the Cabinet Office (see also Note 34).

Sch 2 para 7

The modification set out in the Table on the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Department for Communities and Local Government comprises—

Sch 2 para 7(a)

an increase of the limit of £32,040,000, and

Sch 2 para 7(b)

a subsequent reduction of the limit of £96,152,000.

Sch 2 para 8
Sch 2 para 8(1)

The modification set out in the Table on the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Home Office Estimate comprises—

Sch 2 para 8(1)(a)

an increase the limit of £498,442,000, calculated as described in paragraph (2), and

Sch 2 para 8(1)(b)

a subsequent increase of the limit of £1,059,000.

Sch 2 para 8(2)

The amount of £498,442,000 specified in sub-paragraph 1(a) was calculated by aggregating—

Sch 2 para 8(2)(a)

an increase of £172,242,000, and

Sch 2 para 8(2)(b)

an increase of £326,200,000 in consequence of a transfer of functions from the Foreign and Commonwealth Office (see also Note 13).

Sch 2 para 9

The increase of the sums authorised for issue out of the Consolidated Fund in respect of the Ministry of Justice Estimate comprises—

Sch 2 para 9(a)

supplementary sums totalling £1,049,933,000, and

Sch 2 para 9(b)

a reduction of £1,104,000 in consequence of a transfer of functions to The National Archives (see also Note 11).

Sch 2 para 10

The increase of the resources authorised for use in respect of Request for Resources 1 of the Ministry of Justice Estimate comprises—

Sch 2 para 10(a)

supplementary resources totalling £1,300,252,000, and

Sch 2 para 10(b)

a reduction of £1,104,000 in consequence of a transfer of functions to The National Archives (see also Note 12).

Sch 2 para 11

The increase of the sums authorised for issue out of the Consolidated Fund in respect of The National Archives Estimate is in consequence of a transfer of functions from the Ministry of Justice (see also Note 9).

Sch 2 para 12

The increase of the resources authorised for use in respect of Request for Resources 1 of The National Archives Estimate is in consequence of a transfer of functions from the Ministry of Justice (see also Note 10).

Sch 2 para 13

The modification set out in the Table on the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Foreign and Commonwealth Office Estimate comprises—

Sch 2 para 13(a)

a reduction of the limit of £326,200,000 in consequence of a transfer of functions to the Home Office (see also Note 8), and

Sch 2 para 13(b)

a subsequent increase of the limit of £352,300,000.

Sch 2 para 14

The reduction of the sums authorised for issue out of the Consolidated Fund in respect of the Department for Business, Enterprise and Regulatory Reform Estimate comprises—

Sch 2 para 14(a)

supplementary sums totalling £934,955,000, and

Sch 2 para 14(b)

a subsequent reduction of £2,377,207,000 in consequence of a transfer of functions to the Department of Energy and Climate Change (see also Note 36).

Sch 2 para 15

The reduction of the resources authorised for use in respect of Request for Resources 1 of the Department for Business, Enterprise and Regulatory Reform Estimate comprises—

Sch 2 para 15(a)

supplementary resources totalling £37,021,000, and

Sch 2 para 15(b)

a reduction of £1,907,642,000 in consequence of a transfer of functions to the Department of Energy and Climate Change (see also Note 37).

Sch 2 para 16
Sch 2 para 16(1)

The modification set out in the Table on the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Department for Business, Enterprise and Regulatory Reform Estimate comprises—

Sch 2 para 16(1)(a)

a reduction of the limit of £20,115,000, and

Sch 2 para 16(1)(b)

a subsequent reduction in the limit of £1,068,963,000, calculated as described in sub-paragraph (2).

Sch 2 para 16(2)

The amount of £1,068,963,000 specified in sub-paragraph 1(b) was calculated by aggregating—

Sch 2 para 16(2)(a)

an increase of £8,218,000, and

Sch 2 para 16(2)(b)

a reduction of £1,077,181,000 in consequence of a transfer of functions to the Department of Energy and Climate Change (see also Note 38).

Sch 2 para 17

In Part 28 of Schedule 2 of the Appropriation (No. 2) Act 2008 (c. 8), the title of the Estimate which is now entitled UK Atomic Energy Authority Pension Schemes was Department for Business, Enterprise and Regulatory Reform: UKAEA pension schemes.

Sch 2 para 18

The reduction of the sums authorised for issue out of the Consolidated Fund in respect of the Department for Environment, Food and Rural Affairs Estimate comprises—

Sch 2 para 18(a)

supplementary sums totalling £502,610,000,

Sch 2 para 18(b)

a reduction of £10,000 in consequence of a transfer of functions to the Department for Work and Pensions (see also Note 22), and

Sch 2 para 18(c)

a reduction of £597,027,000 in consequence of a transfer of functions to the Department of Energy and Climate Change (see also Note 36).

Sch 2 para 19

The reduction of the resources authorised for use in respect of Request for Resources 1 of the Department for Environment, Food and Rural Affairs Estimate comprises—

Sch 2 para 19(a)

supplementary resources totalling £331,749,000,

Sch 2 para 19(b)

a reduction of £598,444,000 in consequence of a transfer of functions to the Department of Energy and Climate Change (see also Note 37), and

Sch 2 para 19(c)

a reduction of £13,081,000 in consequence of a reallocation of resources to Request for Resources 2 of that Estimate (see also Note 21).

Sch 2 para 20
Sch 2 para 20(1)

The modification set out in the Table on the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Department for Environment, Food and Rural Affairs Estimate comprises—

Sch 2 para 20(1)(a)

a reduction of the limit of £101,121,000, calculated as described in paragraph (2), and

Sch 2 para 20(1)(b)

a subsequent increase of the limit of £86,934,000.

Sch 2 para 20(2)

The amount of £101,121,000 specified in sub-paragraph 1(a) was calculated by aggregating—

Sch 2 para 20(2)(a)

£88,430,000, and

Sch 2 para 20(2)(b)

£12,691,000 in consequence of a transfer of functions to the Department for Work and Pensions (see also Note 25).

Sch 2 para 21

The increase of resources authorised for use in respect of Request for Resources 2 of the Department for Environment, Food and Rural Affairs Estimate is in consequence of a reallocation of resources from Request for Resources 1 of that Estimate (see also Note 19).

Sch 2 para 22

The increase of the sums authorised for issue out of the Consolidated Fund in respect of the Department for Work and Pensions Estimate comprises—

Sch 2 para 22(a)

supplementary sums totalling of £3,692,927,000,

Sch 2 para 22(b)

an increase of £10,000 in consequence of a transfer of functions from the Department for Environment, Food and Rural Affairs (see also Note 18),and

Sch 2 para 22(c)

an increase of £475,000 in consequence of a transfer of functions from the Cabinet Office (see also Note 33).

Sch 2 para 23

The increase of the resources authorised for use in respect of Request for Resources 1 of the Department for Work and Pensions Estimate comprises—

Sch 2 para 23(a)

supplementary resources totalling of £135,702,000, and

Sch 2 para 23(b)

an increase of £43,815,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 5 of that Estimate (see also Note 28).

Sch 2 para 24

The increase of the resources authorised for use in respect of Request for Resources 2 of the Department for Work and Pensions Estimate comprises—

Sch 2 para 24(a)

supplementary resources totalling £2,659,941,000, and

Sch 2 para 24(b)

an increase of £38,522,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 5 of that Estimate (see also Note 28).

Sch 2 para 25
Sch 2 para 25(1)

The modification set out in the Table on the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 2 of the Department for Work and Pensions Estimate comprises—

Sch 2 para 25(1)(a)

a reduction of the limit of £43,332,000, calculated as described in paragraph (2), and

Sch 2 para 25(1)(b)

a subsequent increase of the limit of £51,137,000.

Sch 2 para 25(2)

The amount of £43,332,000 specified in sub-paragraph (1) was calculated by aggregating—

Sch 2 para 25(2)(a)

a reduction of £56,023,000, and

Sch 2 para 25(2)(b)

an increase of £12,691,000 in consequence of a transfer of functions from the Department for Environment, Food and Rural Affairs (see also Note 20).

Sch 2 para 26

The increase of the resources authorised for use in respect of Request for Resources 3 of the Department for Work and Pensions Estimate comprises—

Sch 2 para 26(a)

supplementary resources totalling £1,644,463,000, and

Sch 2 para 26(b)

an increase of £26,810,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 5 of that Estimate (see also Note 28).

Sch 2 para 27

The increase of the resources authorised for use in respect of Request for Resources 4 of the Department for Work and Pensions Estimate comprises—

Sch 2 para 27(a)

supplementary resources totalling £245,317,000, and

Sch 2 para 27(b)

an increase of £7,478,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 5 of that Estimate (see also Note 28).

Sch 2 para 28

The reduction of the resources authorised for use in respect of Request for Resources 5 of the Department for Work and Pensions Estimate comprises—

Sch 2 para 28(a)

supplementary resources totalling £113,487,000,

Sch 2 para 28(b)

an increase of £1,030,000 in consequence of a transfer of functions from the Cabinet Office (see also Note 34),

Sch 2 para 28(c)

a reduction of £43,815,000 in consequence of a reallocation of resources to Request for Resources 1 of that Estimate (see also Note 23),

Sch 2 para 28(d)

a reduction of £38,522,000 in consequence of a reallocation of resources to Request for Resources 2 of that Estimate (see also Note 24),

Sch 2 para 28(e)

a reduction of £26,810,000 in consequence of a reallocation of resources to Request for Resources 3 of that Estimate (see also Note 26), and

Sch 2 para 28(f)

a reduction of £7,478,000 in consequence of a reallocation of resources to Request for Resources 4 of that Estimate (see also Note 27).

Sch 2 para 29

The increase of the sums authorised for issue out of the Consolidated Fund in respect of the HM Treasury Estimate comprises—

Sch 2 para 29(a)

supplementary sums totalling of £27,515,611,000, and

Sch 2 para 29(b)

a reduction of £273,000 in consequence of a transfer of functions to the Cabinet Office (see also Note 33).

Sch 2 para 30

The increase of the resources authorised for use in respect of Request for Resources 1 of the HM Treasury Estimate comprises—

Sch 2 para 30(a)

supplementary resources totalling of £20,750,582,000,

Sch 2 para 30(b)

a reduction of £273,000 in consequence of a transfer of functions to the Cabinet Office (see also Note 34),

Sch 2 para 30(c)

an increase of £3,675,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 2 of that Estimate (see also Note 31), and

Sch 2 para 30(d)

an increase of £2,200,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 3 of that Estimate (see also Note 32).

Sch 2 para 31

The reduction of the resources authorised for use in respect of Request for Resources 2 of the HM Treasury Estimate is in consequence of a reallocation of resources to Request for Resources 1 of that Estimate (see also Note 30).

Sch 2 para 32

The increase of the resources authorised for use in respect of Request for Resources 3 of the HM Treasury Estimate comprises—

Sch 2 para 32(a)

supplementary resources totalling of £2,935,000, and

Sch 2 para 32(b)

a reduction of £2,200,000 in consequence of a reallocation of resources to Request for Resources 1 of that Estimate (see also Note 30).

Sch 2 para 33

The increase of the sums authorised for issue out of the Consolidated Fund in respect of the Cabinet Office Estimate comprises—

Sch 2 para 33(a)

supplementary sums totalling of £48,289,000,

Sch 2 para 33(b)

a reduction of £475,000 in consequence of a transfer of functions to the Department for Work and Pensions (see also Note 22), and

Sch 2 para 33(c)

an increase of £273,000 in consequence of a transfer of functions from HM Treasury (see also Note 29).

Sch 2 para 34

The increase of the resources authorised for use in respect of Request for Resources 1 of the Cabinet Office Estimate comprises—

Sch 2 para 34(a)

supplementary resources totalling of £54,985,000,

Sch 2 para 34(b)

a reduction of £1,600,000 in consequence of a transfer of functions to the Department for Innovation, Universities and Skills (see also Note 6),

Sch 2 para 34(c)

a reduction of £1,030,000 in consequence of a transfer of functions to the Department for Work and Pensions (see also Note 28), and

Sch 2 para 34(d)

an increase of £273,000 in consequence of a transfer of functions from HM Treasury (see also Note 30).

Sch 2 para 35
Sch 2 para 35(1)

The modification set out in the Table on the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Security and Intelligence Agencies Estimate comprises—

Sch 2 para 35(1)(a)

an increase of £10,811,000, and

Sch 2 para 35(1)(b)

a subsequent reduction of the limit of £2,701,000.

Sch 2 para 36

The sums authorised for issue out of the Consolidated Fund in respect of the Department of Energy and Climate Change Estimate comprise—

Sch 2 para 36(a)

sums totalling £2,377,207,000 that are authorised for issue out of the Consolidated Fund in respect of that Estimate in consequence of a transfer of functions from the Department for Business, Enterprise and Regulatory Reform (see also Note 14),

Sch 2 para 36(b)

sums totalling £597,027,000 that are authorised for issue out of the Consolidated Fund in respect of that Estimate in consequence of a transfer of functions from the Department for Environment, Food and Rural Affairs(see also Note 18), and

Sch 2 para 36(c)

other sums totalling £103,276,000.

Sch 2 para 37

The resources authorised for use in respect of Request for Resources 1 of the Department of Energy and Climate Change Estimate comprise—

Sch 2 para 37(a)

resources totalling £1,907,642,000 that are authorised for use in respect of that Request for Resources in consequence of a transfer of functions from the Department for Business, Enterprise and Regulatory Reform (see also Note 15),

Sch 2 para 37(b)

resources totalling £598,444,000 that are authorised for use in respect of that Request for Resources in consequence of a transfer of functions from the Department for Environment, Food and Rural Affairs (see also Note 19),and

Sch 2 para 37(c)

other resources totalling £303,285,000.

Sch 2 para 38

The initial limit set on resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Department of Energy and Climate Change Estimate comprises—

Sch 2 para 38(a)

£267,850,000, and

Sch 2 para 38(b)

£1,077,181,000 in consequence of a transfer of functions from the Department for Business, Enterprise and Regulatory Reform (see also Note16).